Laserfiche WebLink
IPROBE CONSTRUCTION LOG <br /> Probe No. 0C lJ - (-}- <br /> P <br /> Site L o c.Q i Project No. 70 / % C 10 Date <br /> Drilling Contractor (rl Log by D Fo/� „ G(• f� <br /> i <br /> DIMENSIONS <br /> A. Total depth of boring 9 ft. <br /> B. Diameter of boring V� in. C D <br /> C. Diameter of probe casing 112 in. <br /> D. Height of casing above grade <br /> 1 ft. <br /> E. Depth of casing below grade <br /> 9 ft. <br /> F_ Perforated casing interval <br /> from ft. to ft. <br /> rG. Permeable material interval I <br /> from ft. to -- ft. <br /> H. Impermeable plug interval <br /> from — ft. to ft_ <br /> I. Backfill interval A <br /> from ft. to -- ft. I <br /> MATERIALS � <br /> I Permeable material <br /> Tm—permeable plug •�: <br /> Backf ill materia <br /> Casing materia d <br /> i CONSTRUCTION <br /> Method of fill placement <br /> Method of casing p acement G D <br /> Pnc u n .717 I d <br /> Comments F Q <br /> .A <br /> C <br /> r <br /> rMandeville & Associates 526 Hofgaarden, City of Industry, CA 91744 1 <br /> rev. 8/85c <br /> r <br />