My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
1728
>
2800 - Aboveground Petroleum Storage Program
>
PR0540694
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2021 8:48:08 AM
Creation date
11/18/2020 10:59:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0540694
PE
2832
FACILITY_ID
FA0009536
FACILITY_NAME
CONCRETE INC
STREET_NUMBER
1728
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25311027
CURRENT_STATUS
01
SITE_LOCATION
1728 LINNE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 <br />Schedule for Implementation — 40 CFR 112.3(a) <br />Initial Date of 0 eration: Prior to August 2002 Previous Plan Date: January is, 2009 Current Plan Date: February 14, 2014 <br />The following spill prevention-related equipment and procedures are scheduled to be installed or im <br />plemented at the KRC TRACY PLANT: <br />Routine monthl visual examination of all onsite oil •roduct stora e tanks. Since the tanks <br />are visible from all sides, a monthly visual inspection provides a practical alternative to <br />periodic integrity testing, while still providing equivalent environmental protection. A monthly <br />visual inspection on all sides will be performed in lieu of § 112.8(c) (6) <br />Monitor annular volume between •rima and seconda tanks <br />Ins ect seconda containment interior record findin s and seal outlets. <br />Continue month!y inspections. <br />4.0 Amendments to Plan by Regional Administrator - 40 CFR 112.4 <br />HISTORY OF SPILLS LAST 5 YEARS <br />If a facility has discharged more than 1,000 US gallons of oil in a single discharge or more than 42 <br />US gallons of oil twice within a 12-month period, the facility must submit documentation to the EPA <br />Regional Administrator. The Regional Administrator may then require the facility to amend its SPCC Plan. <br />There have been no reportable oil product spills or discharges at this site in the last five years. <br />5.0 Amendments to Plan by Owner — 40 CFR 112.5 <br />The Environmental Manager, California KRC or a qualified designee will conduct a review of this <br />SPCC Plan at a minimum of once every five years. Any amendments to this plan will be <br />documented and included on the Log of Plan Review and Amendments form in the beginning of <br />the Plan. Minor changes such as clerical errors, personnel changes, or other contact information <br />may be changed by management. Any change that occurs in the facility design, construction, <br />operation or maintenance which materially affects the facility's potential for the discharge of oil <br />requires that the Plan be modified to reflect the facility change and that a licensed Professional <br />Engineer review and certify the Plan within six months of the facility change. The Log of Plan <br />Review and Amendments will be used to track the revisions to the plan.
The URL can be used to link to this page
Your browser does not support the video tag.