Laserfiche WebLink
OPW 7150 Overfill Materials Important <br /> Prevention Valves • In order to prevent product <br /> Valve Body: Cast aluminum spillage from the Underground <br /> The CARB-certified OPW 71 SOstorage Tank(UST),properly <br /> Float: Nitrile rubber,closed cell foam maintained delivery equipment <br /> vapor-tight Overfill Prevention Valve and a proper connection at the <br /> is designed to prevent the overfill of Valve:Aluminum ` tight-fill adaptor are essential. <br /> underground storage tanks by providing Seals:Viton® I Delivery personnel should <br /> be managed and trained <br /> a positive shut-off of product delivery. Upper & lower Drop Tube:Aluminum ij to inspect delivery elbows <br /> The shut-off valve is an integral part of Plastic parts:Acetal and hoses for damaged and <br /> the drop tube used for gravity filling. p_ missing parts.They should <br /> Hardware: Stainless steel �qRe always make certain there <br /> The OPW 71 SO allows easy installation e. is a positive connection <br /> Features <br /> (without breaking concrete) and requires IERP1F/Rpk between the adaptor and <br /> no special manholes. elbow.If delivery equipment <br /> Simple, Easy and Quick is not properly maintained, <br /> The OPW 71 SO is a vapor-tight two- Installation —no excavation or or the elbow is not securely <br /> special manholes required. coupled pthe adaptor,a <br /> stage shut-off valve.When the liquid s <br /> P q serious spill may result when <br /> level rises to about 95%of tank ♦ Economical —costs a fraction the OPW 71SO closes,causing <br /> capacity,the valve mechanism is a hazard and environmental <br /> released,closing automatically with of expensive,complicated and contamination. <br /> the flow.This reduces the flow rate to difficult-to-install valves. <br /> approximately 5 gpm through a bypass ♦ Furnished Complete—supplied NOTE:The OPW 71 SO is <br /> valve.The operator may then stop the with new upper and lower drop tubes, designed for use on tight-fill <br /> gravity drop applications only. <br /> filling process and disconnect and drain mounting hardware and thorough Do not use for pressure <br /> the delivery hose.As long as the liquid instructions for quick job site time. fill applications. <br /> exceeds the 95% level,the valve will ♦ Completely Automatic Operation <br /> close automatically each time delivery —no prechecks to perform, no resets ♦ Retrofits Directly—for both new <br /> is attempted. and no overrides to be broken <br /> and existing tanks with 4' fill risers. <br /> If the delivery is not stopped and the or abused. <br /> liquid rises to about 98% of tank ♦ No Pressurization of the Tank— Quick Drain Feature— <br /> capacity,the bypass valve closes operates directly from liquid level, automatically drains hose when head <br /> completely. No additional liquid can flow pressure is relieved. <br /> --0, Will Accept a Dipstick <br /> into the tank until the level drops below <br /> a reset point. for Gauging <br /> NOTE:The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention <br /> desired tank capacity. Please contact the Compared to Overfill Warning Systems: <br /> Authority Having Jurisdiction (AHJ) and ♦ Completely Automatic faster fill times and reducing <br /> review local,state,and national codes to Operation—does not rely on the spill risk. <br /> determine the regulatory requirements alertness ors speed of response of the <br /> governing shut-off capacity in your p Speeds Delivery Operations <br /> delivery attendant for certainty of —product flows unimpeded into <br /> region, as well as take into account overfillrevention. <br /> other considerations such as extreme p the tank until the hose "kick"that <br /> tank tilt. In all cases,the upper tube ♦ Keeps the Top of UST"Dry," accompanies the valve shut-off <br /> must protrude into the tank at least per EPA Requirements— provides a clear signal that the <br /> eliminatingpossible leaks at loose liquid has reached the shut-off level. <br /> e valve can shut <br /> p q <br /> 6 1/2" to ensure that the h <br /> off flow into the tank completely before bung fittings and the need for ♦ Simple and Inexpensive <br /> the top of the tank is wetted as per double containment on vent lines. Installation— In both two-point <br /> EPA requirements. ♦ Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow—allowing additional excavation, manholes or <br /> 71 SO Instruction Sheet Order vent piping are required. <br /> Number: H15524PA <br /> - Look for this label for <br /> Listings andO rtrasel EVIL authentic OPW EVR <br /> lalifornia Air Approved products. <br /> Certifications R sources Board oP.n.• OPW 7150 is EVR Approved for E85 <br /> t I r til til104 OPW <br />