My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAROLYN WESTON
>
0
>
2300 - Underground Storage Tank Program
>
PR0546181
>
INSTALL_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 9:15:47 AM
Creation date
10/30/2020 4:28:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2021
RECORD_ID
PR0546181
PE
2351
FACILITY_ID
FA0026131
FACILITY_NAME
7-ELEVEN INC. #38616
STREET_NUMBER
601
Direction
W
STREET_NAME
CAROLYN WESTON
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16422019
CURRENT_STATUS
01
SITE_LOCATION
601 W CAROLYN WESTON BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTICE OF COMPLETION UL <br /> AND <br /> AUTHORIZATION TO APPLY THE UL MARK <br /> April 28, 2020 <br /> Mr. Kris Kane <br /> OPW FUELING CONTAINMENT SYSTEMS INC. RECEIVED <br /> 3250 U S RTE 70 BUSINESS W <br /> SMITHFIELD, NC 27577 <br /> Our Reference: File MH60659, Vol. 1 Order: 13027852 SEP 0 2 2020 <br /> Project 4789162763 LN�'IIZUNI�II N"IAL IIEAL(1l <br /> I)FP= RT�iCNT <br /> Project Scope: DSLFR-DW Secondary Containment FRP Dispenser Sumps; FDS 4021-6 an <br /> FDS 4319-DW Secondary Containment FRP Dispenser Sumps with Larger <br /> Interstitial Gap; and REF-40XXDC Sump Fittings <br /> Dear Mr. Kane: <br /> Congratulations! UL's investigation of your products has been completed under the above Reference <br /> Number and the products were determined to comply with the applicable requirements. This letter <br /> temporarily supplements the UL Follow-Up Services Procedure and serves as authorization to apply the <br /> UL Mark at authorized factories under UL's Follow-Up Service Program. To provide your manufacturer(s) <br /> with the intended authorization to use the UL Mark, you must send a copy of this notice to each <br /> manufacturing location currently authorized under File MH60659, Vol. 1. <br /> Records in the Follow-Up Services Procedure covering the product are now being prepared and will be <br /> sent in the near future. Until then, this letter authorizes application of the UL Mark for 90 days from the <br /> date indicated above. <br /> Additional requirements related to your responsibilities as the Applicant can be found in the document <br /> "Applicant responsibilities related to Early Authorizations"that can be found at the following web-site: <br /> http://www.ul.com/EAResponsibilities <br /> Any information and documentation provided to you involving UL Mark services are provided on behalf of <br /> UL LLC (UL) or any authorized licensee of UL. <br /> We are excited you are now able to apply the UL Mark to your products and appreciate your business. <br /> Feel free to contact me or any of our Customer Service representatives if you have any questions. <br /> Very truly yours, Reviewed by: <br /> Tim Crews Bruce A. Mahrenholz <br /> Staff Engineer CPO Director <br /> Timothy.A.Crews@ul.com Bruce.A.Mahrenholz@ul.com <br /> 33dbe4a9-a830-4b75-bd26-7741488602b9 <br /> I <br /> it <br /> This is an electronically generated letter.Signatures are not required for this document to be valid. Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.