Laserfiche WebLink
w�, <br />3.0 Schedule for lmplPma"+,+;__ AA <br />a.a«vI I — "+V CFR 112.3(a) <br />fnitiaf Date of O eration: Prior to August 2002 <br />9 Previous Plan Date: January 15, 2009 <br />The following spill prevention -related Current Plan Date: February 14, 2014 <br />implemented at the KRC TRACY PLANT: and procedures are scheduled to be installed or <br />' Routine monthl visual examination of all onsite oil product storage tanks. Since the tanks <br />all sides, are visible from es, a monthly visual inspection provides a practical alternative to <br />periodic integrity testing, while still providing equivalent environmental protection. A monthly <br />visual inspection on all sides will be performed in lieu of § 112.8(c) (6) <br />• Monitor annular volume between rima and seconds tanks. <br />' Inspect SeCOndary containment <br />Interior record findings and seal outlets <br />• Continue monthly inspections. <br />4.0 Amendments to Plan by Regional Administrator - 40 CFR <br />112.4 <br />HISTORY OF SPILLS LAST 5 YEARS <br />If a facility has discharged more than 1,000 US gallons of oil in a single discharge or more than 42 <br />US gallons of oil twice within a 12 -month period, the facility must submit documentation to the EPA <br />Regional Administrator- The Regional Administrator may then require the facility to amend its <br />SPCC Plan. <br />There have been no reportable oil product spills or discharges at this site in the last five years. <br />5.0 Amendments to Plan by Owner— 40 CFR 112.5 <br />The Environmental Manager, California KRC or a qualified designee will conduct a review of thi <br />SPCC Plan at a minimum of once every five years. Any amendments to this plan will b <br />documented and included on the Log of Plan Review and Amendments form in the beginning c <br />the Plan. Minor changes such as clerical errors, personnel changes, or other contact informatic <br />may be changed by management. Any change that occurs in the facility design, constructio <br />operation or maintenance which materially affects the facility's potential for the discharge of <br />requires that the Plan be modified to reflect the facility change and that a licensed Professior <br />Engineer review and certify the Plan within six months of the facility change. The Log of PI <br />Review and Amendments will be used to track the revisions to the plan. <br />