Laserfiche WebLink
Document Control ID: <br /> 'ao�w�rvrsoyy FES @ Liberty Road, Galt CA-001 <br /> Revision Date: Revision#: <br /> Safe Work Plan (HASP) 07/02/2018 10 <br /> Owner: <br /> Lic"ES Health & Safety <br /> IW.Nnvvv'•.k N•uperae <br /> Dump pile unearthing Possible hazardous waste content including Tripping/slip hazards likely. Use extreme caution. Tyvek suit, leather or <br /> (hand digging) paint, compressed gas cylinders and e-waste. Evaluate the digging area and scan for biting Neoprene gloves. Full <br /> Heat Stress, lift injuries, biting insects & wildlife (snakes). Take plenty of breaks in the Face Respirator with <br /> tiles. Dust hazards shade and drink fluids to keep hydrated. Be aware P100 cartridges <br /> reptiles. that at any time hazardous materials may be standing by equipment <br /> present and if discovered, all work must cease operator and spotter <br /> pending reevaluation. Wear at a minimum a HEPA at all times. Hard Hat <br /> & hearing protection. <br /> dust mask to protect all personnel within the work HEPA dust mask to be <br /> area. worn by all inside the <br /> work area. <br /> Demobilization from Traffic mishaps, crush & pinch points when Follow posted speed limits. 55 MPH or less Standard Job Site <br /> the project site trailering digging equipment. Tripping while towing. Utilize a spotter while backing PPE <br /> hazards. trailers. Utilize additional lighting if needed to <br /> avoid tripping hazards. <br /> SECTIONAtmospheric <br /> exposure[For assistance determining . . Appendix <br /> List Substance(s) or Material(s) of Monitoring Substance / Material Exposure Action Levels <br /> Concern Below: Instrument Level A Level B Level C Level D <br /> Known Atmospheric Contaminants: N/A N/A X <br /> SECTION . (Document the required Job Task Training) <br /> All personnel should be trained in basic haz' material discovery operations. Insure all assigned personnel have necessary <br /> complete understanding of flammable fluid precautions. Crewmembers must have 40 hr. HAZWOPPER certification with them <br /> onsite. <br /> Unless there is an explosion or fire, shutting down of equipment is secondary to treatment and removal of injured personnel. Be sure to <br /> have LOCAL emergency call numbers and evacuation route known to crew. Spill containment equipment to be onsite prior to any discovery <br /> operations. <br /> SECTIONDecontamination . - • u reS.(Document the Decontamination Pr• • People and Equipment) <br /> Safe Work Plan Liberty Rd Galt Site Cleanup Ju12016 Page 4 of 7 <br />