Laserfiche WebLink
From 11/03/2008 15.44 #164 P 026/033 <br /> UNIFIED PROGRAM CONSOLIDATED PU ' <br /> UNDERGROUND STORAGE TAMC <br /> MONITORING PLAN-(Page I of 2) <br /> TYPE OF ACTION X, NEW PLAN ❑ 2_CHANGE OF INFORMATION 490.1 <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL UST,AT THIS FACILITY 490.2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM( <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> _ 1 <br /> BUSINESS NAME(Sarre as FACILITY NAME) r^ ] <br /> BUSINESS SITE ADDRESS �S f R� 6 103 CITY -- 1� <br /> If.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE i <br /> Testing,preventive maintenance,and calibratipn of monitoring equipment(e.g.,sensors,probes,line leak detectors, etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR�2632�2634,2638,2641). <br /> MONITORING EQUIPMENT IS SERVICED � ANNUALLY ❑ 99.OTHER_(Spe-cify): -'-" - - "- 4434 <br /> III.MONITORING LOCATIONS 490'36 <br /> firl.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. [32.---- <br /> SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634 90-0 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1 CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490.5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> _SECONDARY CONTAINMENT IS: Ef a'._DRY <br /> 1_�0 b.LIQUID FILLED [j c.PRESSURIZED 3(d.UNDER VACUUM 490-6 <br /> ^ _ PANEL MANUFACTURER: dsai. MODEL lf:-�"'"I.� <br /> LEAK SENSOR MANUFACTURER. MODEL#(S): 490-10' <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLEWAI L TANLC(Sl.(23 CCR§2643) d9o•t4 <br /> PANEL MANUFACTURER: 490'12 MODEL# 490-13 <br /> 490.14 ..............•___._._..._,�___-__.�._.,_ <br /> IN-TANK MANUFACTURER: MODEL FREQUENCY N(S): 49045 <br /> ES <br /> LEAK TT FRE .................._--.---._ <br /> Q © a.CONTINUOUS ❑ b.DAILY/NIGHTLY ._--__K•_._. .__. 490.16 <br /> ❑ d.MONTHLY ❑ c.WEEKLY <br /> �_❑ e.OTHER( cify1: ..x47 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p•h. ❑ c.OTHER(Specify): _...�._- '490.11 <br /> 490.19 <br /> 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 4W20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490'21 <br /> S.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-22 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify} 4990.24 <br /> 490.25 <br /> ❑99.OTHER (Specify): <br /> - 490.26 <br /> 490.27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METROD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT W1%AUDIBLE AND 49a2e <br /> VISUAL ALARMS. (23 CCR§2636) <br /> w SECONDARY CONTAINMENT IS,❑a.DRY ❑b.LIQUID FILLED [1c.PRESSURIZED Od.UNDER_V_ACUUM 490-29 <br /> PANEL MANUFACTURER: avo 3o f g9azt <br /> - LEAK SENSOR MANUFACTURER_ � 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e,TURBINE)SHUTDOWN. _ _�a.YES ❑b.NO -~' 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a,yES ❑b.NO 490•]5 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p,h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> -PRODUCT FLOW WHEN A LEAK IS DETECTEDJ23,CCR 490 36 <br /> 490.37 .............................. <br /> MLLD MANUFACTURER(S): MODEL#(S): 490.30 <br /> 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.ph.LEAK PESTS (23 CCR§2636) gy0.]g <br /> 490.d0 <br /> -_ __.•_-_...........__..__................__.__.....__.._.490.41 <br /> LLD MANUFACTURER(S�-_-__ _ -�MODEL#(S):_-_ <br /> PROGRAMMED IN LINE LEAK TEST ❑ 1 MINIMUM MONTHLY 0.2 <br /> g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490.42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. �(a.YES ❑b.NO A90•41 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. 198.YES ❑b.NO 490"44 <br /> ❑ 4.PIPE INTEGRITY TESTING 490.45 <br /> TEST FRE UENCY 0 a.ANNUALLY ❑ b.EVERY 3 YEARS 0 c.OTHER S eci 490 46 490 47 <br /> El S.VISUAL PIPE MONITORING. <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 4911,41 <br /> •A1lowed fix wonho6nit ofurskried emeqtcm enermor&ej 00ing only NSC 23281 3 490.49 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)J. 49050 <br /> 7 NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490.51 <br /> ❑ <br /> 99,OTHER(Specify) 49&52 <br /> A9&53 <br /> I 1pf F I1CT-n it woon t/4 <br />