Laserfiche WebLink
LOGE 20-52: Jaimes Percolation Test Page 3 <br /> October 27, 2020 <br /> the dispersal system to ground water. Ground water is anticipated to be encountered <br /> approximately 85 feet below ground surface at the Site; consequently, no modifications to <br /> standard septic systems should be required. <br /> Discussion of Septic System Sizing <br /> Septic system construction utilizing leach lines and seepage pits should follow the San Joaquin <br /> County On-Site Wastewater Treatment Systems Standards (2017) where applicable. The new <br /> septic system will require a permit from the San Joaquin County Environmental Health <br /> Department. <br /> We are pleased to be of service on this project. Please feel free to contact us should you have <br /> any questions. <br /> Sincerely, <br /> Live Oak GeoEnvironmental, Inc. <br /> /Project <br /> \QI,;AL�Abigail R cco, Manager �FSS GFGv� <br /> 2 DAVID J.WELCH u <br /> N0.2151 <br /> CERTIFIED <br /> ENGINEERING <br /> GIST <br /> David Welch, Engineering Geologist GEOLO <br /> s�TFpFCAIIST \P <br /> CEG-2151, CHG-653, PGP-1049 <br /> Attachments: Plate 1: Vicinity Map <br /> Plate 2: Site Map <br /> Percolation Test Permit <br /> Percolation Test Form <br /> CC: Michael Kith, REHS, Program Coordinator <br /> San Joaquin County Environmental Health Department <br /> 1868 E. Hazelton Ave. <br /> Stockton, CA 95205 <br />