Laserfiche WebLink
CERS Consolidated Emergency Response/Contingency Plan <br /> H. EARTHQUAKE VULNERABILITY <br /> I dcrnily areas of the Faci lily that are vulnerable to hazardous materials releases due to aeistnic notion.These areas ret vire immediate isolation and its cation. <br /> VULNERABLE AREAS(Check all that apply); Ill. LOCATIONS(e.g.,Shap,outdoor shed,lab): W <br /> (] 1.HAZARDOUS MATERIALS AND/OR WASTE STORAGE AREAS Warehouse <br /> ❑ 2.PROCESS LINES AND PIPING <br /> ❑ 3.LABORATORY <br /> 4.WASTE TREATMENT AREA <br /> Identil moohanieal systems vulnerable to releases f a tills due to carni take-related motion.These a stems 1,e uire immediate isolation and inspection. <br /> VULNERABLE SYSTEMS AND/OR EQUIPMENT(Check all that apply); 111. LOCATIONS: 114. <br /> 1.SHELVES,CABINETS AND/OR RACKS Racks in the warehouse <br /> ❑ 2.TANKS AND SHUT-OFF VALVES <br /> ❑ 3,PORTABLE GAS CYLINDERS <br /> ❑ 4.EMERGENCY SH UT-OFF AND/OR UTILITY VALVES <br /> ❑ 5.SPRINKLER SYSTEMS <br /> ❑ 6.STATIONARY PRESSURIZED CONTAINERS(s.g.,Propane tank) <br /> I. EMPLOYEE TRAINING <br /> Employeo tralning is required for alll employees and/or contractors hatulling hazardous malcrials.andlor hazardous wastes during normal and/or emergency operations. <br /> Most facilities will need to submit a separate Training Plan.However,your CUPA may accept this section a&the Training Plan for some small facilities. <br /> Employee training plans may include the following content: <br /> • Applicable laws and regulations; • Communication and alarm systems; <br /> • Emergency response plans and procedures; • Personal protective equipment; <br /> • Safety Data Sheets; • Use and maintenance of emergency response equipment and supplies <br /> • Hazard communication related to health and safety; (e.g,Fire extinguishers,respirators,spill control materials); <br /> • Methods for safe handling of hazardous substances; • Decontamination procedures; <br /> • Hazards of materials and processes(e.g.,fire,explosion,asphyxiation); • Evacuation procedures and evacuation staging locations; <br /> • Hazard mitigation,prevention and abatement procedures; • Identification of facility areas,equipment,and systems vulnerable to <br /> • Coordination of emergency response actions; earthquakes and other natural disasters. <br /> • Notification procedures for local emergency responders,CUPA, OTHER(Specify): <br /> Cal OES,and onsite personnel; <br /> Check the applicable boxes below to indicate how the employee training program is administered. <br /> ❑ 1. FORMAL CLASSROOM ❑2. VIDEOS j]3, SAFETY MEETINGS ❑4. STUDY GUIDES/MANUALS j1 <br /> ❑5. OTHER(Specify): r2 <br /> ❑6. NOT APPLICABLE SINCE FACILITY HAS NO EMPLOYEES <br /> ❑7. CHECK IF A SEPARATE EMPLOYER TRAINING PLAN IS USED AND UPLOADED TO CERS AS A PDF DOCUMENT 13• <br /> 0 ii. CHECK IF EMPLOYEE TRAINING IS COVERED BY THE ABOVE REFERENCIED CONTENT AND OTHER DOCUMENTS ONSITE 14 <br /> EMPLOYEE TRAINING FREQUENCY AND RECORDKEEPiNC TRAINING MUST BE: <br /> • Provided initially For new cmployees as glom as possible tfllfowing the date of hire. New employees should not work in an unsupervised position that involves <br /> hazat-iotts malerinls handling andlor hazarxlnus waste management without proper(raining; <br /> • Provided within six months from the date of hire for new employees.at a large quantity generator; <br /> • Ongoing and provided at Ir,ast annually; <br /> • Amended prior to a change in process or work assignment; <br /> • Given upon modification to the Emergency Response/Contingency Plan, <br /> Large Quantity Generator Training:Large quaviity generators(1,000 kg or more)must ro0n written plan and documentation of employee training which inchidea: <br /> •A written description of the type and amount ofborh initial and ongoing training that will be&Cl)to persons fillingeachjob position having responsibility for hazftMous <br /> waste managpntent and/or emergency response. <br /> • The name,job title and job description for each position at the facility related to hazardous waste management. <br /> • Current employee training records must be retained until closure of the facility and former employee training records must be retained for at least three years after <br /> termination of employment. <br /> Small Quantity Generator Training: Small quantity generators(less than 1,000 kg) must include basic hazardous waste management and emergency response <br /> procedures hat a written employee training plan and training rceoTds ore nni mqu}red. in order to show that the facility has met the small quantity generator employee <br /> Irainiog requirement,all employrc Iraining plan and raining rccurds may he made available, <br /> Hazardous Materials Business Plan Tralning:Businesses must provide initial and annual employee training that includes the content referenced above. The training <br /> may be Rased ort thejob position and training records must be made available fora period ofrrl Bast three years, <br /> J. LIST OF ATTACHMENTS <br /> Check one of the following: Jr <br /> ❑ 1. NO ATTACHMENTS ARE REQUIRl,i7;or <br /> JS 2. THE FOLLOWING DOCUMENTS ARE ATTACHED:S;4,c /'tee P J2• <br /> Rev.03/07/17 Page 4 of 4 <br />