My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON BELLOTA
>
4391
>
2300 - Underground Storage Tank Program
>
PR0528866
>
INSTALL_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2020 12:03:03 PM
Creation date
12/17/2020 10:55:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2008
RECORD_ID
PR0528866
PE
2351
FACILITY_ID
FA0019340
FACILITY_NAME
FARMINGTON CIRCLE K
STREET_NUMBER
4391
Direction
S
STREET_NAME
ESCALON BELLOTA
STREET_TYPE
RD
City
FARMINGTON
Zip
95230
APN
18713006
CURRENT_STATUS
02
SITE_LOCATION
4391 S ESCALON BELLOTA RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From 11/03/2008 15.48 #164 P 030/033 <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN- PAGE 1 (One form pee facility) <br /> P=8 <br /> N XI,NEW PLAN Q 2.CHANGE OF INFORMATION Rot <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) <br /> BUSINESS SITE ADDRESS Ro3 CITY <br /> R04. <br /> It. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systema and supplements the emergency response plans and procedures in the facility`s Hazardous Materiait <br /> Business Plan. <br /> Y If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-oil,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> A Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> 10- Absorbent material will be used to Contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262-11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and s a ed container. Waste material shall be disposed <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity,has been in contact with any <br /> hazardous material.if the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 rinds <br /> that it is non-hazardous. if the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)fromsumps,spill containers,etc.will not be disposed to storm water systems. <br /> D We will review secondary containment systems for possible deterioration if any of the following conditions occur <br /> I Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete nly if applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> R,o. R-o Rao <br /> R11 R21 R31 <br /> R12 R22 1122 <br /> R13. tt23 P311R14 R24 R34 <br /> R13 R23 R35 <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R40 TITLE Rso <br /> NAME Aa1 TITLE R51 <br /> NAME R42 TITLE R32 <br /> NAME R43 I TITLE R53 <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS; <br /> CI Additional system testing or data collection 0 Inspection by qualified persons O Recalibration of equipment <br /> Other- <br /> Rho <br /> UST Response Plan(3/2008).1/3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.