Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : 5/22/2020 <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> UST Monitoring Site Plan <br /> Sitepddress: SYNERGY CENTRAL GAS 642 N HUNTER ST <br /> CAR <br /> G NVASH <br /> .3 = 5. — 7. = 9_ _ . . . . . . . . . . . . _ . <br /> 2. 4 = .t _ 12 = <br /> N AP KEY; <br /> A.ANNULAR SENEJ 87-2 ( 1 L <br /> F=FILL A F V x �J <br /> P=PROBE 11 S x <br /> V=VAPOR ( P J ( F J <br /> ST=SLAVE TURBINE <br /> L=1EAK DETECTOR' TURBL\-E <br /> l=SENSOR <br /> L <br /> 87 i Soo i <br /> *PfPI\G * x <br /> (ARROWS) p <br /> Draitine of <br /> pipinzw exit of <br /> sump and UDC' :. <br /> No underpound - - - - - L <br /> dratring is <br /> accurate; tt2 . <br /> 't' <br /> cannot Speculate <br /> prittz. <br /> Any hems undergroind that are not risible to the certif}ine technician are a <br /> professional opinion only =dare solely for informational purposes. Dra ng not to <br /> scale. <br /> Date map was drawn: 101SU114 <br /> Instructions <br /> If you already have a diagram that shows all required mformaEcn, you may incude it, rather than Ws page, nigh your Monitoring System Certifnafcn. On ycursita plsn, <br /> shmv the general layout of tanks and piping. C]earty identify 'locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanics] or electronic line leak dste:tors; and in-tank liquid levet <br /> pfabes Cif used for leak detection). In the space provided, note he date this Site Plan was preparecI. <br /> LEGEND <br />