Laserfiche WebLink
California Integrated Waste Management Board <br /> Permit Decision No. 97-297 <br /> July 23 , 1997 <br /> WHEREAS, composting operations were originally permitted as <br /> an auxiliary operation to the California Waste Removal Systems <br /> Inc . , Large Volume Transfer Station (TS) & Material Recovery <br /> Facility (MRF) which was issued a Solid Waste Facility Permit on <br /> February 26 , 1992 ; and <br /> WHEREAS, the operator of the Califor_ia Waste Removal <br /> Systems Inc . , submitted to the Local Enforcement Agency (LEA) , <br /> San Joaquin County Public Health Services Environmental Health <br /> Division, an application for a SWFP revision that permits the TS <br /> & MRF separately from the composting facility; and <br /> WHEREAS, the LEA has submitted to the Board for its review <br /> and concurrence with or objection to the issuance of a revised <br /> SWFP for the California Waste Removal Systems Inc . ; and <br /> WHEREAS, the City of Lodi Community Development Department <br /> prepared an Environmental Impact Report (EIR) , State <br /> Clearinghouse (SCH) #90020924 , which includes an analysis of the <br /> TS and MRF; and <br /> WHEREAS, the City of Lodi approved the Final EIR and filed a <br /> Notice of Determination with the County Clerk on July 24 , 1991; <br /> and <br /> WHEREAS, in 1995 the City of Lodi adopted a Negative <br /> Declaration to annex approximately 10 acres into the City and to <br /> change the zoning to Industrial Use in order to accommodate an <br /> expansion of the existing transfer facility, and a Notice of <br /> Determination was filed with the County Clerk on March 17, 1995; <br /> and <br /> WHEREAS, Board staff have determined that the EIR is <br /> adequate for the Board' s evaluation of the proposed project for <br /> those project activities which are within this Agency' s expertise <br /> and/or powers, or which are required to be carried out or <br /> approved by the Board; and <br /> WHEREAS, the LEA and Board staff have evaluated the proposed <br /> permit and supporting documentation for consistency with <br /> standards adopted by the Board and have determined that the <br />