My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0082950
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SUGAR
>
9375
>
4200/4300 - Liquid Waste/Water Well Permits
>
SR0082950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/24/2020 2:50:30 PM
Creation date
12/3/2020 2:22:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
SR0082950
PE
4201
STREET_NUMBER
9375
Direction
N
STREET_NAME
SUGAR
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21216017
ENTERED_DATE
12/2/2020 12:00:00 AM
SITE_LOCATION
9375 N SUGAR RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\fgarciaruiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Account for the small amount of deep percolation (rainfall-ET)through pervious areas of <br /> the site as the onsite portion of the total annual recharge (call it RI). <br /> b) For average year conditions (monthly time steps), estimate the amount (or percentage) of <br /> building site runoff entering the basin that is expected to drain via percolation, as <br /> opposed to being discharged to the regional storm drain system. If the basin is designed <br /> for full retention/percolation of normal year rainfall-runoff, with off-site discharge only <br /> during peak storms, it may be possible to consider all building site runoff as available for <br /> percolation. <br /> c) Estimate the direct rainfall volume (acre-feet) into the basin as part of the water available <br /> for percolation. Since it appears the retention basin capacity is planned to be shared with <br /> another development site (Buildings A&B), include only the portion of direct rainfall <br /> approximating the percentage of the basin allocated for the projec,. <br /> d) Combine the estimated monthly recharge volumes from (b) and (c), and subtract the <br /> average amount of water lost to evapotranspiration(ET) from the surface of the retention <br /> basin (monthly). For the a shared retention facility, adjust (i.e., reduce) the ET losses <br /> consistent with the percentage of the basin allocated for the project. <br /> e) The sum of(b) + (c) - (d) would give an estimate of the net monthly off-site retention <br /> basin recharge volumes, and the annual total (call it R2). <br /> f) The sum of RI +R2 would give the estimated annual rainfa�I recharge, R,foi use in ffie <br /> above mass balance equation. <br /> A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.