Laserfiche WebLink
Should any form of Hazardous waste be discovered, cease all <br /> work, shut down motorized equipment and evacuate the site. Any hazardous material discovery <br /> Determine PPE level and respiratory protection required to will result in immediate work <br /> 3.1 protect workers. Establish exclusion area, hot zone and FES stoppage and reevaluation of the <br /> decontamination corridor. Cover the area excavated with 10mil work plan and site safety plan <br /> plastic sheeting and anchor the edges. Utilize 4-Gas meter to <br /> before proceeding <br /> ensure no fugitive emmisions are present such as light <br /> hydrocarbon or sulfide. <br /> Pieces must be cut into <br /> Sort the exposed piles of wood and brick/concrete to expose manageable sections of 8' or <br /> 4 any unknown material beneath. Remove any pressure treated FES less. Wear HEPA dust mask while <br /> wood and telephone poles and place them into the "Treated <br /> wood" bin(s) supplied by FES for transport to Hay Rd. Landfill. cutting to avoid respiratory <br /> hazard. <br /> Cease work at the direction of <br /> 5 Spread any large piles of debris to allow inspection of the FES SJC-EH to allow visual inspection <br /> contents and possible materials beneath. <br /> as directed. <br /> Remove pressure treated wood to landfill in accordance with <br /> 6 FES <br /> local, state and federal regulation. <br /> Removal of non-hazardous C&D may proceed only at the <br /> FES <br /> direction of San Juaquin Environmental health. <br /> 8 Demobilize equipment and waste bins. FES <br />