My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2200 - Hazardous Waste Program
>
PR0505946
>
COMPLIANCE INFO_2020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2026 7:34:33 PM
Creation date
10/5/2020 2:17:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0505946
PE
2227 - GEN 13<25 TONS PERMIT
FACILITY_ID
FA0003680
FACILITY_NAME
CALIFORNIA TANK LINES INC
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3105 S EL DORADO ST STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Tank Lines, Stockton, CA 95206 <br /> Waste Oil Tank Assessment Report <br /> Title 22 CCR,66265.192(k)(8)--llazardous waste characteristics of the waste(s)that have been or <br /> will be handled. <br /> CoRn meats: <br /> Materials to be stored: Waste Oil <br /> Mazardous Characteristics-NFPA Code—Health (1), Fire(2), Reactivity (0), Specific Hazard (None) <br /> Title 22 CCR,66265.192(k)(9)—independent,qualified professional engineer's inspection of the <br /> systern for the following, <br /> A)Weld cracks or breaks <br /> (B)Scrapes of protective coatings <br /> (C)Corrosion <br /> (D) Any structural damage or inadequacy construction or installation cracks,punctures <br /> damaged fittings. All discrepancies shall be documented in the assessment and remedied before the <br /> trrvrk �;�c em is placed in use. <br /> Comments: <br /> The Professional Engineer has confirmed that the integrity of the AST at this facility has not been <br /> compromised by any of the above-mentioned conditions. <br /> Title 22 CCR,66265.192(k)(10)--All new tanks and ancillary equipment shall he tested for tightness <br /> prior to being placed in use. The results of the test(s)shall be documented in this assessment. <br /> Comments: <br /> NIA. <br /> Title ZZ' CC%66265.192(k)(11)--.Estimated remaining service life of the tank system based on <br /> findings of subsections k 1 through k(10). <br /> ' Comments: <br /> The tank was manufactured in October 2011. Based on visual inspection, the appears to be generally in <br /> good condition and is estimated to have estimated remaining life of 20 years. <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.