Laserfiche WebLink
RIVERBANK CITY DUMP <br /> SITE NUMBER: 39-AA-0029 <br /> 27TCCR20750- Fiscal budget year 07-08 Public Works will budget$18,000 for <br /> the construction of two concrete bunkers for recyclables. One will be designated for <br /> green waste as a temporary holding area. Only used in an after hour emergency by stand- <br /> by personnel. The city has a contract with JAMC for disposal of green waste and will <br /> remove material from bunker and haul to the facility during the next normal working day. <br /> The second bunker will be designated for broken concrete. This material will be hauled to <br /> Munn& Perkins plant near Escalon Ca. <br /> 27TCCR21140- City staff will hand pick up surface debris and dispose into trash <br /> bin that is located at the site. The city has several yards of uncontaminated top soil for <br /> surface grading and will distribute evenly over site to prevent future erosion. <br /> 27TCCR21142-Any visible material protruding above ground level will be cutoff <br /> at the surface and disposed of. Final grading will be kept as close to natural elevations to <br /> ensure proper drainage and not to impact surrounding area. <br /> Notes: <br /> c.) City of Riverbank contracts with Gilton Solid Waste Management <br /> INC. and they haul all sweepings to their facility. <br />