Laserfiche WebLink
CERS Consolidated Emergency Response/Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY(Check all that apply): cI I <br /> E 1.VERBAL WARNINGS; [12.PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑3.TELEPHONE; <br /> ❑4.PAGERS; 215.ALARM SYSTEM; ❑6.PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES TI IAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY(Check all that apply): cla. <br /> E [.VERBAL WARNINGS; ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM; 0 3.TELEPHONE; <br /> ❑4.PAGERS; E 5.ALARM SYSTEM; ❑6.PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION; CIS, <br /> PRIMARY EMERGENCY COORDINATOR NAME: Tim Combs PHONE NO.:(209) 333-6764 PHONE NO.: (209)304-9389 <br /> ALTERNATE EMERGENCY COORDINATOR NAME:Tim Conn PHONE NO.:(209) 333-6779 PHONE NO.: (415)302-5628 <br /> ❑Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: <br /> Note:If more than one alternate emergency coordinator is designated,attach a list in order of rcapansibility. <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applieabIc boxes to indicate your Tituility's proeedUM$fpr co laining rcvcnting.and Initigaling rel.easex,fires artd or r:xplosinas. <br /> El1. MONITOR FOR LEAKS,RUPTURES,PRESSURE BUILD-UP,ETC,; DI. <br /> ❑2. PROVIDE STRUCTURAL PHYSICAL BARRIERS(e.g.,Portable spill containment walls,built-in berms); <br /> [:13. PROVIDE ABSORBENT PHYSICAL BARRIERS(e.g.,Pads,spill pigs,spill pillows); <br /> [-14. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br /> [:15, LINED TRENCH DRAINS AND/OR SUMPS; <br /> ❑6. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br /> ❑7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br /> ❑8. STOP PROCESSES AND/OR OPERATIONS; <br /> [:19. AUTOMATIC/ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> 10.SHUT OFF WATER,GAS,ELECTRICAL UTILITIES; <br /> 11.CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> 12,NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> El 13.ACCOUNT FOR EVACUATLD PERSONS IMMEDIATELY AFTER EVACUATION; <br /> ❑' i4.PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> D IS.REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br /> ❑ 16.HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> D 17.USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> Q 18.VACUUM SUCTION USING APPROPRIATE VACUUM(e.g.,Intrinsically safe)FOR SPILL CONTROL AND/OR CLEANUP; <br /> ❑19.DECONTAMINATI3 PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> ❑f 20.11ROVIDE SAFETEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> ❑21.OTHER(Specify): D2 <br /> E. FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNAL(S)WILL BE USED TO BEGIN EVACUATION OF THE FAC1i.ITY(Chcck all that apply): t I <br /> E I. BELLS; e2. <br /> ❑2. HORNS/SIRENS; <br /> ©3. VERBAL(i.e.,Shouting); <br /> El 4. OTHER(S crif ); <br /> THE FOLLOWING LOCATION(S)WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S)(e.g.,Parking lot,street comer): E3• <br /> In the parking lot,Muster Station <br /> Note:The EalogcaeX Coordinator must account for all ons+fe ern le I:snc.andvisitir;s after evacuation. <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: a4 <br /> ❑1.WRITTEN PROCEDURES DESCRIBING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> [fl 2.EVACUATION MAP(S)DEPICTING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> ❑3. OTHER(Specify); <br /> Es, <br /> Note:Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan. <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES(Check one of the following): hl. <br /> ❑ 1. HAVE BEEN DF-1ER:MINED NOT NECESSARY; Fire and Police are onsite daily and familar with the location. <br /> HI 2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE(Specify): F2. <br /> Note:Advance arrangements with local fire and police departments,hospitals,state and local emergency response teams,and/or emergency serviccs <br /> contractors should be made for your facility,if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan, <br /> Rev.03/07117 Page 2 of 4 <br />