Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: 10/26/2020 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> -------------------r----------------------------------------- <br /> Sit-Address_ST JOSEPHS HOSPITAL 1940 N.CALIFORNIA STREET STOCKTON CA 95264 <br /> Cemeeery IN <br /> . . . . . . . . . . . . . . . . N <br /> - - - - - . _ . . _ _ . . - - - - - - - <br /> *PIFDIG; _ _ <br /> (UMOWS) <br /> .. . . . . . . . . . . . . . . - - . - <br /> Dravzne of <br /> Ptp>�ecdt of ALL DAY <br /> mmip and UDC's. . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . .. . . . . . . . <br /> &zwmg is <br /> awmate,we . . . . . . . . . . . . . . . . . . <br /> cannot specuiata . . . . . . . <br /> blue prints. . _ . . _ . _ <br /> p <br /> . . . . . . . . . . . . . _ . . _ . O <br /> APW ulama Lauk ground Ar am nor vrsible to flea 5 dri&laclenicrmi are a <br /> prokzjvnal qpmion on&rnr2mesvle{rforirlhor�rmivnmf{nvpoaas. Drawing <br /> Roe m scala <br /> . . . . . . . . . . . . . - - - -... . . . . . . . . . . . . . . . . . . . I . . . . . . . . - . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> ❑ate map was drawn 10-21-115 <br /> Ios(rurdD.ns <br /> IF you already have a diagram that shows all required information,you may include.t rather than this page,with your UDniladng System Certification. On your site plan, <br /> show the general layout of tanks and.piping. Clearly identify locations of the fallowing equipment,if installed:manitorang system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or ekdronic line leak detedtors;and in-tank liquid level <br /> probes('rt used for leakdelection). In the space provided,note the date this Site Pon was prepared. <br /> Page 6 of 6 <br />