My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013675
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DELTA
>
7300
>
2600 - Land Use Program
>
PA-1800316
>
SU0013675
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 1:57:04 PM
Creation date
10/8/2020 8:12:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013675
PE
2625
FACILITY_NAME
PA-1800316
STREET_NUMBER
7300
Direction
W
STREET_NAME
DELTA
STREET_TYPE
AVE
City
TRACY
Zip
95304-
APN
21302038, 21302041
ENTERED_DATE
10/6/2020 12:00:00 AM
SITE_LOCATION
7300 W DELTA AVE
RECEIVED_DATE
10/5/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PA-1800316 – Conditions of Approval 6 <br />5. Storage of at least 1,320 gallons of petroleum aboveground or any amount of petroleum stored <br />below grade in a vault – Aboveground Petroleum Storage Program (HSC Sections 25270.6 & <br />25270 et sec.) <br /> <br /> Spill Prevention, Countermeasures and Control (SPCC) Plan requirement <br /> <br />6. Threshold quantities of regulated substances stored onsite - California Accidental Release <br />Prevention (CalARP) Program (Title 19, Section 2735.4 & HSC Section 25531 et sec. <br /> <br /> Risk Management Plan requirement for covered processes. <br /> <br />4. SAN JOAQUIN COUNCIL OF GOVERNMENTS (Contact: [209] 235-0600). <br /> <br />a. This project is subject to the San Joaquin County Multi-Species Habitat Conservation and Open <br />Space Plan (SJMSCP). This can be up to a 90-day process and it is recommended that the project <br />applicant contact SJMSCP staff as early as possible. It is also recommended that the project <br />applicant obtain an information package. Compliance with the SJMSCP shall be required prior to <br />issuance of any grading or building permits. <br /> <br />5. SOUTH SAN JOAQUIN COUNTY FIRE AUTHORITY (Contact [209] 831-6707) <br /> <br />a. Prior to construction, the applicant shall submit construction documents to the South San Joaquin <br />County Fire Authority for review and approval: <br /> <br />1. Construction documents shall be designed to the current edition of the California Code of <br />Regulations, Title 24, as amended by San Joaquin County Municipal Code. <br /> <br />2. Specify occupancy classifications, type of construction, use and square footage of each <br />structure to be build. Each structure will have its own Fire Permit. <br /> <br />3. Fire protection systems are dependent on occupancy and shall be installed in accordance with <br />the California Fire Code, as amended by the San Joaquin County Municipal Code. <br /> <br />4. Deferred submittals shall be listed on the coversheet of each page. Each deferred submittal <br />shall be submitted, reviewed and approved by SSJCFA prior to installation. <br /> <br />5. If proposed, fire protection water supply must be submitted separately from construction permit. <br />All piping and installation shall be in accordance with CFC Section 507 & NFPA standards. <br /> <br />6. If proposed, fire sprinklers shall be designed by a licensed fire protection contractor or engineer. <br />Hydraulic calculations, specifications and plans shall be submitted prior to issuance of a <br />building permit. <br /> <br />7. Provide a truck turning template which clearly shows the truck turning radius of 29 feet-9 inches <br />inside and 47 feet-7 inches outside. Truck turning template shall show all ingress and egress <br />paths available. <br /> <br />b. Applications received by our offices are subject to the current fee schedule for South San Joaquin <br />County Fire Authority. <br /> <br />1. Application processing fees and minimum plan review fees are due at the time of submittal of <br />construction documents <br /> <br />2. Additional plan review fees, minimum inspection fees and administrative fees are calculated <br />on approval of project and shall be paid prior to issuance of permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.