My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1501
>
2900 - Site Mitigation Program
>
PR0543636
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 4:26:21 PM
Creation date
11/18/2020 2:12:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543636
PE
2950
FACILITY_ID
FA0024790
FACILITY_NAME
STOCKTON REDEVELOPMENT AGENCY PROPERTY
STREET_NUMBER
1501
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
16903013
CURRENT_STATUS
01
SITE_LOCATION
1501 S AIRPORT WAY
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
>ITE MITIGATION PROGRAM CHECKLIST <br /> SITELOCATION: <br /> FA#: PR# <br /> DATE ACTIVITY INITIAL <br /> Review submittal and make sure all documents/fees have been submitted. <br /> Request documents/fees not submitted. <br /> Provide MFR to Accounting to ensure project has a FA#and a PR#. The PR#for a <br /> of-1 project does not change. If the lead agency changes, a new PR#must be created under <br /> the existing FA. <br /> Issue SR for Work Plan Review— Enter the data into the SR form in EC making sure <br /> to link the SR to the related FA. Generate an SR#and document on the permit form. If <br /> no permit form has been submitted, record the information on a golden rod Service <br /> Request form. Use this SR#on your DAR to track time spent obtaining documents/ <br /> fees, reviewing work plan, issuing permits, coordinating field work activities, reviewing <br /> subsequent report/sample results, making notifications/referrals. <br /> Work Plan SR#: (90"1 qn, 2;r L)el- <br /> Review Work Plan to ensure scope of work matches the scope of work approved by <br /> 1 the lead agency and that the mw construction/destruction meets SJC Ordinance Code �( <br /> and well standards. <br /> Issue Permits- Enter permit information into WP form in EC, link to the FA#for the <br /> project, and obtain a WP#. Use this WP#on DAR to track time spent in the field for the �( <br /> specific mw/boring activity specified on the permit. ` <br /> WF @03 OC, � Scope: v r x <br /> WF 00 3 Scope: 13�.'� <br /> WP#: Scope: <br /> WP#: Scope: <br /> WP#: Scope: <br /> After scope of work on the well and boring permit WPs are complete, update the <br /> following fields in the Well Permit Approval Dates section of the WP form in EC: Plan <br /> Status—choose 'Finaled'; Final Inspection—enter date permit finaled. <br /> After all field work is complete, flag calendar to follow up on report of findings. <br /> Report Review: <br /> • Environmental Assessment Projects -Review report to determine if <br /> contamination was found. If contamination present, print out a 5021 and request a <br /> new PR# be issued under PE 2960. Provide 5021 to Accounting Office for <br /> processing. Complete a Prop 65 Notification. Send notification letter to CVRWQCB. <br /> • EHD Lead Oversight Projects -Review report to determine next phase of work to <br /> be conducted or if closure is appropriate. Complete Prop 65 for any new <br /> contaminants found at the site. <br /> • Other Lead Agency Projects -Review report to determine if any immediate public <br /> health issues are found. If public health concerns are found, notify supervisor <br /> immediately for follow up and further notifications. Complete Prop 65 for any new <br /> contaminants found at the site. <br /> After scope of work for the project SR is complete, update the following fields in the <br /> Service Request Approval Dates section of the SR form in EC: Plan Status—choose <br /> 'Finaled'; Final Inspection—enter date work finalized. <br /> EHD-29 8115117 Site Mitigation Program Checklist <br />
The URL can be used to link to this page
Your browser does not support the video tag.