My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAROLYN WESTON
>
0
>
2300 - Underground Storage Tank Program
>
PR0546181
>
INSTALL_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 9:15:47 AM
Creation date
10/30/2020 4:28:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2021
RECORD_ID
PR0546181
PE
2351
FACILITY_ID
FA0026131
FACILITY_NAME
7-ELEVEN INC. #38616
STREET_NUMBER
601
Direction
W
STREET_NAME
CAROLYN WESTON
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16422019
CURRENT_STATUS
01
SITE_LOCATION
601 W CAROLYN WESTON BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
xgq,,GCG RS <br /> SOLUTIONS DELIVERED <br /> iota <br /> ENHANCED LEAK DETECTION <br /> August 20,2020 <br /> Subject: Work Plan for IOTA v0051 and iotaVision"'Pre and Final ELD Testing Services <br /> To Whom It May Concern: <br /> CGRS is pleased to present you with this work plan for pre and final enhanced leak detection (ELD)testing services for your <br /> project at the above referenced location. CGRS will utilize the iota VaporTite V005 and iotaVision'" L005 (LG 113) to <br /> perform the final ELD post installation test as required by the State of California. These test methods have been evaluated <br /> by the California State Water Resource Control Board and determined to meet the performance requirements for post <br /> installation ELD testing(see LG 162-3 attached). <br /> O Pre Testing will be performed on the primary containment portion of the fueling system with the IOTA test method <br /> while the tank top and product,vent and vapor piping is exposed, prior to backfilling. Any problems encountered <br /> during the pre-testing will be addressed by the installation contractor and retested by CGRS the testing crew. <br /> O Final ELD testing will be performed on all primary fuel containment system components once the fueling system <br /> has been completed (everything below grade surface) backfilled, concrete poured, and the system is essentially <br /> ready to receive fuel.This will provide the installation contractor, general contractor, design engineer, site owner <br /> and operator with third party certification that the system is"vapor tight"before it ever receives fuel. <br /> O Final testing with iotaVisionl" will be performed on all brine filled underground storage tanks and their <br /> compartments thus ensuring that brine is not observed in the primary containment. <br /> CGRS holds a current California Contractors License with a Hazardous Materials endorsement. All final ELD testing will be <br /> performed by a certified IOTA technician holding a current California Tank Tester license. <br /> If you have any questions regarding any aspect of this work plan,please don't hesitate to contact me at 1-800-288-2657. <br /> Sincerely, <br /> Chris Murphy <br /> Director of CA Operations <br /> CGRS, Inc. <br /> www.cgrs.com 1301 Academy Ct <br /> 800.288.2657 1 Fort Collins,CO 8052 <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.