My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013726
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELLEN
>
930
>
2600 - Land Use Program
>
PA-2000180
>
SU0013726
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 9:23:38 AM
Creation date
11/19/2020 2:04:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013726
PE
2625
FACILITY_NAME
PA-2000180
STREET_NUMBER
930
Direction
N
STREET_NAME
ELLEN
STREET_TYPE
ST
City
STOCKTON
Zip
95215-
APN
14328020
ENTERED_DATE
10/28/2020 12:00:00 AM
SITE_LOCATION
930 N ELLEN ST
RECEIVED_DATE
10/6/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i. SIGNS: Sign details shall be consistent with Chapter 9-1710 of the Development Title and be <br /> included on the Site Plan. All portions of any sign shall be set back a minimum of five (5) feet from <br /> any future right-of-way line, including any corner cut-off (snipe). (Development Title Section 9- <br /> 1710.2[g]) <br /> j. BUILDING CODE REQUIREMENTS: The following California Building Code (CBC) and San <br /> Joaquin County Ordinance requirements will be applicable to the proposed project. The following <br /> conditions shall be addressed prior to submittal of a building permit application to the Building <br /> Inspection Division: <br /> 2. DEPARTMENT OF PUBLIC WORKS (Contact: [209] 468-3000) <br /> a. An encroachment permit shall be required for all work within road right-of-way. (Note: Driveway <br /> encroachment permits are for flatwork only—all vertical features,including but not limited to fences, <br /> walls, private light standards, rocks, landscaping and cobbles are not allowed in the right-of-way.) <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> b. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Improvement Standards Drawing No. R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> c. The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six (6) foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more. Required retention basin capacity <br /> shall be calculated and submitted along with a drainage plan for review and approval, prior to <br /> release of building permit. (Development Title Section 9-1135) <br /> d. The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and payable <br /> at the time of building permit application. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolution R-00-433) <br /> e. The Regional Transportation Impact Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current schedule at <br /> the time of payment. (Resolution R-06-38) <br /> f. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee <br /> is due and payable prior to issuance of the building permit. The fee will be based on the current <br /> schedule at the time of payment. (Development Title Section 9-818.4 and Resolutions R-91-327, <br /> R-94-185 and R-97-5) <br /> g. All vehicular parking related to applicant's proposed development shall be onsite at all times. <br /> Parking in the County right-of-way shall be prohibited. It is the responsibility of applicant to monitor <br /> Ellen Street to ensure compliance with this requirement. <br /> h. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> i. This project is a NPDES Phase I regulated area and shall comply with the following conditions. <br /> Prior to release of the building permit, plans and calculations shall be submitted and approved by <br /> the Public Works Department—Water Resources Division (209-468-9360): <br /> 1. Treatment: A registered professional engineer shall design the site to treat the 851h percentile <br /> storm as defined in the County's 2021 Storm Water Quality Control Criteria Plan (SWQCCP). <br /> 2. Hydromodification: A registered professional engineer shall design the site to comply with the <br /> volume reduction requirement outlined in the County's 2021 SWQCCP. <br /> PA-2000180 (UP) —Conditions of Approval 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.