Laserfiche WebLink
MEMORANDUM Page 4 of 7 <br /> Holly Trading ® S I E G F R I E D <br /> Tracy,, CA CA <br /> lines, the pipes will drop 2" to the edge of the leach field. At the edge of the leach field, the 4" PVC <br /> tight lines will be connected to perforated leach lines. All perforated leach lines will lay flat and have <br /> a 4"diameter. <br /> Laterals for Each Filter Bed: 4" PVC perforated lines with inspection parts. Pipes will either be 70 <br /> feet long and placed at 12 feet on-center across 120 linear feet, or 45 feet long and placed at 12 <br /> feet on-center across 144 linear feet. <br /> VI. Nitrate Loading Study & Soil Suitability Study: <br /> The Nitrate Loading and Soil Suitability Study performed by Chesney Consulting in 2019 can be found in <br /> Appendix A. <br /> VII. Soil and Groundwater Testing: <br /> The Soil and Groundwater Testing performed by Chesney Consulting in 2019 can be found in Appendix B. <br /> Stockton San Jose Sacramento Modesto <br /> 3428 Brookside Rd. 111 N. Market St.,#300 900 Howe Ave,#200 100 Sycamore Ave,#100 <br /> Stockton, CA 95219 San Jose, CA 95113 Sacramento, CA 95825 Modesto, CA 95354 <br /> t:209.943.2021 t:408.754.2021 t:916.520.2777 t:209.762.3580 <br /> F:\17projects\17017 Holly Sugar Industrial\Civil\Septic Sizing-Prelim\17017 E&E Sanitary Sewer Design Criteria Memo Rev 3.docx <br />