My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
REMOVAL_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2024 10:45:30 AM
Creation date
12/7/2020 10:53:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2020
RECORD_ID
PR0231074
PE
2351
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN ) O A Q U I N Environmental Health Department <br /> C 0 U N T Y <br /> BACKFILL EXCAVATION CERTIFICATE <br /> Project Location : 4627 DaVinci Drive , Stockton , CA 95207 <br /> Owner 7- Eleven #20632 Phone No : <br /> Contractor : L . C . Services Phone No : 559 -444- 1730 <br /> License No : 779267 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1 . Submission of Soil Engineer' s Compaction Report within 30 days of project <br /> completion , or <br /> 2 . Submission of verification , e . g . , load ticket , within 30 days of project completion <br /> that one of the following materials was placed in the excavation in 12 ' lifts : <br /> x A . Pea gravelm-smooth , rounded material not more than one- half ( 1 /2 ) <br /> inch in diameter <br /> B . Crushed rock--self- compacting material not more than three- <br /> quarters ( 3/4 ) inch in cross sectional measurement . ( Use of <br /> crushed rock will not be permitted for backfill if contact will be made <br /> between the backfill material and tanks/pipes made of poly resin <br /> glass or similar materials . ) <br /> DECLARATION <br /> hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 <br /> days of project completion , or submission of verification that the select material <br /> described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be bbackfilled and compacted to insure <br /> compliance with the Uniform Building Code Appendix ,Chapter 70 . <br /> * Name C ' O \ `� \l \C`. <br /> �a nn <br /> Title <br /> Signature <br /> \\ ).6. <br /> l <br /> * Shall be the responsible managing employee on the license or authorized agent . <br /> 10 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.