My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
1600 - Food Program
>
PR0527329
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 9:35:58 AM
Creation date
11/19/2020 2:10:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0527329
PE
1617
FACILITY_ID
FA0018504
FACILITY_NAME
FAST LANE CENTRAL VALLEY
STREET_NUMBER
116
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19602020
CURRENT_STATUS
01
SITE_LOCATION
116 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�D� r <br /> SHOPCO <br /> SHOP-FLEX Metal Cabinet System <br /> ASSEMBLY INSTRUCTIONS <br /> 1. Attach the base panels to the side panels. <br /> 2. Place the top u-bar in the front. <br /> 0 ' Q ' <br /> 00 • <br /> 0 0 <br /> IF MODULE 15 TO HAVE A FINISHED BACK: <br /> 3. Position the mini slat,solid steel or partially open panel on the back. <br /> Attach to the sides with self-tapping screws(supplied) in the pre-drilled <br /> holes. <br /> IF BACK IS OPEN: <br /> 4. a. Attach the two bracing bars to the side panels with self-tapping <br /> screws in the pre-drilled holes. The module is stable with an open back. <br /> M <br /> 0 • <br /> • Q <br /> • IF BACK 15 TO BE A WOOD PANEL: <br /> Attach two bracing bars,per 4.a, Place the wood laminate <br /> panel behind the bracing bars and attach with wood <br /> o • <br /> screws through the pre-drilled holes in the bracing bars. <br /> 0 ' <br /> 5. If you need to have electrical wires or plumbing going <br /> into or through the cabinet,now is the time to punch out <br /> the pre-cut holes near the bottom of the side panels. •� <br /> o <br /> co <br /> 6. Align the cabinets as designed. Secure cabinets together using <br /> I the bolts and nuts(supplied)through the pre-drilled holes in the sides. <br /> 1 / NOTE: If drawers are to be included.connect the slide support panels to the <br /> nside of the cabinets before the connecting bolts are inserted (the some holes <br /> are used for both).Then insert drawers onto the slides. <br /> On The Front Side You Have The Following Options: <br /> 7. Leave it open. <br /> 8. If doors are to be included,attach the hinges to the cut outs in the back side of the door in the pre-drilled <br /> slots. Secure with screws. Next attach the hinges to the sides of the cabinets with three screws through the <br /> pre-drilled holes. Adjust hinges so that doors are level. <br /> 9. Place the counter top on the cabinets in its correct position and attach with wood screws through the <br /> holes in the top flange of the cabinet sides. One screw per side is plenty. <br /> The installation is now complete. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.