Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer 0 Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum 0 Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:Precision mechanical test gauge Equipment Resolution:0.10° <br /> Piping Run#Diesel Piping Run#91 Piping Run#87 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3.50" 3.50" 3.50" <br /> Length of Piping Run: 130' 130' 130' <br /> Product Stored: Diesel Gasoline Gasoline <br /> Method and location of <br /> Boot in sump Boot in sump Boot in sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes <br /> starting test: <br /> Test Start Time: 11:30am 11:30am 11:30am <br /> Initial Reading(RI): 5.00" 5.00" 5.00" <br /> Test End Time: 12:30pm 12:30pm 12:30pm <br /> Final Reading(RF): 5.00" 5.00" 5.00" <br /> Test Duration: 60 minutes 60 minutes 60 minutes <br /> Change in Reading(RF-RI): 0.00" 0.00" 0.00" <br /> Pass/Fail Threshold or 0.00" 0.00" 0.00" <br /> Criteria: <br /> Test Result: 0 Pass ❑Fail 0 Pass ❑Fail 0 Pass ❑Fail ❑ Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />