Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM(Page a of sl <br /> VIII. MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? 9 ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, El 1:1functional] tested,and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with El F1their proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? ❑ ❑ ❑X <br /> Was the monitoring panel's backup battery visually inspected,functionally tested,and confirmed operational? ❑ ❑ ❑X <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ❑ ❑ Q <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically Eldisconnected? <br /> El Does the turbine automafically shut down if the piping secondary containment monitoring system detects a leak? El 11Which sensors initiate positive shut down? (Check aq that apply.) E]Sump Elunder-DispenserContainment 21 <br /> If alarms are relayed to a remote monitoring station.is all communications equipment(e.g.,modem)operational? ❑ ❑ ❑K <br /> For any answer of"N"above,describe in Section 1X how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> SIMPLE MONITOR SITE ONE SUMP ONE AND ONE ANNULAR SPACE SENSOR <br /> X. IN-TANK GAUGING TESTING <br /> ❑Check this box if tank gauging is used only for inventory control.(Do not complete this section.) <br /> X]Check this box if NO tank gauging equipment is installed.(bo not complete this section.) Y N NA <br /> This section must be completed if in-tank gauging is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testing for El E] E]round faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely,functionally 1:1 El Eltested,and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ <br /> Were all items on the equipment manufacturers maintenance checklist completed? ❑ ❑ I ❑ <br /> For any answer of"N"above, describe in Section Xl how and when these deficiencies were or will be corrected. <br /> X1. COMMENTS <br /> Y=Yes,N=No,NA=Not Applicable <br />