My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
1800
>
2300 - Underground Storage Tank Program
>
PR0231036
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 2:23:12 PM
Creation date
10/2/2020 9:22:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231036
PE
2361 - UST FACILITY
FACILITY_ID
FA0003761
FACILITY_NAME
ST JOSEPHS HOSPITAL
STREET_NUMBER
1800
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12718044
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
1800 N CALIFORNIA ST STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> - RESPONSE PLAN -PAGE 1 (One form per facility) <br /> TYPE OF ACTION ❑ 1,NEW PLAN 2.CHANGE OF INFORMATION Rol. <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) <br /> BUSINES NAME(Same as FACILITY NME) R� <br /> BUSINESS j ADDRESS R03. C11} Rns.iolCEJ-AGT15RYLAO <br /> It. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> If safe to do so,facility personnel will take immediate measures to control or slop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> D Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> D Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become loo saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 rinds that <br /> it is non-hazardous. Used absorbent material, reusable or waste, will be stored in a properly labeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> D Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material.If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 rinds <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-bazardous)from sumps,spill containers,etc,will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> L Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment-, <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> M. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ONSITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete nly if applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIO. R2n. R30. <br /> Ri 1. R21, R31. <br /> R12. R22. R32. <br /> R13. R23, R33. <br /> R14. R24. R34. <br /> R15. R25. R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Rao. TITLE 100./� <br /> L* R- Gt ASSK, C- k <br /> NAME , 090 tA AWKIIJS Rat. TITLE C-Alsf 6 VEiYC,.--,6, R51. <br /> NAME COQ VZRA R42. TITLE L[ E�1 D EA wtj�oz R52. <br /> NAME R43. TITLE R53• <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UN. h-HORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑Additional system testing or data collection IV Inspection by qua]ired persons ❑Recalibration of equipment <br /> Other: <br /> R60. <br /> UST Response Plan(1217010)-1/3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.