My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2004-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
3504
>
4400 - Solid Waste Program
>
PR0515730
>
CORRESPONDENCE_2004-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2024 3:16:47 PM
Creation date
11/9/2020 2:03:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2004-2005
RECORD_ID
PR0515730
PE
4430 - SOLID WASTE CIA SITE
FACILITY_ID
FA0012310
FACILITY_NAME
WORLD ENTERPRISES
STREET_NUMBER
3504
Direction
S
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17517018
CURRENT_STATUS
Active, billable
SITE_LOCATION
S TURNPIKE RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
3504 S TURNPIKE RD STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
URS <br /> Mr. Robert McClellon <br /> October 22, 2004 <br /> Page 6 <br /> concentrations and the soil gas vacuums in the monitoring probes,to assess the pilot system's <br /> effectiveness. <br /> It is likely that the short-term pilot test will remove the pool of methane gasses that have likely <br /> accumulated within the soil pores over the past years. If this is the case, it is possible that a full-scale <br /> full-time system will not needed. However,if the methane concentration along the northern boundary <br /> of the site does not decrease to acceptable levels,within a reasonable timeframe,implementation of <br /> such a system or other remediation action alternative will be implemented. Data collected during the <br /> pilot test would be used to size a full-scale active vapor extraction system. <br /> URS will provide the SJCEHD with a work plan to implement the above activities within two weeks <br /> following your review of this remediation plan. Please contact URS with any questions,comments, or <br /> concerns regarding this remediation plan. <br /> Sincerely, <br /> Inior <br /> nu e <br /> il Engineer <br /> Enclosures: Table 1 <br /> Figure 1 <br /> c: Judy McCampbell(Radio Shack) <br /> K:\Wprocess\25532\WorldEnterprise\Remediation Plan\Lettendoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.