PERFORMANCE SPECIFICATION - CONT.
<br /> SECTION II INSPECTIONS/TESTING-CONTINUED SECTION II INSPECTIONS/TESTING-CONTINUED SECTION III EARTHWORK-CONTINUED
<br /> x
<br /> PART 3-TANK INSTALLATION INSPECTION PART 5-STARTUP INSPECTION-CONTINUED PART 3-EXECUTION s
<br /> 3.tBE RESPONSIBLE FDR ADJUSTING SCHEDULE SO TANKS ARE TESTED AND SET IN TANK 5.5.4 ALLBRASSGDDDSAGFITTIGSPROPERL TNS LLED,TIGHTANDSECURE. 3.t DTECnoNS.PROVIDEADEOUATE SHORING,SPACING,PILING AND CRIBBING.COMPLY HATH ALL DS145 AND LOCAL
<br /> HOLE SAME DAV OF DELNERT. REGUUTION8 AS IT PERTAINS TO SAFETY.
<br /> 5,55 LEAK DETECTORS INSTALLED.
<br /> 3.2
<br /> PRIOR To TANK DELIVERYTIONS SHALL BE COMPLETED WITH BEDDING MATERIAL IN PLACE FORINSTALLATIIXJ 5.5.3 PROTECTED FLET(CONNECTORS ARE PROPERTY INSTALLED WITHOUT TMST IN INSTALUTION. 3.2 LAYOUTTCONTRACTOR SHALL BE ION'.EM-TTE TO LINER,ELEVATDNS AND LIMITS REQUIREDPONSIBLE FOR LAYOUT AS ENTED IN PERMITTED BY THE DRAWINGS,PLUSNS AND UFFlaENT B-CE5.
<br /> 3.3 ANCHORIN.CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETEIGTALunory OF CONCRELEAN.HORS I-NAM. 55.2 REQUIRED,REGARDLESS OF TYPE,corvpmON OR
<br /> PROPERLYARTAND SEALED TO TANK MAN WAY OR FITTINGS AND CLEANED CUT
<br /> FFREE OF DERIS ASND MOISTURE CONTENT OF THEA MATERIAL ENCOUNTERED.HALL EXCESS MATERIAL OFF THE SITE AND DISPOSE OF SAME
<br /> 3. BE INSTALLED AS PER MANUFACTURER'S SPECIFlCAT DNS-MINIMUM OF 4-MORE IF CONCRETE. MENSK"OF
<br /> EEGUIFEO BV MADNUFACTUURER(STRIPSSHALL BE SHIPPED WITH APPROPRIATE PaoaNG MATERIAL REouiREMENTB ARE GREATER.IF EzCCAVATou ulnieRwIF'.FL nu E-TINNCUGn 71TRFAcIUI ALL
<br /> 3 558 TANKS LAN AND FREE OF WATER.PRIOR TO PRODUCT FILL TANKS ARE TO BE CHECKED FOR ANY MATERIALS MUST BE TESTED PRIOR TO REMOVAL. Fnb 11 iB
<br /> RESPONSIBLE
<br /> FOR
<br /> ALL MATERIALS
<br /> PROVIDE
<br /> AIR EST INCLUDING
<br /> NOT
<br /> !MITE. BOTH TANKS PRETO BE CLFANEDAG WATER REMOVED 3. WCUTNG:IF PAVIN MUSTBE REMOVED,THE PERIMETER OF THE TANK EXCAVATION AND ALL TRENCHES SHALL BE
<br /> TO,NR COMPRESSOR OF SUFFICIENF SIZE AND CAPACITY.SPECIFED UAP MATERIAL AND ACCEPTABLE SOAP 5.5.9 ISLAND FORM INNER BOXES PROPERLY CLEANED OUT FREE OF DEBRIS AND CONCRETE EDGES OF EXCAVATIONS IN ALL DIRECTIONS IN ORDER
<br /> APPLICATION OUIPMENT. TO GIVE PROPER SUPPORTCONCRETE
<br /> ONNEW SUB TO AVOID SETTLING
<br /> ET LI GONG
<br /> 5.5.10 DISPENSERS PROPERLY SET AND SECURED TO ISLAND BOX FRAME AND DISPENSER SUMPS PROPERLY
<br /> 3.6 INTERSFICE.S0RBERVEE THE VACUUM oLD ESST FOR HT LLEEAST ONEH1)HOUR PR'ORTTO_'NCTIFTANK.asoo LD THE CLEANED OUT FREE OF DEBRIS arvO CONCRETE 3. COUNTER D,LO GL CDNSTRUUTON OFFICE SITE MANAGER SHALL BE IMMEDITELOTTWNhCTED FOR APEPROVAL TO
<br /> INTERSTICE NOT HOLD A MINIMUM 4 HG VACUUM,THEN CONTACT THE TANK MANUFACTURER IMMEDIATELY. 5.5.11 SHEAR VALVES SECURED O FRAME WUFH PROPER HARDWARE PROCEED
<br /> 3. RVATIDN:]-ELEVEN'S CDNSTRUCTION DEPARTMENT ANDIOF REPRESENTATIVE SHALL BE RESPONSIBLE FDR 5512 PHASE II VAPOR RECOVERY LINES STIIBBED UP AND SECURED Iry PROPER LOCATION, 3. PROTECTION CONFRACTOR SHALL PROVIDE SUFFICIENT PROTECTION WITH EARTHEN AT ALL TIMES TD PROTECT
<br /> INSPECTION OF AIR OR VACUUM TEST,OBSERVATION OF LIFTING,eEFTIrvG AND BURIAL OF TANKS. PRLT MARKED, Tex z
<br /> IXTEDANDGAAERIICTARDEED FOR SAFETY�UNTIL) BEACK FiLRLis COMPLETE ANO SURFHCING FINI3HED.RO OF dim O
<br /> 3.8 TANK INSPECTION REPORT:WRITTEN REPORTSHALL INCLUDE PHOTOGRAPHICWCUMENTATION OFALL PROCEDURES. 5513 REGuIREME M FOR.01LACTEOEcaouNO ALL CONNECTIONS
<br /> io'UNC_N 9olE(TG6INCRIFY COMPLIANCE WITH PROTECTED AND a r
<br /> 3 ORING:WNTRaCTOR SHALL BE RESPONSTIONS ARRANTDETERMININGSHORT G.REFERENCE FOR SHORING AND PROVIDING Z i ���
<br /> RE-ED WITH NORINGT SLID LDSTEANLSD SOIL CONDITIONS WARRANT SHORING.REFERENCE SOIL REPORT FOR CONDITIONS
<br /> PART 4-TANK AND LINE TESTING DIBPENBERDNQPIEBINBTALLRAGLIRN E TNG3LBDPMDRDrvLR�FREQ RED BY Go INSERTED.
<br /> WARRAry IGSECIALREQUIREMENTS.
<br /> FMIALLIUNI AND ¢ w
<br /> A4J1ND FINAL SYSTEM TESTRACHOR T COMPLETE ANDBE RESPONSIBLE FOR TILE FOLLOWING PRIOR TO FlNAL PLACEMEN OF WNCRETE 55,6 AUTENSPECTIONS BINSPECTION
<br /> CAPE GOVERNING PURPOSES.
<br /> COMPLETED SIGNED.SIGNED COMPLETED 3 TO TA NK PUCEMENTECIFlCATIONB.PROVIDER IY BOOFaPPRWED BACK FIDLAL OVERPOTTOMKOFIXCAVATION PRIOR >O Waa N
<br /> .. K FILL SHALL BE PLACEDANDCDMPACTED IN MAXIMUM 12"LIFTS. W
<br /> 4.1.1 LPROTECTION PERMITCARCONSITE,OV BAC J W U (7
<br /> OVERFILLPROTECTIDN eHALLBEINSTALL OUPOry COMPLERON of EST FIL 5511 L DEVICES INCLUDING LIGHTS SIGNS AND INTERCOMS PROPERLY INSTALLED SECURED AND 3.9 CLEANUP.CLEAN UP ALL DEBRIS CAUSED BY WORK OF THIS SECTION,KEEPING PREMIER CLEAN AND NEAT AT ALL TIMES. w R Z
<br /> 4.1.2 T LINESSHALL BE COMPLETED UNDERGROUND AND STUBBED UP MINIMUM OFI2'ABOVE PLUMB. W
<br /> FINISHED GRADE. ANTWIRING INSPECTION PORTSINCaGP LUMNSCOVEREDWITI CEPTABLE PUTEG r Torn 1
<br /> 4.1.3 INSTAL oI-1-ALL PRODUCT UE55.
<br /> ,8,8 VENT DES PROPERLY SECURED,PROTECTED AND INSTALLED AT PROPER HEIGHT. SECTION IV TANK INSTALLATION �
<br /> 4.1.4 PUMPS.SUBMERSIBLAT E PUMPPS AND LINES SHALL BE COMPLEFELYIINSTALL LEAR DEFECTOR IN PLACE.
<br /> 55.20 VERIFICATION OF COMPLIANCE FOR TANK AND UG ESTAvawBLE ON SITE.
<br /> 4.16 SITEPREP TION CONTRACTOR SHALL PREPARE TANK AREA FOR WATER OR PRODUCT DELIVERY AND 552, ALL MANHOLES REE OFCONCREEAND DEBRIS. PART 1 -GENERAL
<br /> TANKTESTGPRQDEDURE3. 5.522 MANHOLE COVERS PROPERTY PAINTED. SACUIPMENTAND RELAED
<br /> 4.1.2 FILL:CONTRACTOR SHALL PROVIDE 42'MINIMUM BACK FILL OVER TANKS. 5.5.23 ALL PAINTING COMPLETE INCLUDING CANOPY, METALS AND MISCELLANEOUS METALS. APNKIANCEs REQUIRED IN coNJUNDHoNIWTH OR PROPERLLY INCIDENTAL T'O THEIINDTALUTIDN OF FUEL STORAGE
<br /> 4.1.3 WATER.SHOULD WATER
<br /> BE PRESENT IN TANK HOLE,CONTRACTOR SHALL VERIFY AND NOTIFY 55.24 WNCRETE AT ISLANDS AND TANK PAD TRUE,PROPERLY SLOPED AND FINISHED WITH ACCEPTABLE RISE A 3.
<br /> MRSTRWTIN MANAGER OF STATUS. TDMANHOLES a s
<br /> 4.2 AF RLACEMENTOFCONCREIE.ACGMPLEESYSTEM TIGHTNESS TEST INCLUDING TANKS,PRODUCT LINES,STAGE 11 PART 2-PRODUCTS
<br /> CTRICAL PANELS PROPERLY CDMPLEFED TO INCLUDE. TANKS SHALL BE DESIGNED AND REQUIREMENTS.
<br /> SHALL BEASAPPROVEDBVETWELEVVEEN£"EVENALLLL 9E 6ILLF RECTLV FOR E6IS COONTFRACMoR 1�CTOkgNATEe 55.25 QE BREAKER FOR BUBM 21 APPROVED TANKS SHALL BESC HEDUL' NDFaCT0RED 3Q AS TO BE WRRD9IQN PROTECTED PER Ra
<br /> (AI ERSIBLE PUMP,D18PEN3ERCONSOLEA-UGING,D18PENSERLIGHTS
<br /> THIRDPARITESTIRETESTNGRaeQUIREMEu.L,.TEDo THE TESTING COMPANY TO BE BIueS To CONTRACTOR.DERAILS FOR BALL)AND CANOPY LIGHTS ALL). DOUBLE WALL FIBERGwBS TANKS
<br /> 4z1 IBI GAS PANEL CONTROLLED BY A MIN BREAKER, 2 PS.SHALL BE 8UPPUED BY TANK MANUFACTURER Ory
<br /> ABA�LALL SFIALLING ANDRCONCRETEPPOURINO,ACONTN.GL SWIVORosTATIc TEST
<br /> BE PERFORMED ON (c) CONTROL BOXES AND DISTRIBunory BOXES INSTALLED AND4NREn 2 HOLD STRA
<br /> 4.3 PRODUCT DELI ERY.WNPRACTORSHAS&SPILL LLBE RESPONSIBLE FOR NOTIFOATONTOETS TO ENSURE TIGHTNESS AND miIELEVENREPRESENTATIVEOFTEST IDI INTERCOM INSTAL-ON COMPLETE AND PROPERLY WORKING. PART 3 EINSTALLATION yyj o
<br /> DATEERanoNHLRIFOR TESTING PRROCEDURES A MINIMUM FILLED
<br /> HOURS PRODUCT
<br /> NOT9CATOIOIN ANLL BE REQUIRED FOR LEI ALL APPLICABE CONsoB wsTALunON COMPLETE AND FurvcnoNAL 3.1 REFER TO TANK MANUFACTURERS CRITERIA AND SPECIFICATIONS FOR TANK INSTALLATION AND � �
<br /> PRODUCT DELIVERY.CHECK WITH LOCAL REGULATORY AGENCIES FOR ANY FURTHER REQUIREMENTS. (F) ALL WIRING PROPERLY IDENTIFIED-COLOR CODED AIRING. ADHERE TO AS REQUIRED.o
<br /> 4. TATNES ON SITE TO ACCEPT AND RECORD ALL PRODUCT DELNERIEe�STALLEDAG (G) CONDUITS PROPERLY IOENTIFIO.IHf ALLBRFAKERS IN'OFF'POSITION. 3 CLEARMANUFANCES MINIMUM CLEARANCE FOR TANKS SHALL BEAR FOLLOWS. LD REQUIREMENTS OF TANK
<br /> NTRACToRTG ALLOW PROCEDURES FOR DREPRESENTATIVSTUR
<br /> EESHALL'E"ND1ER1 AS ATIONSYICTWA R HAT G OVERFlLL PROTECTION IS IN 5 FlGTION'CONTWICTOR SHALL VERIFY ITEMSPS INDIGTEDABOVE PRIOR TD eCHEDULING OF STARTUP R OR SEL CONDITIONS DICTATE GREATER CLFARANCEADHERE SHOULD CCORDINGLT.
<br /> .-SANaOR TIME LOSTAT STARTUP DUFTO NON-WMPLwNce sHAU BE C.R. To CONTRAcioR UP 3.2.1 AND Bono AD MINIMUM OF 1z'BEDDING MATERIAL BETWEEN GOTTOM OF ExCA Ta OR PAD
<br /> 4.5 FsT cc NMP° LANYREMAININGPRODUCTINVENTLIrvEBOPQNGQMPLETIDNQFTEBTSHALLBEREMD EDGY ACQDRBIGLY. ANDEL W
<br /> 5.7 EQUIPMENTSHALL BE TESTED PER SPECIFICATIONS ON SHEET G17.0. 3.2.2 SIDES'.FIR DEMINIMUM OF-BEIWEENTANKSAND3'FROM SIBE£NCOFTANKTOWALLOF
<br /> 5.3 CLEANUP:CLEAN UP ALL DEBRIS CAUSED BY WORK OF THIS SECTION,KEEPING PREMISES CLEAN AND N-T 323 EXCAVATION. 'OF CONCRETE O
<br /> PART 5-STARTUP INSPECTION ALLnmEB. DP:AT NOFUDE ANKS HILL MATERIAL TESTING
<br /> MANK PLUS UFACTURER
<br /> v
<br /> 3.3 EsnG.PRIOR TO INSTaLwnoN of TANKS Esnmc ER MANUFacTURER's wsiaucnoms sHau BE PERFORMED ON
<br /> 51 DULING CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL SCHEDULING STARTUP AND CHECKOUT CONTRACTOR ANK(S).ON DUAL WALL TANKS,CONSULT TANK MANUFACTURER FOR TESTING CRITERIA. C,
<br /> BGHE SECTION III EARTHWORK ❑ (D9 Y
<br /> 4HALL NoTPRIOR TO NTOENNEDUCTOLSEP-A FARTUPAENDCHECKDUTDATEFNoTIMCNC DEPARTMENT OFFICE A MINIMUM OF 3.4 PLACEMENT O U U
<br /> 5. EANBITE PART 1 -GENERAL 3a, REFER TO SITE PLAN OR TANKP-ENTANDPRODUCTROTATION w z C
<br /> DURING ST
<br /> ARCOO gHS PPRROVED YU2�ELEVENE INCRALL STAR UP ARE TO BED ONE BY ANHADFHORIZED� 3A.2 OSErt GOF TANKS,REMOVE ALL FOREIGN DEBRIS,ROCKS,CLUBS,GARBAGE,ERC.FROM N N GO
<br /> MANUFACTURER'CONTRACTOR FOR THAT PIECE OF EQUIPMENT. 1.1 ICES EQUIPMENT AND APPLIANCES EXCAVATION.Iry ¢ �' a
<br /> APPROVED FILL.WNOTSEFONCONCRETEORWWO.
<br /> 1.1 RTDPPHT ALeTARTDP NDCHECK-0nDFY3TEmBAGEQ PMErvT3ILLB�GEaHra REnDN REQUIREDINWN NCnDNwTHDRPRDPERLYINaDErvTALO RT ARK. PwGETANKS ONLY QNAPPRG
<br /> SPECHC DIRECTIVE OFF-GLEVEOF NNREPLREESENTATIVE.DAMAGEOTO AM']£LEVE EQUIPMENT WE TO IMPROPER 3AA NOT USED. -F U) ❑ ❑ U
<br /> INSTALwnONAND,GRUNAUTEORBEDSTARTUPWILLBETERESPONSIBILITYOFTECONTRACTOR. PART 2-PRODUCTS oMRMMUMDEPTHASPERABOVEAGAeeHDwNON LIN' =_
<br /> s&ovs mvE
<br /> 5 2.1 FlLLMATERIAL:SHALL BE MATERIAL IN CDMPUANOE HATH TANK AND PIPING MANUFACTURER'S SPECIFICATIONS. REQUIRE GREETER BURIAL DEPTH IF INBTALLOIN REMOTE POSITION TO mA,P mSEm Y^o
<br /> NTLINES.VAPoRUNEB,SEWNDARYWrITIENTPRODUCT R`o -x=v
<br /> SHALL BE CONNECTED AND oPERanprvaL.ALL wNRcaPING,INCLUDING SPRINKLER sysTems,SHALL aECOELEIE. 2t, ROUNDEDAGGREGAE-A MIXOF PARTICLE8IZE a GEPTHAS REouAReD.IIF SUR1ALDFPTHIXCRDs5'a'(SV),GnFr T-ELEVEN va a`" �`v�
<br /> a
<br /> 9 s MPLIANCENTOTI ELEVEN
<br /> 88 DRAWINGS ANDSPOIOR TO SCFEMUNG OF RCATIONS FOR CONTURACTOR SE FOLLOWING,BUT THESE SHALL'T HALL OESEN, E. WT=
<br /> TITAN 1/e OR MORE
<br /> 3l4".LY MANAGER)TY yAm`5E A:`Qes�,E`E
<br /> THE TOTAL LIMIT OF THE CONTRACTORe VERIFlCATION. THING:SHALL BE WASHEG MATERIALYMTH ANGULAR PARTICLE SE NOT a� v9181_BEr�o�
<br /> s NTERANBTALLED AT OVER FlLLBRSUBMERBIBLES VAPOR 212 LESS
<br /> Tw.NGia OR MORE THAN 1"
<br /> 5.5.1 RECOVERY"
<br /> CAGING,OBSERVATION WELLS AND SUMWRISE. 2.1.3 BACKFILL OR OTHER MATERIAL MUST BE APPROVED BY TANK MANUFACTURER.
<br /> 5.5.2 PROPER HEIGHT OF GRAVEL BACK FILL AROUND SUMP/RISERS. NOTETERILSMUSTMEETASTMC83PARAGRAPHT.1FOR pUALITYANGROUNDNE..FILL MATERIAL
<br /> SHALL5.3 TANK I.D.MARKERS INSTALLED IN CONCRETE AT PROPER LOCATIONS. OF 9
<br /> 5 POUNDS PER CUBIC ROOF NOT ASSING Ape SIEVE DRY GRAVEL DENSITY MOST BEA MINIMUM
<br /> 5. �
<br /> M LSWK
<br /> Y 8411
<br /> 3
<br /> ?4L'M4MfVti�
<br /> Oti
<br /> gSHEET:
<br /> G14.0
<br /> FUELING-USA
<br />
|