My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAROLYN WESTON
>
0
>
2300 - Underground Storage Tank Program
>
PR0546181
>
INSTALL_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 9:15:47 AM
Creation date
10/30/2020 4:28:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2021
RECORD_ID
PR0546181
PE
2351
FACILITY_ID
FA0026131
FACILITY_NAME
7-ELEVEN INC. #38616
STREET_NUMBER
601
Direction
W
STREET_NAME
CAROLYN WESTON
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16422019
CURRENT_STATUS
01
SITE_LOCATION
601 W CAROLYN WESTON BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J O A Q U I N Environmental Health Department <br /> I_ ! �' `i Time In : <br /> Time Out: <br /> Underground Storage Tank Program Service Request Inspection Report <br /> Name of Facility : 7- ELEVEN INC #38616 Date : 06/09/2021 <br /> Address : 601 W CAROLYN WESTON BLVD , STOCKTON 95206 <br /> Requestor: ROBERT FORLOINE , PM DESIGN GROUP INC Telephone : (707) 387-9883 <br /> Program Element: 2303 - UST/PIPING INSTALLATION Request #: SR0082546 <br /> Inspection Type : 131 - UST INSTALLATION INSPECTION <br /> Onsite Service Technician : Tom Sanford ICC Service Tech/Installer Exp , Date : 09/25/2022 <br /> Manufacturer training : Xerxes , 01 /22/22 <br /> OVERALL INSPECTION NOTES AND COMMENTS <br /> NOTES <br /> On-site to witness the installation of the following underground storage tanks : <br /> - 1 Xerxes 20 , 000 gallon tank <br /> - 1 Xerxes 12 , 000 gallon primary tank <br /> - 1 Xerxes 8 , 000 gallon end tank <br /> While on-site the following items were verified : <br /> - Manufacturer and capacity of tanks are consistent with permit plans <br /> - Tanks had UL labels <br /> - No brine leaks were observed outside the tanks <br /> - Per ICC installer Tom Sanford , no brine leaks were observed inside the tanks <br /> - The tank installation checklist was on site and completed during the installation <br /> - Anchorage and the use of deadmen <br /> - Application of additional corrosion protection to all exposed metal <br /> - Appropriate backfill <br /> - Compaction/probing of backfill <br /> - Tank orientation matches approved plans <br /> This site requires additional testing . Refer to the permit approval letter for the required inspections and provide a 48-hour <br /> notice by emailing ust@sjgov . org . <br /> Provide additional documentation from the tank manufacturer regarding the acceptable testing procedures for ballasted tank <br /> installations . <br /> To minimize person to person contact EHD is choosing to write the name of person receiving the report instead of having them <br /> sign . <br /> The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br /> Safety Code. If a reinspection is required , fees will be assessed at the current hourly rate . <br /> Received by : Name and Title : Emailed to Crystal Justice , Construct <br /> EH Specialist : VICKY VANG- LEE Phone : (209) 616-3028 <br /> SR0082546 SC131 06/09/2021 <br /> EHD 23-01 Rev. 09/16/2020 Page 1 of 1 Underground Storage Tank Program Service Request Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.