UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 4 of 6) <br /> VIII . MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel Is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? ® ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, 1:1 1:1functional) tested , and confirmed operational? <br /> 19 Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with a El El <br /> proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? nX ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected, functionally tested, and confirmed operational? Q ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ❑ ❑ 9 <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically <br /> disconnected? ❑ ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? ❑ El El <br /> sensors initiate positive shut down? (Check all that apply.) 0 Sump [:1 Under-Dispenser Containment <br /> If alarms are relayed to a remote monitoring station, is all communications equipment (e .g . , modem) operational? ❑ ❑ Q <br /> For any answer of "N" above, describe in Section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> X. INJANK ' GAUGING TESTING <br /> RI Check this box If tank gauging is used only for inventory control . (Do not complete this section) <br /> ❑ Check this box if NO tank gauging equipment is installed . (Do not complete this section.) Y N NA <br /> This section must be completed if in-tank gauging Is used to perform leak detection monitoring, <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including testing for <br /> round faults? N ❑ ❑ <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally <br /> tested , and confirmed operational? 0 ❑ ❑ <br /> Was accuracy of system's product level readings tested? ❑ ❑ 0 <br /> Was accuracy of system's water level readings tested? ❑ ❑ Q <br /> Were all probes reinstalled properly? ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? []X ❑ ❑ <br /> For any answer of "N" above, describe in Section XI how and when these deficiencies were or will be corrected. <br /> XI . COMMENTS <br /> Y = Yes, N = No, NA = Not Applicable <br />