Laserfiche WebLink
MONITORING AND REPORTING PROGRAM NO. R5-2008-0148 -4- <br /> LAWRENCE LIVERMORE NATIONAL SECURITY, LLC AND <br /> THE U.S. DEPARTMENT OF ENERGY FOR <br /> LAWRENCE LIVERMORE NATIONAL LABORATORY SITE 300 <br /> SAN JOAQUIN AND ALAMEDA COUNTIES <br /> Table 4. Buildings 812, 834, 850, and 899 septic system groundwater analytical <br /> methods and reporting limits <br /> Analyte EPA (E) or Reporting Units <br /> Standard Method (SM)' limit <br /> Nitrate as NO3 E300.0, E354.1, or E353.2 0.5 m /L <br /> Total coliform SM 9211 2 MPN/100mL <br /> Fecal coliform SM 9211 2 MPN/100mL <br /> Ground water elevation Field measurement Not Feet or Meters <br /> Applicable <br /> Or equivalent method as approved by the Regional Water Board. <br /> PERCOLATION PIT INSPECTIONS <br /> 9. The Discharger shall inspect quarterly the five mechanical equipment percolation pits <br /> located at Buildings 806A, 827 A, C, D, and E. If standing water is visible during the <br /> quarterly inspection, the Discharger shall increase the inspection frequency to monthly <br /> until no standing water is visible. <br /> 10.The Discharger shall inspect quarterly the seven cooling tower percolation pits located <br /> at Buildings 801 , 809, 812, 817A, 826, 827A, and 851 . If standing water is visible <br /> during the quarterly inspection the Discharger shall increase the inspection frequency <br /> to monthly until no standing water is visible. The more frequent inspections are <br /> required at percolation pits with standing water in order to prevent overflow of the <br /> percolation pits. <br /> COOLING TOWER BLOWDOWN EFFLUENT MONITORING <br /> 11.The Discharger shall semi-annually collect representative grab samples of blowdown <br /> discharges from each active cooling tower for the analytes shown in Table 5. Active <br /> cooling towers which discharge to percolation pits are located at Buildings 801, 809, <br /> 812, 817A, 826, 827A, and 851 . Cooling towers which discharge to septic systems are <br /> located at Buildings 802, 825, 830, 833, 835, 834A, and 850. <br /> 12.The Discharge shall also record the total flow monthly blowdown flow from the cooling <br /> towers. <br /> MECHANICAL EQUIPMENT DISCHARGE EFFLUENT MONITORING <br /> 13.The Discharger shall semi-annually collect representative composite samples of <br /> mechanical equipment discharges at Buildings 827 A, C, D, E and 806A for the <br /> analytes shown in Table 5. Composite samples shall be representative of the <br /> combined discharge to the percolation pit during a day of operation at each specified <br /> facility. <br />