My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6230
>
2300 - Underground Storage Tank Program
>
PR0231225
>
REMOVAL_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2021 9:44:53 AM
Creation date
10/26/2020 1:18:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2020
RECORD_ID
PR0231225
PE
2361
FACILITY_ID
FA0003624
FACILITY_NAME
CANEPAS CAR WASH
STREET_NUMBER
6230
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
08136003
CURRENT_STATUS
02
SITE_LOCATION
6230 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Health Depart <br /> SAN Q A Q U Nment <br /> COU NTY - <br /> I <br /> I <br /> BACKFILL EXCAVATION CERTIFICATE <br /> Project Location: 3 d /9G/irlc!� 5r'Zo 7- <br /> owner C ����� iZ 4//�S/� Phone No:dO <br /> Contractor: ..?/01 l Al e, Phone No: ,?,O <br /> License No: 5 9 9 <br /> EaD <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE JUL 2 9 2070 <br /> 1. Submission of Soil Engineer's Compaction Report within 30 day8yN SAL HEALTH <br /> completion, or i isERviccs <br /> i <br /> 2. Submission of verification, e.g., load ticket, within 30 days of project completion <br /> that one of the following materials was placed in the excavation in 12 lifts: <br /> oy,A. Pea gravel--smooth, rounded material not more than one-half(1/2) <br /> inch in diameter <br /> B. Crushed rock--self-compacting material not more than three- <br /> quarters (3/4) inch in cross sectional measurement. (Use of <br /> crushed rock will not be permitted for backfill if contact will be made <br /> between the backfill material and tanks/pipes made of poly resin <br /> glass or similar materials.) <br /> i <br /> DECLARATION <br /> fi <br /> 3 <br /> 1 hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 <br /> days of project completion, or submission of verification that the select material <br /> described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure <br /> compliance with the Uniform Building Code Appendix Chapter 70. <br /> 3 <br /> *Name <br /> nn <br /> Title <br /> nn <br /> QL <br /> i <br /> Signature <br /> { <br /> I <br /> *Shall be the responsible managing employee on the license or authorized agent. <br /> r <br /> 0 <br /> 0 1= /p <br />
The URL can be used to link to this page
Your browser does not support the video tag.