Laserfiche WebLink
Phase D ESA —Work Plan <br /> 2222&2244 S.Airport Way, <br /> Stockton,California <br /> October 27,2017 <br /> Page 5 <br /> 8.0 PROJECT SCHEDULE <br /> Condor has tentatively scheduled drilling at the Site for November 9and 10,2017. Well development and <br /> sampling will be coordinated as soon as possible thereafter. Laboratory results are expected with two <br /> weeks of conducting the sampling. A report can be submitted to the Client within four weeks of the <br /> completion of the fieldwork. If you need additional information or have any questions, please call John <br /> Lane at(209)234-0518 or email jlanencondorearth.com. <br /> yS�pN p GF <br /> Respectfully submitted, �ON <br /> CONDOR EARTH a <br /> * �Na 679b <br /> OF <br /> Lucy Mulvey John P.Lane,PG#6795 <br /> Staff Geologist Senior Geologist <br /> X:\Project\7000_pd\7595 STAND-Airport way\7595A Phase II ESA\Reports\Work Order\FR Work Plan.doc <br /> A <br /> i1� CONDOR <br />