My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013804
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TEEPEE
>
2300
>
2600 - Land Use Program
>
PA-2000184
>
SU0013804
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2022 8:54:01 AM
Creation date
12/10/2020 8:20:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013804
PE
2631
FACILITY_NAME
PA-2000184
STREET_NUMBER
2300
Direction
N
STREET_NAME
TEEPEE
STREET_TYPE
DR
City
STOCKTON
Zip
95205-
APN
13208011
ENTERED_DATE
12/1/2020 12:00:00 AM
SITE_LOCATION
2300 N TEEPEE DR
RECEIVED_DATE
11/30/2021 12:00:00 AM
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SanJoaqu Valey AIR PO UTtO CO T OL DI RIC L' ,~-January 4, ~.,()20 ~v-I Kelsey Gunter San Joaquin County Community Development Department 1810 E. Hazelton Avenue Stockton, CA 95205 Project: Early Consultation, PA-2000184 (SA) District CEQA Reference No: 20201050 Dear Ms. Gunter: HEA JHY LIV N The San Joaquin Valley Unified Air Pollution Control District (District) has reviewed the project referenced above from the County of San Joaquin (County). The project consists of the construction of a Retail Landscaping Service warehouse and storage area (Project). The Project is located at 2300 N. Teepee Drive, in Stockton, CA (APN 132-080-11) Proiect Scope The Project consists of the construction and operation of a retail landscaping services warehouse and storage area. The project will be split into two phases over 5 years. The first phase will take around 6-8 months to construct and will include an 8,000 square foot building that will be used for work truck storage, outdoor material storage bays will be constructed and screened. A 128 square foot trailer will be placed on the parcel during phase one for the construction office. Phase two will include the removal of the temporary 128 square foot office trailer and the addition to a 200 square foot two story office building to the 8,000 square foot building and the addition of a parking lot. Based on information provided to the District, Project specific annual emissions from construction and operation emissions of criteria pollutants are not expected to exceed any of the following District significance thresholds: 100 tons per year of carbon monoxide (CO), 10 tons per year of oxides of nitrogen (NOx), 10 tons per year of reactive organic gases (ROG), 27 tons per year of oxides of sulfur (SOx), 15 tons per year of particulate matter of 10 microns or less in size (PM 10), or 15 tons per year of particulate matter of 2.5 microns or less in size (PM2.5). Lt cu: a 1101 I ,c r I 12
The URL can be used to link to this page
Your browser does not support the video tag.