Laserfiche WebLink
August 27, 2020 <br /> BGG Job No. G 164.01 <br /> development area, soil denitrification factor, rainfall, rainfall nitrate concentration, waste effluent <br /> quantity, and waste effluent nitrate concentration from onsite septic systems. <br /> Mass Transport Soil Properties <br /> Field percolation test results indicate that the surface soils are moderately permeable.The site soils <br /> will permit some infiltration of water through the surface soils.The longer the effluent remains near <br /> the surface, the more biologic treatment may occur. If permeable soils exist to the depth of the <br /> ground water aquifer, it is possible that any remaining surface contaminants may be transported to <br /> the saturated zone of the upper aquifer. <br /> Nitrate Sources <br /> Septic systems and dairies have been identified to be the most significant sources of nitrate impact to <br /> groundwater. Orchard fertilization in sandy soils is also a significant source of nitrate contamination <br /> in shallow or sandy aquifers in San Joaquin County. <br /> Rainfall Contribution <br /> An estimate for rainfall quantity and quality was required for this nitrate loading analysis. The H&F <br /> method utilizes the"average recharge rate of rainfall"for calculating potential nitrate impacts to the <br /> aquifer. Some portion of total rainfall will dissipate by evapotranspiration,the sum of evaporation <br /> and plant transpiration, hence reducing the amount of rainfall percolation into the aquifer and <br /> percolating effluent, especially in summer months. <br /> Rainfall recharge (deep percolation of rain) is a significant factor in the nitrate loading estimate; <br /> however,data on rainfall recharge rates is not widely available. For H&F's study conducted in the <br /> Chico area,a recharge rate was calculated to be 75 percent of the average rainfall. Since the Chico <br /> area is similar geologically to San Joaquin County region, an estimated recharge rainfall was <br /> calculated for this study based upon 75 percent of annual rainfall for the project area. <br /> Rainfall data for the Lodi area was obtained from the San Joaquin County Flood Control and Water <br /> Conservation District Groundwater Report from Fall 2016. The Stockton Fire Station,the closest <br /> reported station to the site, reports the average total annual rainfall from 1941 through 2015 to be <br /> 15.6 inches. Assuming 75 percent of this rainwater percolates to the aquifer,a value of 11.7 inches <br /> of average recharge of rainfall is calculated.H&F estimates that the nitrate concentration of rainfall <br /> is approximately 1 mg/L-N. <br /> Quantity and Quality of Domestic Wastewater <br /> The IHO nursery operates five days per week.A maximum of 50 employees per day is anticipated. <br /> The proposed nursery improvements will include the addition of two new ADA restrooms,to contain <br /> two toilets and two lavatories. Additionally,the existing nursery facility is estimated to contain three <br /> restrooms, with a total of three toilets, one urinal,and four lavatories. <br /> The estimated sewage flow rates for various uses are available from several references. The uses <br /> presented below were guided by the San Joaquin County On-Site Wastewater Treatment Systems <br /> Standards(2017)and US EPA(1980). A use of 15 gallons per day for each employee is typical for <br /> an agricultural worker; this rate was used for the nurdery employees. The estimated flow values <br /> discussed here should not be used for the design and sizing of the septic system. The design and <br /> BAEZ GEOTECHNICAL GROUP Soil Suitability Study and Nitrate Loading Study-I Nsin Orchids Page 6 <br />