My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
500
>
2200 - Hazardous Waste Program
>
PR0514476
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2020 1:16:49 PM
Creation date
9/29/2020 3:59:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514476
PE
2229
FACILITY_ID
FA0010973
FACILITY_NAME
JIFFY LUBE #2322
STREET_NUMBER
500
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06208002
CURRENT_STATUS
01
SITE_LOCATION
500 E KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
514
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consolidated Contingency Plan <br /> Haza,c: <br /> ,. , 0!� fir Materials,Hazardous Waste&Underground Storage Tanks <br /> FACILITY IDENTIFICATION <br /> BUSINESS NAME FACILITY ID# DATE <br /> Jiffy Lube Store #2322 1/20/2014 <br /> EMERGENCY CONTAINMENT& CLEAN-UP PROCEDURES <br /> 32 Containment, Prevention&Clean-Up <br /> check all that apply: <br /> Indicateyour procedures for: . ................................................................................................................................................................................ <br /> Z provide structural physical barrier (e.g. monitor for leaks, ruptures, pressure build-up, <br /> portable spill containment walls) <br /> etc <br /> 1. containing spills, releases, ............................................................................................................. ................................................................................................................................................................... <br /> provide absorbent physical barrier cover or block floor&/or storm drains <br /> fires or explosions, & <br /> .................... ............................ ..................................................................................................................... <br /> 2. preventing and mitigating Z built-in berm in work/storage area <br /> F] automatic fire suppression system <br /> ................................................................................................................................................... .................................................................................................................................. <br /> associated harm to persons, 1 Z stop processes Wor operations i [j automatic/electronic equipment shut-off system <br /> property &the environment: ..................................................................................................................... ..................... ......................................................................................................................... <br /> Z shut-off water, gas, electrical utilities as <br /> Z call 911 for public emergency responder <br /> appropriate appro assistance/medical aid <br /> .......................................................................... ................................ ................................................................. ................................ <br /> ❑ provide protective equipment for on-site Z eliminate sources of ignition for flammable <br /> response team <br /> hazards(e.g.fuel,propane) <br /> ............ .......... .............. ............................................................................................................. ........... <br /> notify & evacuate persons in all threatened remove or isolate containers / area as <br /> areas appropriate <br /> ................................-.......................................................................................................................................................................................................................................................................................................................................... <br /> Z account for evacuated persons immediately <br /> after evacuation call <br /> ........................................................................ .................. .............. <br /> ❑ <br /> other(specify): <br /> 34 <br /> check all that apply: <br /> Indicateyour clean-up procedures: ...........................................I.................I........................................................................................_- .........---- .............................................................. ................................- <br /> Z hire licensed hazardous waste contractor <br /> ..................................................................................................................................................................................................... ..................................... ................. ......................I--................. <br /> use absorbent material for spills with subsequent proper labeling,storage and hazardous waste <br /> disposal as appropriate <br /> ................................ I I...................................................................................................................................................................I.....................I................................................................................................................................ <br /> r] suction using shop vacuum with subsequent proper labeling,storage and hazardous waste disposal as <br /> appropriate <br /> .................................................................................... ............................................................................................................................... ....................................................................I.................................................................... <br /> ❑ wash/decontaminate equipment w/containment&disposal of effluent/rinsate as hazardous waste <br /> ...........I........................... ................................................................-................... ............................................................................................................................ ..................................................................................... <br /> Z provide safe temporary storage of emergency-generated wastes <br /> ...........................................-.......................................... <br /> ❑ <br /> other(specify): <br /> 35 Evacuation Coordinator&Assembly Area <br /> Provide name I position of <br /> evacuation coordinator who will <br /> account for all on-site employees <br /> and / or site visitors after <br /> evacuation: Name: <br /> General Manager <br /> Identify / describe emergency specify:South of the Building Pep Boys Parking Lot <br /> assembly area for evacuees: <br /> Identify the location where your Specify: <br /> Upper Bay/Lower Bay <br /> evacuation route/map is posted: <br /> Other facility evacuation i specify:Customer Waiting and Office Area: Through entrance/exit doors <br /> procedures: <br /> Upper Bay I)Through entrance/exit doors or 2) Large Bay Doors; <br /> Lower Bay: Exit up stairs and through large bay doors. <br /> .............................................................................................................................. <br /> Page CP 3: Emergency containment&clean-up procedures, Earthquake vulnerability <br />
The URL can be used to link to this page
Your browser does not support the video tag.