Laserfiche WebLink
GENERAL SPECIFICATIONS SPECIFICATIONS ,Patrick C. <br /> INSTRUCTIONS TO CONTRACTOR DIVISION 1 - GENERAL REQUIREMENTS tk C-21492 <br /> 1. PERMIT AND GOVERNMENTAL BODIES: B. No substitutions shall be made without written prior approval of See's. See's Decisions 27. PROVIDE FINAL CLEAN-UP AND DAMAGE REPAIR AT THE PROJECT CONCLUSION. LEAVE THE <br /> in matters relating to artistic effect shall be final 1. THE WORK INCLUDES NEW TENANT IMPROVEMENTS IN AN EXISTING MALL SPACE, PER SQUARE PREMISES NEAT, CLEAN AND CLEAR OF TOOLS, EQUIPMENT AND SURPLUS MATERIALS, UN- JAN 3112021 <br /> Contractor and subcontractors shall obtain at their own expense, all permits and licenses LESS REQUESTED BY THE FOOT CALCULATIONS AS NOTED ON THE TITLE SHEET. CONTRACT WILL INCLUDE CONSTRUC- <br /> OWNER. CLEAN-UP SHALL INCLUDE AND NOT BE LIMITED TO: <br /> RNt <br /> and comply with all laws, ordinances, rules, regulations, orders and requirements of the 15. TEMPORARY FACILITIES: >� a. POWER VACUUMING THE ENTIRE SPACE. Date <br /> city, county, state and federal governments; and of any board & commission, or other TING WALLS AND CEILINGS PER SEES CANDIES STANDARD FINISHES, DETAILS & SPECIFICATIONS. <br /> duly authorized body, having jurisdiction which might affect or apply to the work. A. Telephone: provide telephone and communication facilities for the use of See's and SECURE AND PAY FOR GOVERNMENT FEES, LICENSES, AND PERMITS. b. HAND DUSTING AND CLEANING OF ALL SHELVING, CABINETRY, CASEWORK, GLASS AND <br /> Contractor and subcontractors must, at all times, maintain a valid Contractor's license. additional phones as required for efficient administration of work. MIRRORS BOTH INSTALLED UNDER THIS CONTRACT OR EXISTING WALLS, CEILINGS, <br /> 2. CONTRACTORS SHALL VISIT THE PREMISES WHILE BIDDING AND SHALL FAMILIARIZE THEM- FIXTURES, ETC. <br /> 2. AS-BUILT DRAWINGS: B. Water: provide temporary service and provide and pay for all water required for SELVES WITH EXISTING CONDITIONS AND THE REQUIREMENTS OF THE PROJECT PRIOR TO C. REPAIR OR REPLACEMENT OF PROPERTY DAMAGED DURING FINAL COMPLETION OF THE <br /> construction purposes; including distribution systems, meters, permits and fees. DEVELOPING THEIR BID. PROJECT. <br /> Contractor shall maintain a complete set of approved prints corrected daily to show every I hereby certify that this plan, specification, or report was <br /> change from original contract documents and marked to show exact location of all C. Electrical ower: provide electrical (temporary) service and provide and a for all MATERIAL QUANTITIES SHALL BE BASED ON ACTUAL FIELD CONDITIONS AND MEASUREMENTS. <br /> P P ( P y) P pay prepared by me or under my direct supervision and that I <br /> concealed work. Record print shall be turned over to See's upon final inspection. electrical power required for construction purpose, including temporary meters, transformers, DO NOT RELY ON SCALING PLANS FOR ACCURATE DIMENSIONING. 28. MAINTAIN AN OPERATIONAL TELEPHONE & FAX MACHINE ON THE JOBSITE AT ALL TIMES am a duly Registered Architect under the laws of the <br /> drops, distribution systems, permits and fees. THROUGHOUT THE DURATION OF THE PROJECT. CALIFORNIA <br /> 3. LABOR MATTERS: 3. PRIOR TO BEGINNING THE WORK, VERIFY ALL EXISTING DIMENSIONS AND SQUARE FOOTAGES. State of <br /> D. Toilet facilities: provide and maintain, in a manner satisfactory to See's temporary NOTIFY THE OWNER OF COMPLIANCE OR DISCREPANCIES, COMPARING THOSE DISCREPANCIES Number C21492 Date <br /> A. The contractor shall use its best efforts to prevent the occurrence of any strike, facilities and provide protection as required by building code and/or other local or state TO THE NUMBERS ON THE TITLE SHEET. <br /> slowdown or other labor difficulties, or disputes, arising from the presence of the regulation. This drawing is and will remain the property of the <br /> Contractor on the job or the activities of the Contractor. 4. CONTRACTORS SHALL TAKE CARE TO PROTECT ADJACENT AREAS FROM DUST AND DAMAGE architects and any reproduction or use for any but the <br /> Use of premises: the Contractor shall confine the use of his apparatus, the storage of his DURING THE CONSTRUCTION PROCESS, AND SHALL CLEAN UP AFTER THEMSELVES AT THE specifically agreed upon purposes, without the prior <br /> B. The Contractor shall remove, or cause to be removed, from the job any employees materials, and the operations of workmen to limits indicated by law, ordinances, permits or written consent of the architects, is strictly prohibited. <br /> who are considered unsatisfactory by See's after written notice by See's stating the directions of See's and shall not unreasonablyencumber the remises with his materials. END OF EACH WORKING DAY. <br /> reason thereof. P DIVISION 2 - DEMOLITION BUILDING ALTERATIONS Information contained in these drawings was prepared <br /> Contractor shall not load or permit any part of the structure to be loaded with weight that 5. ALL RUBBISH AND TRASH SHALL BE REMOVED FROM THE PREMISES AND PROPERLY DISPOSED / for the specific site listed below. Use of these drawings for <br /> will endanger its safety. any other location or project is strictly prohibited without <br /> 4. CONTRACTORS SUPERINTENDENCE AND SUPERVISION: OF EACH DAY. NO RUBBISH SHALL BE LEFT IN THE PREMISES AFTER WORK IS COMPLETED 1. THE WORK MAY INCLUDE DEMOLITION OF EXISTING CONSTRUCTION, REMOVAL OF VARIOUS prior written consent of the architects. <br /> A. Where work of on trade joins or overlaps another, there shall be no discrepancy when <br /> 16. BUILDING CODE COMPLIANCE: EACH DAY. ITEMS OF EQUIPMENT AND CONSTRUCTION, AND THE CUTTING OR ALTERATION OF EXISTING <br /> CONSTRUCTION AS SHOWN, NOTED OR IMPLIED ON THE DRAWINGS. CONTRACTOR SHALL DE- <br /> the shop is completed from one kind work to another. Should improper work any All work shall comply with applicable codes and trade standards, which govern each phase 6ALL DRAWINGS HEREIN CREATE AN ENTIRE PACKAGE. ALL TRADES SHALL BE RESPONSIBLE TERMINE AND INVENTORY ALL NECESSARY DEMOLITION AND ALTERATION OF ITEMS TO PRO- <br /> made good by the contractor with out expense to <br /> trade be covered by another, which results <br /> lts See's Mechanical <br /> .delays or defects the whole work shall be work. Including, but not limited to, (IBC) International Building Code International FOR REVIEWING THEIR RESPECTIVE REQUIREMENTS AND COORDINATING THEIR HIDDEN OR EX- VIDE FOR A COMPLETE INSTALLATION OF NEW WORK. ALL COSTS OF REMOVAL, REPAIR OR <br /> echanical Code (IMC), National Electrical Code (NEC), American Concrete institute code <br /> (ACI), International Plumbing Code (IPC), Tile Council of America (TCA), International Fire POSED WORK WITH OTHER RELATED TRADES. DISTRIBUTION OF THE APPLICABLE DOCUMENTATION REPLACEMENT SHALL BE INCLUDED IN THE BID. ADDITIONAL COSTS FOR DEMOLITION OF ITEMS <br /> B. The Contractor shall provide a qualified full-time superintendent. The superintendent TO THE VARIOUS TRADES IS THE RESPONSIBILITY OF THE BIDDER/ GENERAL CONTRACTOR. HIDDEN OR INACCESSIBLE DURING THE BIDDING PHASE, SHALL BE SUBMITTED FOR APPROVAL <br /> govern as minimum specifications unless noted or specified <br /> shall be on site to insure proper adherence to the project. See's shall be the sole judge Code (IFC), and all applicable state and local codes and/or otherwise.legislation. The codes shall PRIOR TO BEGINNING THE WORK. <br /> of superintendent's qualifications. <br /> 17. DETAIL DRAWINGS AND INSTRUCTIONS: 7. COORDINATE ALL WORK OF THE VARIOUS TRADES AND SUBCONTRACTORS TO ASSURE EFFI- 2. AT ALTERED CONSTRUCTION, REPAIR CUT EDGES, REPLACE CONSTRUCTION, AND FIT NEW TO <br /> C. Protect all work, materials, and equipment from damage form any cause what so ever, CIENT AND ORDERLY INSTALLATION. PROVIDE ACCOMMODATION FOR ITEMS INSTALLED AT A EXISTING CONSTRUCTION TO MATCH EXISTING WORK. MAKE JOINTS OF NEW AND EXISTING <br /> and provide adequate and proper storage facilities during progress of the work for See's A. If work is requited in a manner that make it impossible to produce first class work, or <br /> provided materials. should discrepancies appear among contractual documents, request interpretation from LATER DATE. VERIFY THAT CHARACTERISTICS OF ELEMENTS OF INTERRELATED OPERATING PATCHES VERY SMOOTH, EVEN AND PRACTICALLY INVISIBLE. COORDINATE ALL REPLACEMENT <br /> See's before proceeding with work. If Contractor fails to make such a request, no excuse EQUIPMENT ARE COMPATIBLE; COORDINATE WORK OF VARIOUS SECTIONS WHICH HAVE INTERDE- AND REPAIR REQUIREMENTS WITH LANDLORDS CONSTRUCTION CRITERIA AND SEES CANDIES CO- MBA PROJECT MANAGEMENT, LLC <br /> D. The various materials, work equipment and finishes provided by the several trades are PENDANT RESPONSIBILITIES FOR INSTALLING, CONNECTING TO, AND PLACING IN SERVICE, SUCH ORDINATOR. <br /> all to be protected from other operations of work, such that all items are in perfect will thereafter be entertained for failure to carry out work in a satisfactory manner. <br /> P P P EQUIPMENT. COORDINATE SPACE REQUIREMENTS AND INSTALLATION OF MECHANICAL AND N5560 CTH ZM, SUITE 3 <br /> condition at the time the project is turned over to Sees. Marring or damaging same will B. Should conflict occur in or between drawings or specifications, contractor is deemed to ELECTRICAL WORK AND FIRE SPRINKLER SYSTEM WHICH ARE INDICATED, DETAILED, OR IMPLIED 3. SAW-CUT CONCRETE WITH DIAMOND SAW; JACK HAMMERING WILL NOT BE PERMITTED EXCEPT <br /> not be permitted. The final responsibility for this protection rests with the general have estimated on more expensive ways of doing work, unless he shall have asked for DIAGRAMATICALLY ON DRAWINGS. WITH THE EXPRESSED WRITTEN APPROVAL OF THE LANDLORD. CUT IN ACCURATELY LOCATED, Onalaska, WI. 54650 <br /> contractor, even though various sections of the specifications may contain specific and obtained written decision before submission of proposal as to which method or STRAIGHT LINES, AND BREAK OUT SECTIONS. FLOOR MAY BE CORE DRILLED WHERE APPROP- <br /> comments or precautions about protection. materials will be required. 608-785-2760 CELL: 507-458-8034 <br /> 8. UNLESS SPECIFICALLY NOTED, PROVIDE AND PAY FOR LABOR, MATERIALS AND EQUIPMENT, IATE FOR INSTALLATION OF PIPES AND SIMILAR ITEMS. COORDINATE ALL CORE LOCATIONS E-mail: mba m.tim@ mail.com <br /> 5. AUTHORITIES: 18. MANUFACTURER'S DIRECTIONS: TOOLS, CONSTRUCTION EQUIPMENT AND MACHINERY, AND OTHER FACILITIES AND SERVICES AND SLAB MODIFICATIONS WITH LANDLORD'S STRUCTURAL ENGINEER. WHERE EXISTING PIPING P 9 <br /> Manufactured articles, materials, equipment shall be applied, installed, connected, erected, NECESSARY FOR PROPER EXECUTION AND COMPLETION OF WORK, INCLUDING PERMITS. AND OTHER SIMILAR ITEMS ARE UNDER EXISTING SLABS, EXERCISE CARE TO PROTECT FROM <br /> No changes in work ordered by authorities having jurisdiction over project shall be made used, cleaned, conditioned as per manufacturer's printed directions unless specified UTILITIES SHALL BE PROVIDED BY OWNER. DAMAGE. EXERCISE CARE WHEN CUTTING ADJACENT TO EXISTING WALLS TO AVOID DAMAGE <br /> without the prior written approval of See's except in emergency involving hazards to otherwise. TO WALLS. IF DAMAGED, REPAIR AS REQUIRED TO ORIGINAL CONDITION. <br /> persons or property. 9. GENERAL CONTRACTOR SHALL PURCHASE AND MAINTAIN INSURANCE COVERAGE IN ACCOR- <br /> 6. LAYOUT AND RESPONSIBILITY: 19. CONNECTIONS DANCE WITH THE REQUIREMENTS OF THE LANDLORD AND THE OWNER. VERIFY AND COOR- 4. DOORS & FRAMES: IF DOORS AND FRAMES ARE TO BE REUSED ON THE WORK, CAREFULLY <br /> All attachments, connections, or fastenings of any nature are to be properly and DINATE WITH THE OWNER'S PROJECT MANAGER, ANY ADDITIONAL REQUIREMENTS. REMOVE DOOR FROM FRAMES AND REMOVE FRAMES FROM OPENING, TAKING CARE TO AVOID <br /> A. Contractor shall be responsible for proper locations and elevations of the work. An permanently secured in conformance with best practice. Contractor is responsible for <br /> P P P Y providing them according to these conditions. Drawings show only special requirements to DAMAGE. REMOVE HARDWARE, CLEAN, REFURBISH, AND STORE FOR REINSTALLATION WHERE <br /> inconsistencies in plan data shall be brought to the attention of See's prior to the assist Contractor; they do not illustrate every such detail. 10. FURNISH ALL REQUIRED TEMPORARY FACILITIES AND ALL TEMPORARY UTILITIES IMMEDIATELY INDICATED. FOR DOORS AND FRAMES TO BE SALVAGED, CAREFULLY REMOVE FROM OPENING <br /> commencing of work. AFTER RECEIPT OF NOTICE TO PROCEED FOR USE IN CONVENIENCE OF ALL THOSE ENGAGED AND DELIVER FOR STORAGE WHERE INDICATED. CLIENTS <br /> B. Contractor shall be responsible for layout of work and establishing grades, lines and A. All workmanship shall meet the highest accepted industry standards and shall comply <br /> levels of work for all subcontractors. 20. WORKMANSHIP IN THE PROJECT WORK. STORE NUMBER SF-94 <br /> lewith all applicable regulations and codes. 5. PREVENT MOVEMENT OR SETTLEMENT OF STRUCTURE. PROVIDE AND PLACE BRACING AND <br /> B. Coordinate and cooperate in every way with all other trades in order to avoid 11. ALL CONTRACTORS MUST STAY BEHIND THE BARRIERS AND MAINTAIN ACCESS TO SUCH AREAS SHORING AND BE RESPONSIBLE FOR SAFETY AND SUPPORT OF STRUCTURE, AS DETERMINED <br /> 7. SEE'S DECISION: interference and assure a satisfactory job. CLEAN AND FREE OF CONSTRUCTION MATERIALS AND DEBRIS. FAILURE TO MAINTAIN CLEAN BY G.C. ENLISTED STRUCTURAL ENGINEER. ASSUME LIABILITY FOR SUCH MOVEMENT, SETTLEMENT , <br /> Should any dispute arise respecting true construction and meaning of drawings or 21. USE OF DRAWINGS: <br /> STOREFRONT WILL RESULT IN BUILDING MANAGEMENT HAVING SUCH MATERIALS AND DEBRIS DAMAGE OR INJURY. SEE S CANDIES <br /> REMOVED AND ALL CHARGES FOR MAINTENANCE WILL BE BILLED TO GENERAL CONTRACTOR. <br /> specifications, it shall be decided by See's whose decision shall be final. These drawings may not specifically detail or specify materials and/or manufactures. The 6. ARRANGE AND PAY FOR DISCONNECTING, REMOVING AND CAPPING UTILITY SERVICES WITHIN 2164 DANIELS STREET <br /> Contractor shall provide all samples and/or cut sheets as required, to assist the Owner or 12. COORDINATE ALL CONSTRUCTION & SCHEDULING WITH THE BUILDING MANAGER REVIEWING ALL AREAS AFFECTED BY DEMOLITION. PLACE MARKERS TO INDICATE LOCATION OF DISCONNECTED <br /> 8. GUARANTEE - WARRANTY: his agent in making material selections. For the purpose of estimating, the Contractor shall <br /> use the materials selected by the Owner, or in absence of some, he shall provide an SCHEDULED ACTIVITIES AT OUTSET OF CONSTRUCTION: SERVICES. LOCATE SPRINKLER SHUT-OFF VALVE AND SMOKE ALARM PRIOR TO COMMENCING WORK; <br /> A. In case of work performed by subcontractors and where guarantees are required, allowance amount and so condition any cost estimate. All materials specified in these COORDINATE REQUIRED MODIFICATION WITH LANDLORD. <br /> secure warranties from said subcontractors addressed to and in favor of Sees. Deliver drawings shall be included in such estimates. The Owner shall not be held responsible for 13. ALLOWABLE TOLERANCES - UNLESS OTHERWISE NOTED OR INDICATED, THE FOLLOWING TOLER- <br /> copies of same to See's upon completion of work. Contractor and all subcontractors and any detailing or installations not shown on these drawings. ANCES SHALL APPLY TO ALL WORK: 7. CAREFULLY REMOVE MATERIALS AND EQUIPMENT WHICH ARE INTENDED TO BE REUSED. STORE <br /> manufacturers shall guarantee workmanship and materials and equipment to be free of a. ALL VERTICAL SURFACES SHALL BE PLUMB OR CONSTRUCTED TO THE EXACT SLOPES OR IN A SECURE LOCATION. REMOVE DEBRIS, REFUSE AND MATERIALS BEING DEMOLISHED IM- <br /> defects for a period of not less that one year from date of See's final acceptance. 22. INSURANCE: ANGLES INDICATED. MEDIATELY FROM THE SITE. <br /> A. General Contractor shall secure minimum coverage and limits of liability as required by <br /> B. Should any trouble develop during this period due to defective materials and/or "See's Candies, Inc." or as may be required by the Landlord. b. THE MAXIMUM DEVIATION FROM THE TRUE PLANE FOR VERTICAL AND HORIZONTAL <br /> faulty workmanship, the Contractor shall furnish all necessary labor and materials to B. The Contractor, prior to commencing work shall furnish See's Candies with a "Standard SURFACES SHALL NOT BE GREATER THAN 1/8" IN 10'-0" AS MEASURED BY A 8. ERECT AND MAINTAIN WEATHERPROOF AND DUSTPROOF CLOSURES AND PARTITIONS TO PRE- <br /> VENT WEATHER DAMAGE OR SPREAD OF DUST, FUMES AND SMOKE TO OTHER PARTS OF THE MANTECA, CA 95336 <br /> correct the trouble at no additional cost to See's. Certificate of Insurance" stating that the Contractor has the following minimum policies in STRAIGHT EDGE PLACED ANYWHERE ON THE SURFACE. BUILDING, IN ACCORDANCE WITH MALL GUIDELINES AND STIPULATIONS. <br /> effect for all work on this project. (Unless higher coverage's are required). c. ALL HORIZONTAL SURFACES SHALL BE LEVEL OR CONSTRUCTED TO THE EXACT ANGLE <br /> 9. CHANGE ORDERS: 1) Worker Compensation Insurance $1,000,000.00 INDICATED OR INTENTED. 9. PERFORM DEMOLITION IN ACCORDANCE WITH APPLICABLE AUTHORITIES HAVING JURISDICTION. 9 <br /> 2) Comprehensive General Liability $1,000,000.00 including contractual Liability. See's d. WALL AND SOFFIT INTERSECTIONS SHALL BE 900 OR THE EXACT ANGLE INDICATED OR <br /> Change from drawings ro specifications and corresponding costs increases shall only be candies, Inc. and See's Candy Shops Inc. "named as additional insured, (form CG20101185B INTENDEED. oss made upon written approval of a See s representative. 10. REPAIR ALL DEMOLITION IN EXCESS OF THAT REQUIRED AT NO COST TO THE OWNER. <br /> or equivalent). e. ALL CORNERS AND EDGES SHALL BE STRAIGHT AND TRUE WITHOUT DENTS, WAVES <br /> 10. TENANT SPACE INFORMATION: 3) Motor Vehicle Liability $1,000,000.00 OR BULGES OR OTHER BLEMISHES. <br /> C. Receipt by See's of this certificate does not constitute acceptance. Approval of f. ALL JOINTS SHALL BE TIGHT, STRAIGHT, EVEN AND SMOOTH. 11. REMOVE FROM SITE CONTAMINATED, VERMIN INFESTED OR DANGEROUS MATERIALS ENCOUNTERED; CAH <br /> 0A. All information pertaining to the tenant space shall be and shall remain the owner's adequacy of coverage will be verified by See's Candies. g. ALL OPERABLE ITEMS SHALL OPERATE SMOOTHLY WITHOUT STICKING OR BINDING DISPOSE OF BY SAFE MEANS TO PROTECT HEALTH OF WORKERS AND PUBLIC. D � E 8 <br /> responsibility. This information includes all tenant package information and related data. AND WITHOUT EXCESSIVE "PLAY" OR LOOSENESS. <br /> These documents have been prepared on the information available and, should additional 23. POST-BID INFORMATION: <br /> P P A. Upon execution of the contract the successful bidder shall within three 3 workingDIVISION 3 - CONCRETE REPAIR & REPLACEMENT <br /> services or work be required due to the lack of such information, that work shall be P ( ) 14. NOT USED 3423 S LA. CIENEGA BLVD. <br /> considered as "additional services" over and above all prevailing contracts. days thereafter, submit the following. <br /> 1) Cuts and/or samples of any or all items, materials or samples requiring Owner's 1. WORK INCLUDES PATCHED, DEMOLISHED SLAB AND CERAMIC TILE, IF ANY; FILLING AND LOS ANGELES, CA 90016 <br /> B. The contractor shall carefully examine the site and shall thoroughly familiarize himself approval that are not reflected in documents. 15. THE OWNER OR THE OWNER'S SUBCONTRACTORS MAY OCCUPY PORTIONS OF THE PROJECT LEVELING JOINTS AND CRACKS; AND FILLING ABANDONED ELECTRICAL BOXES AND ANY PH: 310/287-4616 <br /> with all existing conditions within the scope of this work. By act of submitting a bid, the 2) Complete list of all subcontractors, materials suppliers and vendors to be utilized, and DURING THE FINAL STAGE OF CONSTRUCTION. COORDINATE AND COOPERATE WITH THE OWNER HOLES GREATER THAN 1/2". FAX: 310/842-4436 <br /> Contractor is deemed to have made such examination and examined all mechanical, notice of said contract. TO MINIMIZE CONFLICT AND FACILITATE THE OWNER'S OPERATION. / <br /> architectural, structural, and electrical drawings, and to have accepted such conditions and 2. USE RAECO-LITH "R-35" AS UNDERLAYMENT FOR PATCHING OR APPROVED EQUAL. MIX <br /> to have mad allowances thereof in preparing his bid. No extra charges will be considered 24. PROGRESS SCHEDULE AND REPORTS: SHALL BE TWO PARTS - MORTAR MIX AND LATEX BINDER. MIX AND INSTALL PER MANU- <br /> for costs resulting from failure to comply with the above. A. General: Within 4 days of date established for "commencement of work" submit a 16. ALL DIMENSIONS AND FINISHES SHALL BE VERIFIED AND COORDINATED WITH EXISTING CON- SEES CONTACT <br /> revised bar chart type progress schedule indicating a time bar for each significant category DITIONS PRIOR TO CONSTRUCTION, FABRICATION, OR PURCHASING. IN CASE OF CONFLICT BE- FACTURER'S LATEST WRITTEN AND RECOMMENDED DIRECTIONS. RICHARD ESCALANTE <br /> 11. CONSTRUCTION METHODS: or unit of work to be performed at the site. Arrange schedule to indicate required TWEEN THE PROJECT REQUIREMENTS AND/OR EXISTING CONDITIONS, THE ONE HAVING THE <br /> sequencing of units, and to show time allowance for submittals, inspections, major MOST STRINGENT REQUIREMENTS SHALL GOVERN, AS APPROVED BY THE OWNER. DIVISION 4 - NOT USED 310/ 287-4616 <br /> In no case, shall See's or See's architects, be responsible for construction means, elements which involve purchase lead-time, fabrication, and similar time margins. A <br /> methods, techniques, sequences or procedures of for safety precautions and programs in definitive job construction schedule showing key dates for coordination with Owner-supplied Tim R. Benson <br /> connection with the work, nor shall See's or See's architect be responsible for contractor's services and/or materials. 17. PERFORM ALL WORK IN ACCORDANCE WITH ACCEPTABLE TRADE PRACTICE TO INSURE THE DIVISION 5 - METAL FABRICATIONS <br /> failure to employ proper safety procedures. See's Candies insists on safety on the job site. B. Submittal: Following initial revision of schedule after review by See's Candies, print and HIGHEST QUALITY FINISHED PRODUCT - EXPRESSED OR IMPLIED. PERFORM ALL WORK BY SKIL- ARCHITECTS PROJECT MANAGER <br /> distribute revised schedule as needed. LED MECHANICS IN ACCORDANCE WITH ESTABLISHED STANDARDS OF WORKMANSHIP IN EACH 1. PROVIDE ALL MISCELLANEOUS METAL ITEMS INCLUDING MATERIALS, FABRICATIONS, FASTEN- 608/ 785-2760 <br /> 25. REQUEST FOR PAYMENT/SCHEDULE OF VALUES: <br /> 12. DUST CONTROL: OF THE VARIOUS TRADES. INGS, AND ACCESSORIES REQUIRED FOR FINISHED INSTALLATION AS INDICATED AND SPEC- <br /> o <br /> . , , <br /> The Work includes dust control as required to abate any dust nuisance on and about the A. Use Form AIA G-702 and G-703, fully completed and executed, submitted in duplicate 18COORDINATE BLOCKING REQUIREMENTS WITH ADJACENT OR RELATED TRADESACCESSORIESIFIED. -2 <br /> site, which is the result of construction activities. including attachment of waivers, and similar documentation with one copy. L � o <br /> B. Prior to initial request, submit: EQUIPMENT & FIXTURES INSTALL REQUIRED BLOCKING AT NO ADDITIONAL COST TO THE OWNER. 2 •- L_ o <br /> q 2. STEEL SHALL BE ASTM A366 AMERICAN OPEN HEARTH SHEET STEEL, FREE FROM SCALE <br /> 13. CLEANING: 1) List of subcontractors, suppliers and vendors. AND PITTING AND OTHER DEFECTS AFFECTING APPEARANCE. a) , L_ C:2) Progress schedule 19. REPAIR PROPERTY DAMAGE BY THE INSTALLERS TO A LIKE NEW CONDITION OR REPLACE date -0- -2 Q ° > comments <br /> A. The contractor shall at all times during the course of this contract keep the building, 3) Copies of building permits and similar start-up authorization or certificates. DAMAGED SURFACES AND MATERIALS OF THE PREVIOUSLY INSTALLED WORK BY OTHER <br /> See's premises and the adjoining premises, including streets and other area assigned to 4) Evidence of insurance coverage. TRADES, INSTALLERS AND SUBCONTRACTORS. 3. TUBING SHALL CONFORM TO REQUIREMENTS OF ASTM A500 OR A501 AS APPROVED. AS 07/03/20 O <br /> the Contractor, free from accumulation of waste materials and other rubbish caused by Note Items 1, & 4 shall be completed prior to start-up. BUILT <br /> his employees or work by the employees of subcontractors. 20. WHERE REQUESTED BY THE OWNER TO CERTIFY CONFORMANCE TO TRADE STANDARDS OR THE 4. WHERE METAL ITEMS ARE TO BE ERECTED AND IN CONTACT WITH DISSIMILAR MATERIALS, PRELIM <br /> 26. OWNERSHIP OF DRAWINGS: PROJECT REQUIREMENTS, THE CONTRACTOR SHALL ENLIST A TESTING LABORATORY AT THE PROVIDE CONTACT SURFACES WITH COATING OF AN IMPROVED ZINC CHROMATE PRIMER IN REVIEW 08/03/20 00 <br /> B. At completion of the work, or prior thereto if so directed, the contractor shall These drawings are the property of See's Candies. They shall not be reproduced without OWNER'S COST. IF THE REQUESTED TEST SHOWS NON-CONFORMANCE TO GENERALLY ACCEPTED MANNER TO OBTAIN NOT LESS THAN 1.0 MIL DRY FILM THICKNESS. <br /> remove from the building and/or premises all of his tools, appliances, surplus materials, BID/ <br /> the express written permission of the Owner. These drawings are to be used for this TRADE STANDARDS OR THE PROJECT REQUIREMENTS, THE CONTRACTOR SHALL CORRECT THE DE- 08/10/20 00000 <br /> debris, temporary structures, temporary construction for which he has been responsible specific project, and are not to be re-used in whole or in part for another project. The 5. SHEET STEEL SHALL CONFORM TO REQUIREMENTS OF ASTM A606. PERMIT <br /> and/or rubbish, and shall be responsible for clean-up of his work. Cleaning, polishing, Architect and See's Candies assumes no liability for unauthorized use or reproduction of FICIENCY AT NO ADDITIONAL COSTS TO THE OWNER AND REIMBURSE ALL THE COSTS OF THE <br /> sealing, waxing and all other such finish work noted on the drawings or required in the these documents. TESTING TO THE OWNER, UNLESS THE CONTRACTOR HAS USED PRODUCTS INCORRECTLY LABELED <br /> specifications shall be taken to indicate the required condition at the time of acceptance BY THE MANUFACTURER OR HAS MADE PREVIOUSLY APPROVED CHANGES. 6. CARBON STEEL BARS SHALL CONFORM TO REQUIREMENTS OF ASTM A321. <br /> of the work under the contract. At the completion of work, the Contractor shall sweep 27. LANDLORD'S APPROVAL: <br /> and clean thoroughly, shall clean all glass, removing all paint, stains, etc. without The Contractor shall be responsible for meeting all conditions for approval by Landlord 21. PROVIDE SECURITY OF THE WORK, INCLUDING TOOLS AND UNINSTALLED MATERIALS. PROTECT 7. ALUMINUM EXTRUSIONS SHALL CONFORM TO ASTM B221. REVEALS TO BE BLACK ANODIZED <br /> scratching or injuring the glass and shall leave the work bright, clean and polished; the including: insurance; approval for work; use of Landlord's subcontractors for specific areas THE WORK, STORED PRODUCTS, CONSTRUCTION EQUIPMENT AND OWNER'S PROPERTY FROM FINISH. <br /> work and plumbing fixtures shall be washed clean; all hardware and unpainted metals shall 9� PP P <br /> be cleaned and polished; all equipment and paint work shall be cleaned and touched-up, of work, etc. See's shall have copies of these requirements for Contractor review. THEFT AND VANDALISM AND THE PREMISES FROM ENTRY BY UNAUTHORIZED PERSONNEL <br /> if necessary, and all temporary labels, tags and paper coverings shall be removed; clean UNTIL FINAL ACCEPTANCE BY OWNER. 8. FASTENERS SHALL BE AS REQUIRED FOR ASSEMBLY AND INSTALLATION OF FABRICATED <br /> or replace filters of mechanical systems, sanitize plumbing/food service facilities, clean 28. SHOP DRAWINGS AND/OR MATERIAL SAMPLE SUBMITTALS: ITEMS. <br /> light fixtures and replace burned-out/dimmed lamps; all to the approval of See's. Finally, The Contractor shall submit two copies of shop drawings for See's Candies review. See's 22. MAINTAIN ACTIVE FIRE EXTINGUISHERS AT THE PROJECT AS REQUIRED. <br /> the exterior of the building and immediate surrounding area shall be similarly clean and in Candies will review these documents for conformance with design intent only. See's 9. BOLTS SHALL BE LOW CARBON STEEL EXTERNALLY AND INTERNALLY THREADED FASTENERS drawn by: checked by: <br /> good order at the time of final acceptance of the building, with paint fresh, coatings Candies shall not be responsible for construction methods, quantity take offs, dimensions, 23. DO NOT USE MATERIAL OR EQUIPMENT FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT CONFORMING WITH REQUIREMENTS OF ASTM A307; INCLUDE NECESSARY NUTS AND PLAIN <br /> unbroken, and hardware clean and polished. etc. The Contractor shall be responsible for submitting requested items in sufficient time FOR MEMBERS FOR SUPPORT OF STRUCTURAL MEMBERS OR CONNEC- <br /> for See's Candies review. IS SPECIFICALLY DESIGNED OR SPECIFIED. ALL MATERIALS AND EQUIPMENT THAT ARE SIMILAR HARDENED WASHERS. TRB TRB <br /> C. If the Contractor, upon request by See's does not attend to such cleanings with SHALL BE THE SAME TYPE, MODEL, AND STYLE FOR THE SAME USE THROUGHOUT THE PRO- TION THERETO, USE FASTENERS CONFORMING WITH ASTM A325. FOR STAINLESS STEEL AND <br /> reasonable promptness, See's may cause such cleaning to be done by others and charge 29. FINAL PAYMENT/PROJECT CLOSEOUT: JECT OR THEY SHALL BE REJECTED. NONFERROUS ITEMS, USE TYPE 302 AND 304 STAINLESS STEEL FASTENERS. THIS SHEET CONTAINS: <br /> costs of same to Contractor, or deduct the said cleaning from payments still due the A. See's will approve final payment when the following conditions are met. <br /> Contractor under the contract. 1) Obtain permits, certificates of inspection and other approvals and releases by 24. WHEN THE PROJECT REQUIREMENTS REQUIRE THAT THE INSTALLATION OF WORK SHALL COMPLY 10. MISCELLANEOUS MATERIALS: PROVIDE ALL INCIDENTAL ACCESSORY MATERIALS, TOOLS, SPECIFICATIONS <br /> governing authorities, required for Owner's occupancy and use of project. WITH MANUFACTURER'S INSTRUCTIONS, PERFORM THE WORK IN STRICT ACCORDANCE WITH THE METHODS, AND EQUIPMENT REQUIRED FOR FABRICATION AND INSTALLATION OF MISCELLAN- <br /> D. Cleaning Agents, implements, waxes, polish and methods used for cleaning, polishing 2) Submit warranties and similar documents. MOST CURRENT WRITTEN MANUFACTURER'S INSTRUCTIONS. EOUS METAL ITEMS AS INDICATED ON DRAWINGS. <br /> or sealing of any surface shall be products recommended and approved by the 3) Submit maintenance manuals. <br /> manufacturer of the item or surface to be cleaned. The Contractor shall be fully 4) Submit proof of payment of fees, taxes, and similar obligations. 11. VERIFY DIMENSIONS PRIOR TO FABRICATION OR CASTING. FORM METAL ITEMS TO ACCURATE <br /> responsible for any damage to any surface or substrate caused by the improper use of 25. ALL PRODUCTS AND EQUIPMENT SHALL BE DELIVERED IN UNDAMAGED CONDITION AND STORED SIZES AND CONFIGURATIONS AS INDICATED ON DRAWINGS AND OTHERWISE REQUIRED FOR <br /> cleaning materials. 5) Transfer, operational, access, security and similar obligations. IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS TO AVOID DISRUPTION OF THE WORK <br /> 6) Unconditional lien releases from all subcontractors and suppliers. PROPER INSTALLATION; FABRICATE WITH ALL LINES STRAIGHT AND ANGLES SHARP, CLEAN AND <br /> 14. SUBSTITUTIONS 7) Approval of all "Punch List" items and final cleaning of premise. OR DAMAGE TO THE ITEMS. REPLACE DAMAGED OR UNFIT MATERIALS, AT NO COST TO THE TRUE; DRILL, COUNTERSINK, TAP, AND OTHERWISE PREPARE ITEMS FOR CONNECTION WITH <br /> OWNER. WORK OF OTHER TRADES. MAKE PERMANENT CONNECTIONS BY WELDING AND <br /> A. When material is specified by proprietary brand name or manufacturer, any material GRIND ALL EXPOSED WELDS SMOOTH TO MATCH ADJACENT SURFACES; ROUGH JOINT SUR- <br /> which will perform adequately the duties required by the general design will be considered 26. NOTIFY THE OWNER WHEN THE WORK IS SUBSTANTIALLY COMPLETE AND READY FOR IN- FACES NOT PERMITTED. AVOID USING BOLTS AND SCREWS UNLESS SPECIFICALLY INDICATED <br /> equal and satisfactory, providing the material so proposed is of equal quality, in the SPECTION. UPON INSPECTION, PROVIDE WRITTEN OPERATION AND MAINTENANCE INSTRUCTIONS OR APPROVED; WHEN USED, DRAW UP TIGHT AND TIE THREADS TO PREVENT LOOSENING. <br /> opinion of See's. Substitutions shall be submitted in writing, including sample, AND GUARANTEES FOR ALL EQUIPMENT AND MATERIALS INSTALLED. PROVIDE WRITTEN GUAR- <br /> specifications, test reports and data as required by See's. ANTEES FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE OF THE 12. ALL FERROUS METAL ITEMS SHALL BE SHOP FINISHED. TOUCH-UP OR REPAIR DAMAGED <br /> WORK. AREAS PRIOR TO INSTALLATION WITH SAME MATERIAL. <br /> 13. PROVIDE CONTACT SURFACES WITH CONCRETE MASONRY OR OTHER DISSIMILAR MATERIALS <br /> WITH A MINIMUM ONE POINT ZERO (1.0) MIL DRY THICKNESS OF AN APPROVED ZINC CHRO- <br /> MATE PRIMER. <br /> 14. PROVIDE ALL STEEL BLOCKING AND BRACING IN METAL STUD FRAMED PARTITIONS NECESSARY <br /> FOR A COMPLETE INSTALLATION. INCLUDE AS REQUIRED FOR SUPPORT OF ALL WALL-MOUNTED <br /> EQUIPMENT AND FABRICATIONS AS INDICATED ON DRAWINGS. PROVIDE SUPPORTS AT JAMBS <br /> OF DOORS AND ELSEWHERE, AS REQUIRED. <br /> 15. FABRICATE ALL MISCELLANEOUS FRAMING AND BRACING ITEMS TO DETAIL OF STRUCTURAL <br /> SHAPES, PLATES, AND BARS; WELD JOINTS WHERE PRACTICAL; PROVIDE BOLTS AND <br /> OTHER CONNECTION DEVICES REQUIRED. INCLUDE ANCHORAGE'S, CLIP ANGLES, SLEEVES, <br /> ARCHITECT'S COMMISSION NUMBER <br /> 20 - 1 0 10 . 008 <br />