Laserfiche WebLink
15.5 Internal Heating Coils- 40 CFR 112.8 �c)(7) <br />The bulk storage tanks do not have internal heating coils. <br />1111 <br />Prior to delivering diesel fuel to the above ground storage tank, fhe fuel delivery eontractor <br />determines the amount o€ fuel to be delivered by gauging 'the tank. The delivery contractor <br />remains in the immediate vicinity of the 'tank during fuel transfer and meters and monitors the <br />amount of fuel delivered. The contractor can immediately respond to a potential overfill <br />situation by shutting down the delivery truck's pumping equipment. The receiving diesel fuel <br />tank does not include an automatic shut off -device that impedes and stops fuel delivery as the <br />tank nears 95% of its listed capacity. <br />Product is delivered at a controlled rate and continuously monitored to prevent overfilling. <br />Table 3B <br />TANK INTEGRITY TESTING PROGRAM <br />KRC TRACY PLANT <br />Tank ID <br />Integrity <br />Tank Configuration <br />Comments <br />Details of Testing <br />Testing <br />Standard <br />101000- <br />STI <br />Double walled steel <br />Exterior of containment <br />Periodic visual inspections <br />gallon <br />SP001-6 <br />tank, horizontal, <br />shell is visible <br />per SP001 testing <br />diesel fuel <br />cylindrical STI <br />Lack of manway <br />standard, formal external <br />tank <br />Fireguard <br />prevents interior <br />inspections every 20 years <br />configuration. Tank <br />inspection, <br />not in contact with the <br />Adequate vent relief <br />ground. Tank <br />Wall thicknessl/4" <br />conforms to UL 2085 <br />Excellent protective <br />coating <br />500 -gallon <br />STI <br />Double walled steel <br />Exterior of containment <br />Periodic visual inspections <br />diesel fuel <br />SP001-6 <br />tank, horizontal, <br />shell is visible <br />per SP001 testing <br />tank <br />cylindrical STI <br />Lack of manway <br />standard <br />Fireguard <br />prevents interior <br />configuration. Tank <br />inspection. <br />not in contact with the <br />Adequate vent relief <br />ground. Tank <br />Wall thicknessl/4" <br />conforms to UL 2085 <br />Excellent protective <br />coating <br />1 @ 200 <br />Single walled steel <br />PG&E Owned <br />Visual <br />gallon pad <br />tank. Tank is not in <br />mounted. <br />contact with the <br />transformer <br />ground. <br />15.5 Internal Heating Coils- 40 CFR 112.8 �c)(7) <br />The bulk storage tanks do not have internal heating coils. <br />1111 <br />Prior to delivering diesel fuel to the above ground storage tank, fhe fuel delivery eontractor <br />determines the amount o€ fuel to be delivered by gauging 'the tank. The delivery contractor <br />remains in the immediate vicinity of the 'tank during fuel transfer and meters and monitors the <br />amount of fuel delivered. The contractor can immediately respond to a potential overfill <br />situation by shutting down the delivery truck's pumping equipment. The receiving diesel fuel <br />tank does not include an automatic shut off -device that impedes and stops fuel delivery as the <br />tank nears 95% of its listed capacity. <br />Product is delivered at a controlled rate and continuously monitored to prevent overfilling. <br />