Laserfiche WebLink
sOARO OF TRUSTEES SAN JVAOUIN LOCAL HEALTH OISTRIG <br /> James Culberleon, Pres. SERVING <br /> Palricla E. Vannuccl, Sac'y. City of Lodi <br /> Anlhonalte van Spronsen 1601 East Hazelton Avenue, P. O. Box 2009 San Joaquin County <br /> Earl Plmenlel Stockton, California 95201 City of Escalon <br /> pb <br /> Fern auee Clty of Manteca <br /> Oanlel L. Flores 209/466-6781 Cltyof Ripon <br /> John 0. most, M.O. Clly of Stockton <br /> William J. Wada JoQI Khanna, M.O., M.P.H., Olstrict Health Officer City of Tracy <br /> Mary Anna Lova San Joaquin County <br /> San Joaquin County <br /> Facility Name fyY>.6e,Yr/X1nr1 <br /> Address o�� 9D I <br /> Date of Inspection InspectorL.4w.101 &L <br /> y" <br /> MONITORING ALTERNATIVE .97 SZDO qj <br /> Limited to undernround storage tanks which have infrequent inputs and withdrawals and <br /> where the Iiquic: level in the tank can be measured to an accuracy of +5 gallons or less <br /> when the tank is half full . <br /> Thismonitoring alternative shall include: <br /> VZ <br /> Annual precision test on tank and piping. <br /> ZTank gauging performed as follows: <br /> Tank must be capable of being secured to prevent unauthorized inputs and <br /> withdrawals. <br /> Tank must have no inputs or withdrawals for at least a 48 hour period <br /> (2 days) at the end of consecutive periods lasting up to 7 days. <br /> (For example: tank in use Monday through Friday, then locked <br /> over weekend) . <br /> Liquid level measurements are taken at the beginning and end of the <br /> monitoring period (lasting at least 48 hours) . <br /> (For example: level measured and recorded Friday night before <br /> / locking and again on Monday morning before opening. ) <br /> If liquid level varies more than 1% of the tank volume or 5 gallons, which <br /> ever is less , between measurements , an unauthorized release shall be <br /> assumed to have occurred and shall be reported to the local agency within <br /> 24 hours, as per Article 5, Sect. 2652 of the regulations and further <br /> evaluations shall be performed to verify or disprove the variations. <br /> Implementation of the monitoring alternative requires that the following circled items be <br /> completed by the dates specified. <br /> Precision test(s) must be performed by 6` 3 aor- <br /> nd results submitted to this <br /> office within 30 days of the test. <br /> C2) Tank gauging must be started immediately. (See instructions above). <br /> If the above compliance dates cannot be met, contact this office prior to the specified <br /> date. <br /> 4/86 UGT 3 <br />