My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAROLYN WESTON
>
0
>
2300 - Underground Storage Tank Program
>
PR0546181
>
INSTALL_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 9:15:47 AM
Creation date
10/30/2020 4:28:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2021
RECORD_ID
PR0546181
PE
2351
FACILITY_ID
FA0026131
FACILITY_NAME
7-ELEVEN INC. #38616
STREET_NUMBER
601
Direction
W
STREET_NAME
CAROLYN WESTON
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16422019
CURRENT_STATUS
01
SITE_LOCATION
601 W CAROLYN WESTON BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The San Joaquin County Environmental Health Department(EHD) has completed the review of the underground storage <br /> tank installation application for 7-Eleven#38616 located at NW corner of Carolyn Weston Blvd. & Manthey Rd, Stockton <br /> (SR0082546). Please provide the following additional information and address the following comments: <br /> 1. The Services Request needs to be signed by the billing party. <br /> 2. Page 3 of the Application for Underground Storage Tank Installation Permit: contractor information and Fire <br /> Permit information were not provided <br /> 3. Page 3 of the Application for Underground Storage Tank Installation Permit: responsible billing party information <br /> and signature were not provided <br /> 4. Page 6 of the Application for Underground Storage Tank: reported capacities for premium unleaded and diesel <br /> are inconsistent with plan drawings. Provide accurate tank capacity information on all documents. <br /> 5. Page 8 of the Application for Underground Storage Tank Installation Permit: tank interstitial space monitoring <br /> sensors& UDC sensors were not provided. <br /> 6. Section I (page 8) of the Application for Underground Storage Tank Installation Permit: all required boxes are not <br /> checked <br /> 7. Page G1.0 incorrectly states that the pipe with the longest run is diesel. Update to provide accurate <br /> information. <br /> 8. Key note#7 on page G4.1 indicate Xerxes 42" round sumps will be used. The drawings and cut sheets indicate <br /> Xerxes 42" DW eight sided sump. Update the plans to reflect the accurate information. <br /> 9. In the engineered plans (page G5.0), UDC piping discusses removing test ports and keeping ports open for <br /> drainage. Vacuum monitored piping in a VPH system should be sealed shut at all times. <br /> 10. The plans indicate ball valves will be placed on vacuum tubing at multiple locations. No additional shut off <br /> valves should be installed between the monitored interstitial spaces and their respective sensors. Remove all <br /> unnecessary ball valves from the plans. <br /> 11. Provide cut sheets for the following UST system components: Flex piping model#FFUL30X18MXM <br /> 12. Provide current contractor's training certifications for installation and testing of all proposed UST <br /> equipment/components. <br /> 13. Provide tank charts for the tanks being used. <br /> 14. Submit a work plan for enhanced leak detection (ELD)testing,to be conducted by a properly licensed individual. <br /> 15. Provide a drawing indicating the locations of all water wells, septic systems, and storm drains. <br /> 16. Provide separate buoyancy calculations for each tank properly signed and stamped by a professional engineer. <br /> 17. The buoyancy calculations were signed and stamped by a registered professional engineer with an expiration <br /> date prior to the date of the plan drawings. The plan drawings were dated 07/29/2020 and the expiration date <br /> of the registered professional engineer expired on 07/28/2020. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.