Laserfiche WebLink
6.3 Containment and/or Diversionary Structures or Equipment <br />- 40 CFR 112.7(c) <br />Secondary containment for the fuel and oil storage tanks is described in Section 15.2. To <br />provide containment of a spill outside the tank containment features, ONSITE <br />PERSONNEL will implement the oil spill contingency plan (refer to Section 7.0). <br />Spill response equipment staged at the KRC TRACY PLANT consists of the following: <br />• Spill sorbent cloth (inside shop) <br />• Hand shovel <br />• Front end loader and bulk sand <br />• Absorbent <br />• Fire extinguishers <br />7.0 Oil Spill Contingency Plan - 40 CFR 112.7(d) <br />The procedures outlined in Appendices: <br />C. INCIDENT REPORT <br />D. SPILL RESPONSE DUTY CARD — OIL HANDLING EMPLOYEES <br />E. SPILL RESPONSE DUTY CARD — INCIDENT COMMANDER <br />will be implemented in the event of an oil spill at the KRC TRACY PLANT. They are part of this <br />Spill Plan; they address KNIFE RIVER CORPORATION'S organizational structure for spill <br />response, the response steps to be taken in responding to an oil or hazardous substance <br />release, and spill notification and reporting procedures. <br />One copy of this SPCC Plan is maintained at the KRC TRACY PLANT along with other <br />environmental documents such as the hazardous material business plan, training records, and <br />Material Safety Data Sheets. A second copy of the SPCC Plan is maintained by the California <br />Environmental Manager, KNIFE RIVER CORPORATION office at 655 W Clay Street, Stockton, <br />CA 95206. <br />8.0 Inspections and Records - 40 CFR 112.7(e) <br />The condition of each tank, including its pipes, fitt <br />ings, and secondary containment, is inspected <br />regularly by the General Manager or this designee. Appendix B. MONTHLY FACILITY <br />INSPECTION REPORT AND CHECKLIST identifies monthly and annual inspection items. The <br />inspection is documented on a log sheet maintained in the facility office. <br />In general, inspections are conducted according to the guidelines set forth in the Steel Tank <br />Institute's SP001 Standard for the Inspection of Aboveground Storage Tanks, 6th Edition, issued <br />January 2018. <br />When any accumulation of precipitation is drained from secondary containment, the person <br />conducting the drainage will document the event on the log sheet, as described in Section 14.2. <br />SPCC 263-KRC-TRACY PLANT 12 <br />