My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0082931_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SECTION
>
3325
>
2600 - Land Use Program
>
SR0082931_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 2:28:27 PM
Creation date
12/16/2020 9:55:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0082931
PE
2602
FACILITY_NAME
3325 E SECTION AVE
STREET_NUMBER
3325
Direction
E
STREET_NAME
SECTION
STREET_TYPE
AVE
City
TRACY
Zip
95205
APN
17309033
ENTERED_DATE
11/25/2020 12:00:00 AM
SITE_LOCATION
3325 E SECTION AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 November 2020 AdvancedGeo <br /> Project No. 20-6205 An Employee-Owned Company <br /> Page 8 of 14 .� <br /> 6.3. DESCRIPTION OF THE PERCOLATION TEST HOLE - POST SOAK <br /> On 13 November 2020, the boring was found to be completely dry, intact and in good <br /> condition. <br /> 6.4. PERCOLATION TEST CONFORMED TO SJC POLICY EHD 98-02 <br /> The work was performed in accordance with San Joaquin County Division 11 <br /> Section 9-1105.2 (d) General Requirements. <br /> On 13 November 2020, the percolation test hole was dry after sitting overnight. <br /> Percolation test procedure #2 was performed by adding water to approximately six inches <br /> above the gravel and recording the amount of water remaining in the borehole after 30- <br /> minute intervals. The water level was measured from a fixed reference point at the surface <br /> of the boring using a Solinst water level meter. Measurements were recorded at 30- <br /> minute intervals for four hours. The final measurement was observed by the EHD <br /> inspector. Based on the field measurements collected, the percolation rate for the parcel <br /> was calculated; the Percolation Test Rate Field Sheet is provided in Appendix C. <br /> 6.5. COMPLETED PERCOLATION TEST FORM <br /> After completion of the test, the EHD inspector reviewed the field data and signed the <br /> required EHD Percolation Test Rate form. Field measurements recorded during the test <br /> are included on the Percolation Test Rate Field Sheet provided in Appendix C. <br /> 6.6. POTENTIAL PROBLEMS PREDICTED <br /> On site soils within the shallow percolation test hole demonstrated adequate percolation <br /> rates. <br /> 6.7. PERCOLATION TEST FINDINGS <br /> The shallow percolation test performed provided a satisfactory percolation test rate. The <br /> percolation rate of 50 minutes per inch was calculated from data collected during the four- <br /> hour percolation test; the smallest reading over the four-hour period was used to calculate <br /> the percolation rate. The use of the existing and proposed septic systems should follow <br /> the San Joaquin County On-site Wastewater Treatment Standards. <br /> 7.0. CHEMICAL AND PHYSICAL PROPERTIES OF SOIL <br /> Soil chemical properties were supplied by regionally sourced material for the surrounding <br /> area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.