Laserfiche WebLink
PotentiallyLess Than Less Than <br /> Significant Significant with Significant No <br /> g Mitigation g <br /> Impact Incorporated Impact Impact <br /> III. Air Quality. <br /> Where available, the significance criteria established by <br /> the applicable air quality management or air pollution <br /> control district may be relied upon to make the following <br /> determinations. Would the project: <br /> a) Conflict with or obstruct implementation of the ❑ ❑ <br /> applicable air quality plan? X <br /> b) Result in a cumulatively considerable net increase of <br /> any criteria pollutant for which the project region is � ❑ ❑ ❑ <br /> non-attainment under an applicable federal or state <br /> ambient air quality standard? <br /> c) Expose sensitive receptors to substantial pollutant ❑ ❑ ❑ <br /> concentrations? FX <br /> d) Result in substantial emissions (such as those <br /> leading to odors) adversely affecting a substantial ❑ ❑ ❑ <br /> number of people? <br /> Impact Discussion: <br /> a) Potentially Significant Impact. The project site is located in the San Joaquin Valley Air Basin and is under the <br /> jurisdiction of the San Joaquin Valley Air Pollution Control District.A project would be in conflict with an air quality plan <br /> if it conflicts with or delays implementation of any applicable attainment or maintenance plan. Further analysis is <br /> required to determine whether the Project could potentially conflict with or obstruct implementation of applicable air <br /> quality plans. Therefore, this issue will be analyzed in the Draft EIR. <br /> b) Potentially Significant Impact. Project construction and operations would involve activities that would generate both <br /> short-term and long-term criteria pollutants and other emissions. Further analysis is required to determine whether the <br /> Project could potentially result in any adverse effects related to air quality. Therefore, these issues will be analyzed in <br /> the Draft EIR. <br /> c) Potentially Significant Impact. Project construction and operations would involve activities that would generate both <br /> short-term and long-term criteria pollutants and other emissions that could impact sensitive receptors. Further analysis <br /> is required to determine whether the Project could potentially expose sensitive receptors to substantial pollutant <br /> concentrations. Therefore, this issue will be analyzed in the Draft EIR. <br /> d) Potentially Significant Impact. Project construction and operations would involve activities that would generate short- <br /> term and long-term emissions that could result in odors. Further analysis is required to determine whether potential <br /> Project impacts related to air quality and odors could adversely affect a substantial number of people. Therefore, this <br /> issue will be analyzed in the Draft EIR. <br /> Enter oroiect#s. —Initial Study 10 <br />