Laserfiche WebLink
12-17-201 7:34PM FROM SACRAMENTO EMC 9169252816 P_ 5 <br /> Distribution: Form.38-1 Summary of Source Test Results Report Number 106609 <br /> Firm Test Date: IV16/01 <br /> Pamit Saviccs <br /> Entiarcmcm Savi= <br /> Technical Semces Test Time: <br /> PI-9 Run A: 09:30 <br /> RN`s Run B: <br /> llAPCO <br /> Run C.- <br /> Source <br /> :Source fnformation Facility Parameters <br /> GDF Name and Address GDF Representative and Title: Compartment Size,Gallons <br /> Pacific Gas& Electric Co.(PGE 115) Jim Jarvis <br /> Victor Service Center Compartment#1 <br /> 9575 East Victor Road GDF Phone No. CompazUnent 42 <br /> Victor.Ca 95253 209-942-1566 Compartment#3 <br /> 209-942-1676 <br /> Operating Parameters: Manifolded7 Y Or N <br /> Makc and Modcl of Tank: Unknown Phase 11 System Type: Balance <br /> Number of Gasoline Nozzles: (1)one Make and Model of PN valve: Unknown <br /> Compartments#: #1 #2 #3 Total <br /> Product Grade t)nlead <br /> Actual Compartment Capacity,gallons 524.69 <br /> Gasoline Volume,gallons. 196.76 <br /> Ullage,gallons(#2-#3) 327.93 <br /> Phase I System Type Balance <br /> Initial Pressure (in H20) 2.004 2.00" 2.00" <br /> Pressure After 1 minute (in U20) 1.27" <br /> Pressure After 2 minutes (in x20) .82" " <br /> Pressure After 3 minutes (in H20) .54" K K <br /> Pressure After 4 Minutes (in 1-120) .37" " <br /> Pressure After 5 Minutes (in H20) .26" <br /> Allowable Final Pressure from Table 38-1 .20" " <br /> Teat Status(circle one) Pass Fail Pass__T Fail Pass Fail Pass Fail <br /> Test Conducted by: Test Company: Date and Time of Test: <br /> Sacramento Equipment Maintenance Company,Inc. <br /> Tomm Steiger 2533 Connie Drive 11116/01 09:30 <br /> Sacramento,Ca 95815 <br /> wo#106609 (916-925-2716)(916-925-2816 fax) <br /> email:ssacemc(§rcip.com <br /> v:\county\0000f\st3 8.wpd <br />