Laserfiche WebLink
15.4 Integrity Testing- 40 CFR 112.8 (c)(6) <br />Monthly Inspection <br />Monthly inspections will be performed and documented using the forms located in <br />Appendix B and Appendix G. The form in Appendix G includes all of the information <br />contained on STI SP001 Monthly Inspection Checklist but has been reformatted to fit <br />on a single page. <br />Annual Inspection <br />Annual inspections will be performed and documented using the form located in <br />Appendix G. For annual inspections the 4 -page STI SP001 Annual Inspection <br />Checklist will be used for each tank. <br />Testing <br />Table 3A presents the tank integrity testing schedule according to the Steel Tank <br />Institute's (STI) SP001 Standard for the Inspection of Aboveground Storage Tanks, <br />6th Edition, issued January 2018. . <br />All piping used for product transfer will be maintained in an aboveground state. Piping at <br />the site operates at low pressure and is used intermittently for dispensing fuel. Integrity <br />testing of piping will not be required as it can be visually inspected in its entirety. <br />Lowermost drain and all outlets of tank car or tank truck are visually inspected prior to <br />filling or departure of tank car or tank truck. <br />Table 3A summarizes inspections and tests performed on bulk storage containers <br />SPCC 263-KRGTRACY PLANT 17 <br />