My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
1728
>
2800 - Aboveground Petroleum Storage Program
>
PR0540694
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2021 8:48:08 AM
Creation date
11/18/2020 10:59:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0540694
PE
2832
FACILITY_ID
FA0009536
FACILITY_NAME
CONCRETE INC
STREET_NUMBER
1728
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25311027
CURRENT_STATUS
01
SITE_LOCATION
1728 LINNE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN,JOAQUIN <br /> Environmental Health Department <br />COUN TY <br />Aboveground Petroleum Storage Act Inspection Report <br />Facility Name: <br />CONCRETE INC <br />Facility Address: <br />1728 LINNE RD, TRACY <br />Date: <br />November 17, 2020 <br />Qualified Facility - Tier I <br />404 CFR 112.6(a)(3)(ii) No 2CT for bulk containers, or mobile storage containers not located to prevent discharge n V L1 R D COS <br />405 CFR 112.6(a)(3)(iii) Overfill prevention for containers not provided, not described in Plan, or tested rIV oR o COS <br />Qualified Facility - Tier II <br />501 CFR 112.6(a)(1), <br />112.6(b) <br />Tier ll Qualified Facility Plan not certified by the owner or a PE, as required EV ER o COS <br />502 CFR 112.6(b)(2) Tier II Qualified Facility Plan technical amendment not certified by the owner or a PE oV oR oCOS <br />503 CFR 112.6(b)(3), <br />112.6(b)(4) <br />Failure to have a PE certify in writing alternative measures for a Tier ll Qualified Facility DV ER oCOS <br />504 CFR 112.6(b)(4)(i) Failure of owner to assure that a PE makes all required attestations in a Tier II Plan o V c R o COS <br />General Requirements for SPCC Plans <br />601 CFR 112.7 Failure of Plan to fulfill basic requirements including a cross-referencing section EV ER oCOS <br />602 CFR 112.7(a)(2) Plan failed to discuss equivalent environmental protection, if applicable oV oR oCOS <br />603 CFR 112.7(a)(3) Failed to adequately describe the physical layout of the facility in the Plan DV ER DCOS <br />604 CFR 112.7(a)(3)(i) Plan failed to include oil type and storage capacity for each container DV DR oCOS <br />605 CFR 112.7(a)(3)(ii) Plan failed to adequately discuss discharge prevention measures, including routine handling oV oR oCOS <br />606 CFR 112.7(a)(3)(iii) Plan failed to adequately discuss facility drainage or drainage controls oV oR oCOS <br />607 CFR 112.7(a)(3)(iv) Plan failed to include countermeasures for discharge discovery, response and cleanup oV ER oCOS <br />608 CFR 112.7(a)(3)(v) Plan failed to address disposal methods for recovered materials oV oR oCOS <br />609 CFR 112.7(a)(3vi), <br />112.7(a4) <br />Plan failed to adequately contain procedures for reporting a discharge DV ER oCOS <br />610 CFR 112.7(a)(5) Discharge procedures are not adequately addressed if the facility has no response plan oV oR o COS <br />611 CFR 112.7(b) Plan failed to include a description of potential equipment failure or provide equivalence oV oR oCOS <br />612 CFR 112.7(c) Plan failed to discuss general secondary containment, equipment, or structures to prevent discharge oV DR ECOS <br />613 CFR 112.7(c) Failure to provide appropriate secondary containment, diversionary structures or equipment oV E R 3 COS <br />614 CFR 112.7(d) PE certified Plan failed to explain impracticability of containment/diversionary structures oV ER oCOS <br />615 CFR 112.7(d) Failure to perform integrity and leak testing when claiming secondary containment impracticability oV DR oCOS <br />616 CFR 112.7(d)(1) Failure to prepare an oil spill contingency plan when claiming impracticability of structures oV DR oCOS <br />617 CFR 112.7(d)(2) No written commitment of manpower, equipment, and materials to control and remove oil discharge oV oR oCOS <br />618 CFR 112.7(e), 112.8(c) <br />(6) <br />Failure to keep written records of procedures, inspections, and tests for at least three years oV ER oCOS <br />619 CFR 112.7(f)(1) Failed to train personnel on all discharge prevention details listed in this section oV DR DCOS <br />620 CFR 112,7(0(2) Failed to designate a person accountable for discharge prevention oV ER DCOS <br />621 CFR 112.7(0(1) Failure to include in the SPCC Plan an adequate description of employee training oV oR EGOS <br />622 CFR 112.7(f)(3) Failure to conduct complete annual discharge prevention briefings for oil-handling personnel DV oR oCOS <br />623 CFR 112.7(g) Plan failed to address security of site and valves, lock out/tag out, and lighting DV DR oCOS <br />624 CFR 112.7(g) Facility failed to implement security measures listed in the SPCC Plan (lighting, security, etc.) oV DR EGOS <br />625 CFR 112.7(h) Plan failed to adequately discuss facility tank car and tank truck loading/unloading rack oV oR ECOS <br />FA0009536 PR0540694 SC001 11/17/2020 <br />EHD 28-01 Rev. 9/16/2020 Page 2 of 5 Aboveground Petroleum Storage Act OIR <br />1868 E. Hazelton Avenue I Stockton, California 95205 I T 209 468-3420 I F 209 464-0138 I www.sjgov.org/EHD
The URL can be used to link to this page
Your browser does not support the video tag.