LATCH SIDE ABBREVIATIONS SYMBOLS LEGEND GENERAL NOTES
<br /> APPROACH
<br /> LATCH SIDE APPROACH ABBR DEFINITIONV lo I REFERENCE AT 1. CONTRACTOR SHALL, PRIOR TO COMMENCEMENT OF WORK, FIELD VERIFY ALL EXISTING PROJECT CONDITIONS, INCLUDING DIMENSIONS
<br /> FRONT APPROACH AC AIR CONDITIONER X-XX KEYNOTE INDICATOR AND UTILITY LOCATIONS AND UTILITY SIZES.
<br /> ADJ ADJACENT 10.1 KEYNOTE INDICATOR 2. FIELD CONFIRMATION OF DISCREPANCIES SHALL BE RECORDED ON A REPRODUCIBLE DOCUMENT AND IMMEDIATELY TRANSMITTED TO
<br /> AFF ABOVE FINISH FLOOR A KEYNOTE OR BLOCK OF ARCHITECT FOR PROJECT RECORD, COORDINATION, AND NECESSARY RESOLUTION PRIOR TO CONTINUING WITH WORK.
<br /> 1 i ALUM ALUMINUM X.XX KEYNOTES WITH A LEADER 3. CONTRACTOR SHALL VERIFY, AND BE RESPONSIBLE FOR, ALL WORK AND MATERIALS - INCLUDING THOSE FURNISHED BY
<br /> = I 1 I ARCH ARCHITECTURAL X.XX SUBCONTRACTORS.
<br /> ATTACHED APPLY
<br /> O I 1 1 4. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED SIZES; DO NOT SCALE DRAWINGS TO DETERMINE ANY LOCATIONS THE Architect of Record:
<br /> = I 1 I BFF BELOW FINISH FLOOR X.XX SPECIFICALLY TO THE ITEM
<br /> HINGE SIDE o O 1 1 I LATCH SIDE ARCHITECT SHALL BE NOTIFIED OF ANY DISCREPANCIES, PRIOR TO CONTINUING WITH WORK. Mariah B.Meyer
<br /> APPROACH z < I I i I APPROACH BO BOTTOM OF AREA, OR SURFACE TO
<br /> a O 1 1 1 1 BRG BEARING 5. ALL DIMENSIONS ON PLANS ARE TO CENTERLINE OF WALLS AND COLUMNS, FACE OF STUD (FOS) OR FACE OF MASONRY (FOM), UNLESS 8131 Metcalf Avenue
<br /> WHICH THE LEADER IS Suite 300
<br /> w a_ I I i I NOTED OTHERWISE.
<br /> Q w w 1 1 i 1 CJ CONTROL JOINT POINTING Overland Park,K566204
<br /> c� w 1 1 1 6. ALL WORK SHALL CONFORM TO THE LATEST ADOPTED EDITIONS OF ALL APPLICABLE BUILDING CODES; REFER TO PROJECT DATA, THE
<br /> Z Q 22" HINGE 1 " CL CENTERLINE www.brrarch.com
<br /> 1 1 24 LATCH SIDE APPROACHCMU CONCRETE MASONRY UNIT SALES AMERICANS WITH DISABILITIES ACT, AS WELL AS ALL OTHER LOCAL GOVERNING CODES AND ORDINANCES.
<br /> z = = SIDE APPROACH IN ADDITION TO THE 7. CONTRACTOR SHALL REPORT TO THE OWNER ANY ERRORS, OMISSIONS, OR INCONSISTENCIES HE MAY DISCOVER ON THE Tel:913-262-9095
<br /> O - O CONT CONTINUOUS F100 ROOM FINISH SCHEDULE, Fax:913-262-9044
<br /> LL_ 00 � I i -IDIA DIAMETER SPECIFICATIONS OR DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY ERROR AFTER THE START OF CONSTRUCTION,
<br /> 12 FRONT APPROACH XX X.XX A KEYNOTE OR BLOCK WHICH HAS NOT BEEN BROUGHT TO THE ATTENTION OF THE OWNER AT THE CONTRACTOR'S EXPENSE. THE MEANS OF CORRECTING ANY
<br /> 1/2" MAX J i 1 i DWG DRAWING X.XX X.XX OF KEYNOTES ATTACHED ERROR SHALL FIRST BE APPROVED BY THE OWNER.
<br /> THRESHOLD HEIGHT � I 1 EJ EXPANSION JOINT X.XX X.XX TO THE ROOM NAME 8. THE GENERAL BUILDING PERMITS SHALL BE PAID FOR BY THE OWNER AND SECURED BY THE GENERAL CONTRACTOR. ALL OTHER
<br /> 1 1 1 EL ELEVATION TAG APPLY TO THE REQUIRED PERMITS SHALL BE SECURED AND PAID FOR BY THE CONTRACTOR OR SUBCONTRACTOR DIRECTLY RESPONSIBLE.
<br /> EXT ELECTRICAL ENTIRE ROOM 9. ALL REQUIRED CITY AND COUNTY LICENSES SHALL BE ACQUIRED AND PAID FOR BY THE INDIVIDUAL TRADES. Q=
<br /> ______________ EXT EXTERIOR 10. ALL CONTRACTORS SHALL HAVE VALID CERTIFICATES OF WORKMAN'S COMPENSATION ON FILE WITH THE APPROPRIATE AGENCIES. 07 0U`a ~ z~ �O
<br /> EQ EQUAL °zW��� -z
<br /> INSURANCE REQUIREMENT MUST BE MET PER LEASE AGREEMENT. w 0 d~~w w° w O ~
<br /> 18" FRONT APPROACH FE FIRE EXTINGUISHER � 'E�z°LL w=a _ o 0
<br /> _ _ 1 i 24" AT EXTERIOR FF FINISH FLOOR S � EQUIPMENT INDICATOR 11. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING UTILITIES, WHETHER SHOWN HEREIN OR NOT, AND TO a a zo w
<br /> 1 1 PROTECT THEM FROM DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSE FOR THE REPAIR OR REPLACEMENT OF UTILITIES AND ALL p w w} Q w=w Q o�u
<br /> HINGE SIDE O v FFE FINISH FLOOR ELEVATION o z a c�F o�w
<br /> Q Q w 1 1 24 LATCH SIDE APPROACH OTHER PROPERTY DAMAGED BY OPERATIONS IN CONJUNCTION WITH EXECUTION OF WORK. a N Z z o F<z o W5 w a W a
<br /> APPROACH O O 1 FRP FIBERGLASS REINFORCED PLASTIC z U ¢w a-z w r
<br /> Of 0f 1 1 P3 COLOR INDICATOR 12. CONTRACTOR SHALL PROVIDE TEMPORARY FIELD OFFICE TELEPHONES FAX MACHINE TEMPORARY SECURITY FENCE WATER POWER a-o awz o"
<br /> w w U) _ I GA GAUGE O ��ZN=Ogz�2003z
<br /> w O_ O 1 I IIB-703.7.2.1 InternationalS%•ntbulofAc•ce55ibilift. AND TOILET FACILITIES. COORDINATE LOCATIONS WITH ALL APPROPRIATE AGENCIES. FIELD OFFICE SHALL ALSO CONTAIN CURRENT °wa woo= wc�oa
<br /> _ ¢ GC GENERAL CONTRACTOR za��O� �wi->w?�o
<br /> Q - Q 1 1 The Intem,alional Symbol of Accessibility sh.11l rum l : Q '°j w M a J a w
<br /> a 0 O 1 LATCH SIDE Y P) GPS GLASS PANEL SYSTEM COPIES OF ALL GOVERNING BUILDING CODES AND AMENDMENTS. a a a o t„ W a N g
<br /> w ~ / 1 ` APPROACH with Figure l!B 703.7.2.1. The syrrllrr►!shall rurr.rist of 13. CITY APPROVED PLANS SHALL BE KEPT IN A PLAN BOX AND SHALL NOT BE USED BY WORKMEN. ALL CONSTRUCTION SETS SHALL REFLECT C)z w o m°w Q W z w 0 w
<br /> z o Q w GYP BD GYPSUM BOARD oo�wQ'ox�au oma==
<br /> J 1 1 a white r cure on a blue bark raiand. Tile color blue FULL AND PARTIAL D)w z��o w w o 0 0�o�F-
<br /> O F0 w 1 1 fS HC HANDICAP ACCESSIBLE 8-A3 THE SAME INFORMATION. THE CONTRACTOR SHALL ALSO MAINTAIN IN GOOD CONDITION, ONE (1) COMPLETE SET OF PLANS WITH ALL
<br /> af - Q i i 1 shall approximate F.S 15090 in Federal Standard 595C. SECTION INDICATOR to F-Z)°o n a D O W a a F-a a°
<br /> w w o i i I I HM HOLLOW METAL REVISIONS, ADDENDA, AND CHANGE ORDERS ON THE PREMISES AT ALL TIMES. THESE ARE TO BE UNDER THE CARE OF THE JOB
<br /> 36 HINGE SIDE Abordern avbe provided inside or o the nlini
<br /> c� co I I 1 f SUPERINTENDENT.
<br /> o z 1 1 APPROACH ►num required International 5ttnbo[ of Accessibilitt JBE JOIST BEARING ELEVATION 14. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE SITE WHILE JOB IS IN PROGRESS UNTIL WORK IS COMPLETE.
<br /> C° = i i dimension. MAX MAXIMUM EXTERIOR AND INTERIOR 15. CONTRACTOR SHALL MAINTAIN THE JOB SITE IN A CLEAN AND ORDERLY MANNER. ALL DEBRIS SHALL BE REMOVED FROM PREMISES AND
<br /> 1 1 MEM METAL BUILDING MANUFACTURER 2-A2 ELEVATION INDICATOR ALL AREAS SHALL BE LEFT IN BROOM-CLEAN CONDITION AT ALL TIMES. CONTRACTOR SHALL LOCATE AND MAINTAIN A TRASH BIN AT THE CONSULTANT LOGO
<br /> Exceptiotrs: MECH MECHANICAL
<br /> i i 1 1
<br /> L_______________________L_J____J 1. The appropriate enforrement agenn, nun• MFR MANUFACTURER SITE. SUCH BIN SHALL BE OF ADEQUATE DIMENSION TO KEEP SITE CLEAN AT ALL TIMES. DUST RESULTING FROM SALVAGE, DEMOLITION,
<br /> approve atJter colors provided !Ile synrbo! MIN MINIMUM SALES AND REMOVAL WORK, SHALL BE CONTROLLED TO PREVENT THE IMPOSITION OF A NUISANCE OR HAZARDOUS CONDITION TO THE
<br /> FRONT APPROACH AP p 100 ROOM NAME AND NUMBER ADJOINING PORTION OF THE PROJECT. THE USE OF WATER WILL NOT BE PERMITTED WHEN SUCH USE WOULD RESULT IN HAZARDOUS, OR
<br /> NOTE: contrast is light on dark ordar•k-o►t lit lir. MISC MISCELLANEOUS 0 OTHERWISE OBJECTIONABLE CONDITIONS.
<br /> CLEARANCES ARE FOR ALL DOORS MO MASONRY OPENING
<br /> THAT ARE 3'-0" OR WIDER UNLESS LATCH SIDE APPROACH 1. On lite accessibility function buttonon hall MTL METAL
<br /> NOTED OTHERWISE, CLEARANCES NIC NOT IN CONTRACT 16. CONTRACTOR SHALL PROVIDE PEDESTRIAN PROTECTION IN ACCORDANCE WITH ALL APPLICABLE BUILDING CODES.
<br /> ol call consoles in a destination-oriented eleva- A6 PARTITION TYPE INDICATOR 17. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY OF THE OCCUPANTS AND WORKERS AT ALL TIMES.
<br /> for systent the International Symbol qfAcres- 18. CONTRACTOR SHALL PROVIDE REQUIRED PROTECTION INCLUDING, BUT NOT LIMITED TO, SHORING, BRACING, AND ALL OTHER SUPPORTS
<br /> slbiliry' skull be rr white s�rrl6ol on rr black
<br /> MEET ACCESSIBLE MIN DOOR CLEARANCES HINGE SIDE APPROACH NTS NOT TO SCALE
<br /> FOR DOORS WITH A LATCH AND OC ON CENTER INCLUDING ENGINEERING OF SYSTEMS NECESSARY TO MAINTAIN OVERALL STRUCTURAL INTEGRITY OF THE BUILDING.
<br /> CLOSER OR JUST A CLOSER background. OH OPPOSITE HAND 1A DOOR INDICATOR 19. WOR
<br /> K.
<br /> PTT PRESSURE TREATED DEMOLITION AND CUTTING SHALL E PERFORMED IN A MANNER AND BY METHODS WHICH ENSURE AGAINST DAMAGE TO EXISTING
<br /> n'vufreaa�e,tsion PPLASTIC LAMINATE 20. NO STRUCTURAL MEMBERS SHALL BE CUT TO ACCEPT PIPES, VENTS, DUCTS, OR OTHER PENETRATIONS, EXCEPT AS DETAILED OR
<br /> AREF REFERENCE SPECIFIED HEREIN.
<br /> ULING CES AD ORDINANCES.
<br /> TYPICAL DOOR CLEARANCES LATCH SIDE RO ROUGH OPENING M WINDOW INDICATOR 22. ALL G ASSO AND GLAZING SHALL. GYSUM BARD AND SUSPENDED COMPLY WITHT ALL APPLICAB EF BUILDINNGCEILING SYSEMS SHALL CONORTOACODEOSC AS WELLR AS THEE IUDS CONOSDUMERNPRODUUCT SAFETY
<br /> RTU ROOF TOP UNIT
<br /> APPROACH SIM SIMILAR COMMISSION, SAFETY STANDARDS FOR ARCHITECTURAL GLAZING MATERIALS (47 FR, 13516 TITLE NO. 16, CHAPTER 11, PART 1201). w
<br /> 23. CONTRACTOR SHALL ASSIST OWNER IN OBTAINING FINAL APPROVAL OF LOCAL HEALTH DEPARTMENT AND THE TEMPORARY AND FINAL Q Z
<br /> STRUC STRUCTURAL O TV MONITOR. REFER TO O
<br /> CERTIFICATES OF OCCUPANCY.
<br /> TO TOP OF 3-A3 FOR BRACKET 0 o <
<br /> LU 24. CONTRACTOR SHALL BE RESPONSIBLE FOR, AND SHALL REMEDY, REPAIR, OR REPLACE ANY FAULTY, IMPROPER OR INFERIOR I- Q
<br /> UNO UNLESS NOTED OTHERWISE SUPPORT DETAIL. VERIFY cn U
<br /> THK THICK EXACT LOCATION WITH LOSS WORKMANSHIP OR MATERIALS AND ANY RELATED DAMAGE CAUSED BY THESE WHICH SHALL APPEAR WITHIN ONE 1 YEAR AFTER THE d O
<br /> COMPLETION AND ACCEPTANCE OF THE WORK UNDER THIS CONTRACT. REFER TO SPECIFICATIONS FOR WARRANT EQUIREMENTS IN w w
<br /> FIGURE 119.703.7.2.1 TYP TYPICAL PREVENTION MANAGER. X X
<br /> INTERNATIONAL SYMBOL OF ACCESSIBILITY EXCESS OF ONE (1) YEAR. 0_ Y
<br /> A25. IN ADDITION TO EQUIPMENT WARRANTIES, FURNISH OWNER A WRITTEN GUARANTEE AGAINST LATENT AND PATENT DEFECTS IN z to
<br /> COLUMN LINE INDICATOR QU) w
<br /> MATERIALS AND WORKMANSHIP FOR ONE (1) YEAR. GUARANTEE SHALL INCLUDE REPAIR, DAMAGE TO, OR REPLACEMENT OF, ANY PART OF w o
<br /> MOLD AND MILDEW NOTES 26. EQUIPMENT PROVIDED. < cow
<br /> PIPES, CONDUITS, OR DUCTS EXCEEDING ONE THIRD OF THE SLAB OR MEMBER THICKNESS SHALL NOT BE PLACED IN STRUCTURAL
<br /> >_ CONCRETE UNLESS SPECIFICALLY DETAILED. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, AND STRUCTURAL DRAWINGS FOR r , N a w
<br /> OO HEIGHT ELEVATION INDICATOR LOCATION OF SLEEVES AND OTHER ACCESSORIES.
<br /> IRV FFEL
<br /> 27. ALL ELECTRICAL, MECHANICAL, AND PLUMBING WORK SHALL CONFORM TO THE REQUIREMENTS OF ALL THE LEGALLY CONSTITUTED 0
<br /> Z
<br /> 1. IN THE EVENT THE CONTRACTOR DISCOVERS, AT ANY TIME DURING DEMOLITION, CONSTRUCTION AND/OR REMODELING OPERATIONS, EXISTING CONDITIONS THAT COULD INCLUDE AUTHORITIES HAVING JURISDICTION. z w O
<br /> THE PRESENCE OF MOLD AND/OR MILDEW, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE TENANT'S REPRESENTATIVE AND THE PROFESSIONAL OF RECORD, IN WRITING OF 28. CONTRACTOR SHALL PROVIDE BACKING FOR SUPPORT OF ALL WALL, CEILING, AND PARTITION MOUNTED ITEMS SUCH AS TABLE O p o
<br /> CONCERNS AND/OR SUSPICIONS. 100'-0" PLAN ELEVATION INDICATOR BRACKETS, LIGHT FIXTURES, ARTIFACTS, SHELVING, EQUIPMENT, AND TELEVISIONS. COORDINATE LOCATIONS AND REQUIREMENTS WITH O d Q
<br /> 2. CONCURRENTLY, THE CONTRACTOR SHALL BE RESPONSIBLE TO RETAIN A MOLD AND MILDEW CERTIFIED TESTING AGENCY TO PERFORM AN INVESTIGATION AND TESTING AS THE PLUMBING, MECHANICAL, ELECTRICAL, AND FOOD SERVICE DRAWINGS, AS WELL AS INTERIOR DESIGN CONSULTANT AND OWNER.
<br /> REQUIRED TO EVALUATE THE NATURE AND EXTENT OF THE PROBLEM. IF THE TESTING AGENCY CONFIRMS HAZARDS, THE CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN A 29. CONTRACTOR SHALL VERIFY LOCATIONS OF FOOD SERVICE EQUIPMENT AND COORDINATE LOCATIONS OF FLOOR SINKS, FLOOR DRAINS, o
<br /> MINIMUM OF TWO (2) BIDS FROM COMPANIES QUALIFIED AND LICENSED TO PERFORM ALL NECESSARY REMEDIATION WORK, COMPLYING WITH ALL LOCAL, STATE, AND FEDERAL 5 TROUGH DRAINS, SLAB DEPRESSIONS, RAISED CURBS, ELECTRICAL STUB-OUTS, PLUMBING STUB-OUTS, AND ALL OTHER WORK UNDER
<br /> ENVIRONMENTAL REGULATIONS, CODES AND STATUTES. THE SCOPE OF RESPONSIBILITIES RELATED TO THIS EQUIPMENT. REFER TO THE FOOD SERVICE DRAWINGS FOR ADDITIONAL
<br /> 3. ONCE DISCOVERY OR SUSPICION OF MOLD AND/OR MILDEW IS MADE, THE CONTRACTOR SHALL TAKE ALL RESPONSIBLE AND PRACTICE PRECAUTIONS TO PROTECT ALL A2 INFORMATION. co
<br /> CONSTRUCTION PERSONNEL AND THE PUBLIC FROM EXPOSURE TO MOLD AND/OR MILDEW, AND SUCH PRECAUTIONS SHALL REMAIN IN PLACE UNTIL SUCH A TIME AS THE OWNER 30. EXTERIOR OPENINGS SHALL COMPLY WITH ALL SECURITY REQUIREMENTS AS OUTLINED IN ALL LOCAL BUILDING CODES AND ORDINANCES.
<br /> OR HEALTH AUTHORITY DIRECTS OTHERWISE. CONSTRUCTION OPERATIONS SHALL NOT BE STOPPED OR CURTAILED, EXCEPT IN THE AREA OF MOLD/MILDEW CONCERN, DUE TO ENLARGED DETAIL INDICATOR 31. ACCURATE AS-BUILT DRAWINGS SHALL BE GENERATED BY CONTRACTOR DURING CONSTRUCTION AND SUBMITTED TO OWNER UPON
<br /> THESE REQUIRED PRECAUTIONS. COMPLETION OF FINAL PUNCH LIST, BUT PRIOR TO REQUEST FOR FINAL PAYMENT. WITHIN TWO WEEKS AFTER C.O. IS ACQUIRED.
<br /> 4. THE CONTRACTOR SHALL MAKE REASONABLE EFFORTS TO AVOID CONDITIONS FAVORABLE TO THE DEVELOPMENT OF MOLD AND MILDEW, ESPECIALLY IN VOIDS WHICH WILL BE L
<br /> 32. FOUR (4) SETS OF EQUIPMENT OPERATING AND MAINTENANCE MANUALS SHALL BE SUBMITTED TO THE OWNER UPON COMPLETION OF w
<br /> CONCEALED AND NOT VENTILATED. IN ALL CASES, INTERIOR SPACES AND INTERIOR FINISHED CONSTRUCTION SHALL BE MAINTAINED IN DRY AND WELL-VENTILATED CONDITIONS. E1C �
<br /> 5. THE CONTRACTOR SHALL COMPLY WITH FEDERAL, ENVIRONMENTAL, AND OSHA REGULATIONS AND ALL LOCAL AND STATE HEALTH DEPARTMENT REQUIREMENTS AND PROJE T, BUT PRIOR TO REQUEST FOR FINAL PAYMENT. WITHIN TWO WEEKS AFTER C.O. IS ACQUIRED.
<br /> 33. CONTRACTOR SHALL NOT ALLOW ANY PERSON TO DESCEND INTO ANY TRENCH OR HOLE, OR CREATE ANY SUCH EXCAVATIONS, WITHOUT Z)
<br /> RECOMMENDATIONS REGARDING MOLD AND MILDEW. ALL PENETRATIONS SHALL BE SEALED WATER-TIGHT TO PREVENT MOISTURE MIGRATION FROM ENTERING THE BUILDING OR THE PRIOR APPROVAL OF BUILDING DEPARTMENT AS WELL AS ALL OTHER AGENCIES HAVING JURISDICTION. Z
<br /> WALL CAVITIES. 34. VERIFY FIRE EXTINGUISHER REQUIREMENTS AND LOCATIONS WITH FIRE MARSHAL AND OWNER'S REPRESENTATIVE. O
<br /> 6. INSURE THAT THERE ARE NOT WATER LEAKS IN CONCEALED PLUMBING CHASES. RETURN AIR PATHS AND PLENUMS SHALL BE KEPT DRY. ALL EXISTING SUPPLY AIR PATHS AND 35. CONTRACTOR SHALL SEAL ALL GAPS, HOLES, AND CRACKS IN BUILDING CONSTRUCTION AS REQUIRED TO CONTROL INFILTRATION OF 3
<br /> ALL EXISTING DUCTWORK TO BE RE-USED SHALL BE CLEANED AND TREATED AS REQUIRED TO REMOVE POTENTIAL FOR MOLD AND MILDEW. ALL DAMP AREAS SHALL BE DRIED 5 INSECTS.
<br /> THOROUGHLY PRIOR TO ENCLOSURE. A2 36. CONTRACTOR SHALL INSTRUCT SUBCONTRACTORS TO CAREFULLY REVIEW THE CONSTRUCTION DOCUMENTS IN THEIR ENTIRETY.
<br /> INFORMATION REGARDING COMPLETE WORK OF SPECIFIC TRADES AND SUB-TRADES IS DISPERSED THROUGHOUT THE DRAWINGS AND ISSUE BLOCK
<br /> SPECIFICATIONS AND CANNOT BE DETERMINED BY REFERENCE TO ANYTHING OTHER THAN COMPLETE SETS OF DOCUMENTS.
<br /> GENERAL DEMOLITION NOTES DETAIL INDICATOR NO. DATE DESCRIPTION
<br /> 37. NOTHING IN THESE DOCUMENTS IS TO BE INTERPRETED AS RELIEVING THE CONTRACTOR OF SOLE RESPONSIBILITY FOR THE METHODS
<br /> AND MEANS OF CONSTRUCTION, AS WELL AS SAFETY AT THE JOB SITE.
<br /> 38. THE LIFE SAFETY INSPECTOR WILL MAKE FINAL DETERMINATION OF FIRE LANES BEFORE FINAL INSPECTION IS MADE. SEE SITE PLAN FOR
<br /> REQUIREMENTS.
<br /> 1. THE GENERAL CONTRACTOR SHALL COORDINATE ALL 7. GENERAL CONTRACTOR TO CONFER WITH OWNER 12. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL DETAIL NAME39. INSTALL ALL PENETRATIONS PER SECTION 714 IN THE 2019 CALIFORNIA BUILDING CODE.
<br /> N CONSTRUCTION ACTIVITIES WITH THE OWNER OR REGARDING ANY DEMOLITION NOTED AND/OR REQUIRED ENGINEERING REQUIRED FOR TEMPORARY SHORING � 40. COORDINATE WITH THE FIRE CODE OFFICIAL FOR KEY BOXES PER SECTION 506 IN THE 2019 CALIFORNIA FIRE CODE.
<br /> `j OWNER'S REPRESENTATIVE. NOTICE SHALL BE BEYOND THE WORK PERIMETER PRIOR TO THE START REQUIRED AT ALL LOCATIONS WHERE LOAD BEARING SCALE 41. THE FIRE DEPARTMENT ACCESS AND WATER SUPPLY SHALL BE CONSTRUCTED AND MAINTAINED PRIOR TO AND DURING CONSTRUCTION
<br /> J PROVIDED TO THE OWNER OF ANY INTERRUPTION OF OF REMOVAL. BUILDING COMPONENTS ARE TO BE REMOVED. PER SECTION 507 IN THE 2019 CALIFORNIA FIRE CODE.
<br /> UTILITY SERVICES. 42. COORDINATE WITH THE FIRE CODE OFFICIAL FOR WHICH OPERATIONAL PERMITS WILL BE REQUIRED TO BE OBTAINED IN COMPLIANCE WITH
<br /> 8. GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING 13. NOTES INDICATING DEMOLITION WORK ARE NOT 2019 CALIFORNIA FIRE CODE SECTION 105.6 AND 105.7.
<br /> z 2. CONTRACTOR IS TO ERECT TEMPORARY CONSTRUCTION LOCATION OF ALL EXISTING LIGHTING, HVAC CONFINED SOLELY TO THE DEMOLITION PLANS. THE 43. WASTE ACCUMULATION PROHIBITED PER SECTION 304.1 IN 2019 CALIFORNIA FIRE CODE.
<br /> LLJBARRIERS AROUND AREA OF CONSTRUCTION. EQUIPMENT, SPEAKERS, FIRE PROTECTION SYSTEMS, GENERAL CONTRACTOR SHALL REVIEW ALL THE 44. COORDINATE WITH THE FIRE MARSHAL, THE FIRE EXTINGUISHER TYPE AND LAYOUT INDICATED IN THE CONSTRUCTION DOCUMENTS FOR
<br /> CD ELECTRICAL SYSTEMS, SECURITY SYSTEMS AND OTHER CONSTRUCTION DOCUMENTS, INCLUSIVE LL SCHEDULES ACCESSIBILITY NOTES CONFIRMATION OF ANY ADDITIONAL REQUIREMENTS BY THE LOCAL JURISDICTION TO COMPLY WITH 2019 CALIFORNIA FIRE CODE SECTION
<br /> 0 3. THE GENERAL CONTRACTOR IS TO PROVIDE ADEQUATE EQUIPMENT. IF ANYTHING IS SHOWN OUT OF PLACE AND SPECIFICATIONS, TO DETERMINE FULL EXTENT OF
<br /> 06.
<br /> Q PROTECTION FOR ALL EXISTING CONSTRUCTION AND/OR NOT PRESENTED AS PREVIOUSLY DRAWN, DEMOLITION WORK. (COMPLY WITH ACCESSIBILITY CODE ON COVER SHEET) 45. FIRE ALARM & FIRE SPRINKLER PLANS SHALL BE DESIGNED & SUBMITTED BY A STATE FIRE MARSHAL APPROVED LICENSE CONTRACTOR
<br /> ELEMENTS TO REMAIN (I.E., GLASS, WALLS, CEILING CONTACT OWNER.
<br /> w ELEMENT, ETC.) WHICH ARE ADJACENT TO THE 14. ALL DEMOLITION SHALL BE CARRIED OUT IN A SAFE 1. ACCESSIBLE TABLES SHALL BEA FOR APPROVAL BY FIRE MARSHALL. ALL INSPECTIONS & WITNESS OF TESTING BY FIRE MARSHAL.
<br /> 12� CONSTRUCTION AREAS. 9. REMOVE ALL ABANDONED PIPING, WIRING, EQUIPMENT, MANNER AND IN STRICT ACCORDANCE WITH OSHA MINIMUM OF 27" CLEAR KNEE SPACE CHECKED BY: PDB
<br /> m ETC. ENCOUNTERED DURING THE COURSE OF REGULATIONS. AFF AND HAVE A CLEAR AREA OF AT
<br /> Q DRAWN BY: NC
<br /> 4. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE CONSTRUCTION. REFERENCE M.E.P. FOR DEMOLITION LEAST 19" DEEP. TOP OF TABLE SHALL
<br /> in HANDLING AND DUMPING COSTS FOR THE REMOVAL OF PLAN. 15. WHEN UTILITIES ARE REMOVED, CAP AND SEAL A LE 34" AFF PPROTO
<br /> UMENT DATE: 09!01/20
<br /> o ALL DEMOLISHED MATERIAL, TRASH, REFUSE MINIMUM OF 8" BELOW FINISH FLOOR OR A MINIMUM
<br /> ACCUMULATED ON THE JOB SITE OF ALL 10. THE CONTRACTOR IS TO PATCH/REPAIR AND FINISH OF 6" ABOVE FINISH CEILING. 2. ALL PANIC HARDWARE SHALL BE
<br /> c>n SUBCONTRACTORS. ALL DEBRIS REMOVED DURING TO MATCH ANY EXPOSED AREAS RESULTING FROM MOUNTED NO HIGHER THAN 46" AFF TYPE: REMODELDEMOLITION SHALL BE DISPOSED IN A SAFE AND DEMOLITION. PATCH/REPAIR AND FINISH AS SHOWN IN 16. WHEN REMOVING EXISTING STRUCTURAL ITEMS, IT IS 3. ALL THRESHOLDS, FLOOR LEVELo LEGAL MANNER. PLANS OR TO MATCH ADJACENT SURFACES. REFER TO THE CONTRACTORS RESPONSIBILITY TO PROVIDE CHANGES, AND FLOOR TRANSITIONSSITE VER E CAT 0N REQU REMENTSTO CYCLE: 2020 QUARTER 1
<br /> c� 5. THE GENERAL CONTRACTOR IS RESPONSIBLE TO PATCH/R0 OWNER EPAIR NIANDSFINISH AT OSHALOLNBE CONTINUS IN IOUS TO ADEQUATE
<br /> THE SHORING,
<br /> ISTINGRSTR STRUCTURE IACING AND NTACT AND SINE AS SHALL NOT EXCEED 1/2" IN HEIGHT AND
<br /> c� ENSURE THE SPACE AND ALL SURFACES ARE CLEAN WITH EXISTING SURFACES AND SHALL NOT INDICATE A SAFE CONDITION. SHALL BE BEVELED WITH A SLOPE NO 1. DISCREPANCY WITH THE EXISTING SITE CONDITIONS AND/OR COMMENCEMENT OF CONSTRUCTION AND CLEARLY FLAG PROFESSIONAL SEAL
<br /> o UPON COMPLETION OF WORK. PATCH OR REPAIR HAS BEEN MADE. GREATER THE 1: 2. THE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF PROPERTY LINES AND SETBACKS. IT REMAINS THE
<br /> /0 17. MAINTAIN PUBLIC ACCESS TO ALL EXISTING EGRESS 4. ALL LIGHT SWITCHES, VOLUME THE ARCHITECT FOR CLARIFICATION AND INSTRUCTION. RESPONSIBILITY OF THE GENERAL CONTRACTOR TO
<br /> 6. GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING 11. MAINTAIN ACCESS TO CUSTOMER SHOWERS AND COMPONENTS, AT NO TIME SHOULD THE EGRESS CONTROLS, AND THERMOSTATS IN THESE CONSTRUCTION DOCUMENTS HAVE BEEN DESIGNED DETERMINE EXACT LOCATION OF ALL SAID BOUNDARIES.
<br /> Q) LOCATION OF ALL CONTROLS AND RELOCATING IF IN RESTROOMS DURING DURING DEMOLITION AND PROVIDED BE LESS THAN THE EGRESS REQUIRED BY
<br /> -C PUBLIC AREAS SHALL BE MOUNTED NO AND DRAWN ASSUMING EXISTING BUILDING CONDITIONS
<br /> cn CONFLICT WITH NEW WORK AND IS RESPONSIBLE FOR CONSTRUCTION. THE CURRENT CODES AND WHAT IS SHOWN ON THE MATCH THE ORIGINAL DRAWINGS. THE GENERAL 4. THE CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND
<br /> I-,
<br /> MAINTAINING PRESENT H.V.A.C. BALANCED SYSTEM. G004 LIFE SAFETY PLAN. HIGHER THAN 48" AFF UNO DEPTHS OF UNDERGROUND UTILITY SERVICES PRIOR TO
<br /> CONTRACTOR, IMMEDIATELY UPON ARRIVAL AT THE SITE,
<br /> U SHALL VERIFY ALL EXISTING STRUCTURAL COLUMN ANY EXCAVATION. J MARIAR
<br /> ACCESSIBLE TACTILE SIGNS & PLACEMENT GENERAL NOTES: 9" ON PULL SIDE DIMENSIONS, STRUCTURAL BEARING HEIGHTS, EXISTING EL
<br /> DOORWAYS LEADING TO TOILET FACILITIES MUST BE IDENTIFIED BY A 1. SIGN TO BE ADHESIVE ACRYLIC WITH RAISED CHARACTERS WITH / 4" ON PUSH SIDE DIMENSIONS, ROOFING CONDITIONS, AND JOIST BEARING 5. THE CONTRACTOR SHALL VERIFY ALL GRADES AND MMR
<br /> GEOMETRIC SYMBOL. AN EQUILATERAL TRIANGLE 1/4 INCH THICK WITH EDGES A MINIMUM HEIGHT OF 5 8" AND MAXIMUM HEIGHT OF 2" (12" MAX) ELEVATIONS PRIOR TO THE FABRICATIONS OF ANY PROPOSED FINAL GRADES. IF RAMPS, STAIRS, STOOPS, * C 440
<br /> 12 INCHES LONG AND A VERTEX POINTING UPWARD IS REQUIRED FOR MEN ACCOMPANIED BY GRADE 2 BRAILLE / WALL MOUNTED SIGNAGE TO BE,, STRUCTURAL ITEMS. IF DISCREPANCIES ARE FOUND SIDEWALKS, FLATWORK, OR PAVING ARE INSTALLED, VERIFY ao�
<br /> N 2. PICTOGRAMS SHALL HAVE THE EQUIVALENT VERBAL / TACTILE SIGN LOCATED ON LATCH SIDE OF BETWEEN WHAT IS SHOWN ON THE DRAWINGS AND EXISTING FINAL GRADES SURROUNDING THE NEW CONSTRUCTION AND
<br /> c� AND A CIRCLE 1/4 INCH THICK AND 12 INCHES IN DIAMETER IS REQUIRED FOR S-
<br /> f6�
<br /> o O DESCRIPTION LISTED DIRECTLY BELOW / (BLACK) DOOR. CLEAR OF DOOR-SWING. FIELD CONDITIONS CONTACT THE LOVE'S PROJECT ADJUST STAIR RISERS, RAMP LENGTHS, LIMITS OF PAVING,
<br /> N WOMEN. WHERE AALL-GENDER (SINGLE-USER TOILET FACILITY) IS PROVIDED MEN _ _ _ ETC., TO ACCOMMODATE THE REQUIRED RAMP SLOPE,
<br /> L 3. CHARACTERS SYMBOLS AND THEIR BACKGROUNDS SHALL HAVE CONSTRUCTION CONSTRUCTION MANAGER AND THE ARCHITECT IMMEDIATELY
<br /> 0 '� A COMBINED CIRCLE AND TRIANGLE SYMBOL IS REQUIRED. GEOMETRIC /
<br /> GLARE FINISH WITH CHARACTERS AND SYMBOLS THAT-
<br /> SYMBOLS SHALL BE CENTERED ON THE DOOR AT A HEIGHT OF 60 INCHES A NON TO DETERMINE WHAT ACTION SHOULD BE TAKEN TO MATCH RISER HEIGHTS OR PAVING AREAS. ALL RAMPS ND STAIRS
<br /> FROM THE FINISH FLOOR TO THE CENTERLINE OF SYMBOL. THE GEOMETRIC CONTRAST WITH THE BACKGROUND / 1 w to EXISTING CONDITIONS. THE BEGINNING OF STRUCTURAL SHALL MEET ADA-ADAAGS (OR ADOPTED HANDICAP
<br /> N SYMBOL SHALL CONTRAST WITH THE DOOR, EITHER LIGHT ON A DARK 4. SIGN TO BE MOUNTED ALONG THE DOOR ON LATCH SIDE, SEE / J LD w Q STEEL FABRICATION BY THE GENERAL CONTRACTOR, STEEL ACCESSIBILITY REQUIREMENTS). IF THERE IS A CONFLICT IN
<br /> DIAGRAM RIGHT, WHEN SIGN OCCURS AT DOUBLE DOORS w - 0
<br /> LLJ w BACKGROUND OR DARK ON A LIGHT BACKGROUND. / w = v 00 z FABRICATOR, OR JOIST MANUFACTURER MEANS FIELD CONDITIONS, NOTIFY LOVE'S PROJECT CONSTRUCTION
<br /> cn Q MOUNT TO THE RIGHT OF THE RIGHT-HAND DOOR. WHEN WALL Z O ¢ RAISED 1/32 = ACCEPTANCE OF THE EXISTING CONDITIONS MANAGER AND THE ARCHITECT PRIOR TO THE
<br /> v SPACE IS NOT AVAILABLE IN THE ABOVE LOCATIONS, SIGN TO BE I w w p � UPPERCASE O
<br /> GEOMETRIC SYMBOLS cn CONSTRUCTION OR ORDERING OF MATERIALS.
<br /> I c INSTALLED ON THE NEAREST ADJACENT WALL \ Q J w = LETTERING EN 2. ALL UTILITY LOCATIONS SHOWN ARE APPROXIMATE. THE
<br /> E a 5. PROVIDE 18"x18" CLEAR FLOOR AREA CENTER ON SIGN, BEYOND \ z I m Q z O
<br /> j THE ARC OF ANY DOOR SWING \ I O 0I J o 3/8" MIN. SPACING FRCM CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION OF 6. THE CONTRACTOR SHALL VERIFY THE EXISTING FINISH
<br /> 00 ......... ... ... .... .............M 6. SIGNS TO BE BLACK BACKGROUND WITH WHITE LETTERS, TYP °� N N HEIGHT OF BRRAILLE TO ANY TACTIC ALL EXISTING UTILITIES (WHETHER SHOWN OR NOT) PRIOR FLOOR ELEVATION AT ALL NEW OPENINGS OF THE EXISTING
<br /> 0 7. ALL DOOR SIGNS ARE PROVIDED AND INSTALLED BY THE z Q Q LETTERING 5/8" MIN. CHARACTER OR RAISED TO THE SUBMISSION OF BID OR THE COMMENCEMENT OF BUILDING PRIOR TO ESTABLISHING THE FINISH FLOOR SYIIIIBOLDS, ABBREVIATIONS
<br /> N CONTRACTOR. DOOR SIGNAGE SHALL COMPLY WITH CHAPTER 11B I U m � TO 2 MAX SURFACE CONSTRUCTION0 Ll- . THE CONTRACTOR SHALL NOTIFY THE ELEVATIONS. TO VERIFY FLOOR ELEVATION, THE
<br /> I _ 1 -0 1 -0 1 -0 OF THE 2019 CBC AND THE 2010 ADA STANDARDS. 1 O 0 CORRESPONDING LOVE'S PROJECT MANAGER AND THE ARCHITECT OF THE CONTRACTOR SHALL REMOVE A SMALL PORTION OF THE AND GENERAL NOTES
<br /> oN MEN WOMEN ALL-GENDER INCLUDING CHARACTER HEIGHT AND PROPORTION, BRAILED \ \ E IT I w Q Ow CONTRACTED DISCOVERY OF EXISTING UTILITIES NOT SHOWN OR NOTED WALL AT THE PROPOSED OPENING BETWEEN THE EXISTING
<br /> O (SINGLE-USER TOILET CHARACTERS, FINISH AND CONTRAST, INTERNATIONAL SYMBOL O z (GRADE 2) BRAILLE ON DRAWINGS. STORE AND THE ADDITION.
<br /> NOF ACCESSIBILITY AND MOUNTING HEIGHTS
<br /> FACILITY) �\ L J
<br /> -�, 3. THE CONTRACTOR SHALL FIELD LOCATE AND VERIFY ALL 7. REPORT ANY DISCREPANCIES FOUND IN THE FIELD SHEET:
<br /> O > PROPERTY LINES, EASEMENTS, SETBACKS AND IMMEDIATELY TO LOVE'S PROJECT MANAGER AND THE G002
<br /> a ACCESSIBLE/TACTILE
<br /> ILLUMINATED FLOOR LEVEL EXIT SIGN RESTRICTIONS. A REGISTERED SURVEYOR SHALL ESTABLISH ARCHITECT PRIOR TO MAKING AND STRUCTURAL
<br /> ACCESSIBLE TACTILE SIGNS & PLACEMENT SIGN LOCATION IN ACCORDANCE WITH CBC 1013.2 ALL PROPERTY LINES AND SETBACKS PRIOR TO THE MODIFICATIONS OR ORDERING OF ANY MATERIALS.
<br /> z
<br /> Copyright Notice:I his drawing was prepared for use on a specific site contemporaneously with
<br /> BRR Original printed on recycled paper its issue date and it is not suitable for use on a different project site or at a later time.use of this
<br /> drawing for reference o ample on another project requires the services of pronely licensed
<br /> arcNtec[s and engineerse Rep roductlon of this drawing for reuse on another project is not
<br />
|