Laserfiche WebLink
i <br /> i <br /> - _ LEGEND <br /> REFRIGERATION LINE SET (SUCTION & LIQUID), IN COOI_ER [BOX. RE: R2.2 _U <br /> - <br /> REFRIGERATION' LINE SET (SUCTION LQUID). ABOVE COOLER BOX, RE: R2.2. <br /> WALK--IN BOX 0011_ DRAIN EINE, ERE: R2.2-1 <br /> NEW 12"X12" FLOOR DRAIN, BY GENERAL CONTRACTOR, <br /> i I <br /> RE. PLUMBING DRAWINGS & R2,2-1 � � <br /> J--BOX BY GENERAL CONTRACTOR \ <br /> 1 <br /> 1_) <br /> j--BOX FORNISFIED BY GENERAL CONTRACTOR <br /> ca°uo <br /> SPECIAL ELECTRICAL CONNECTION, BY GENERAL CONTRACTOR. u_ <br /> RE: ELECTRICAL DRAWINGERR <br /> ao <br /> W <br /> PIPE UP `d rx Z <br /> zt' r� a <br /> ozor� c <br /> PiH'L. CLOWN <br /> A u x ua F�C7 O <br /> I" alwlwtz oz lul, >w <br /> ( � ISOLATION VALVE <br /> co <br /> XX EQUIPMENT FAC t <br /> zo <br /> ° c <br /> �... <br /> ,K CC 5'u <br /> ldI ?Q zC?c' T <br /> .. _. ..... - a ... ... ... ,.. _. _.. _...... �,-..- ,..,f \..�....__ �-��,.5 fes-s d <br /> .. C,>C^.I IX.3 Q <br /> 77777 :7 <br /> j00 F <br /> _. fZ) <br /> -) m U) <br /> � <br /> Lo 0 <br /> uJ <br /> cy <br /> GENERAL NOTES- <br /> .. B _ <br /> 0 <br /> ---------------- >: <br /> LU <br /> WAI_.K- N � <br /> RF R2 t -__ COOLER —RE: R2.2 �. CONTRACTOR '0 INSTALL EQUIPMENT PER MANUFACTURER"`S i F � m <br /> RE R2.2714 1 _.. - RE; R2.2_...5 RECOMMENDATIONS. <br /> IDq 00 <br /> tt� <br /> U, ON(RACTOR FO COORDINATE EQUIPMENT INSTALLATIONWIFEf AL1_ ca sem. <br /> > c` <br /> .,fNFR TRADES PRIOR 'TO STARVING ANY WORK, � � era <br /> ® <br /> [ .T' � 4✓✓AA <br /> _- <br /> 1 <br /> r E R2 ? ;} <br /> RE: R2,2-3 <br /> MU \l <br /> �w <br /> i <br /> "'C6f <br /> r <br /> Y <br /> ENO <br /> BURR <br /> COOLER :. <br /> z r <br /> SHEET <br /> t �9 <br /> 1 ----------- .......... <br /> { - <br /> 1 COOLER DRAIN CONDENSATE PIPING, RE: R2.2-2 <br /> a ' 21-REEiZEIR DRAIN CONDENSATE PIPING. RE: 82.2--2 <br /> 3 DOOR HEATER <br /> 8 <br /> 3 DOOR <br /> FREEZERE I' A RELIEF VENT HE.AEER I � <br /> E E <br /> RF: R2.�_ <br /> LIQUID LINE SOLENOIDS AND ISOL.AIION VALVES SUPPLIED AND iNSIALLED EKY <br /> 6 -- <br /> --2 I <br /> ! <br /> 5 <br /> �7 2 E E `� CONTRACTOR AT EACH COIL LOCATION OF VALVE TO E E IN SERVICEABLE AREA, <br /> RE: R2.2--1 <br /> J; QREFRIGERATION CONTRACTOR TO FILL OPENINGS WIlFl FOAM INSULATION AFTER <br /> j <br /> �. I_INE:S ARE INSTAL.L.En <br /> � I <br /> ( PAINT EXPOSED CONDENSATE DRAIN LINES WI1FI 'WHITE ENAMEL. <br /> I <br /> E <br /> DRAIN LINE NEATER, 200 WAITS, 120 VOLAS, HARD WIRED FIELD CONNECT' N BY __ <br /> GENERAL CONTRACTOR. �. _, _ _. <br /> PA 1 <br /> 9 ROUTE: REF RIGF RAE-ION LINES UP THRU COOLER BOX AND RUN ABOVE LOX TO ; 08171 09--05--08 <br /> ROOF PENETRATION, A N SF.At. ALL PENETRATIONS. <br /> j I - <br /> �Ia� REFRIGERATION CONTRACTOR TO RUN CONDENSATE LINE FROM BEER COOLER PFS � ­ <br /> �w[ <br /> COILS THRU SECTION OF FREEZER BOX. LINE THRU FREEZER BOX MUST BE � <br /> SLOPED WITH FEAT TAPE PER DETAIL R2,2--2 <br /> r ? V I E Ca <br /> �11 ROUTE; SELF--CONTAINED CASE: CONDENSATE. LINE FROM CASE_ CONNECTION POINT <br /> AND SLOPE TO NEAREST FLOOR SINK. RE. R2.2--1 AND MANUFACTURERSj I CSHQA t_ IJALI"TY CONTROL <br /> 2 ; <br /> RECOMMENDATIONS. 10__2 T2C)C?B <br /> .. <br /> . :.. . <br /> ( <br /> F Z <br /> -cs <br /> REFRIGERATION <br /> 00 <br /> CD <br /> N ! I <br /> r- <br /> , <br /> V) PLAN <br /> ! ! <br /> i <br /> I <br /> T <br /> E <br /> ca <br /> r� <br /> a I� R201 <br /> -0 REFRIGERATION PLAN <br /> G� <br /> SCALE: <br /> co <br /> ORIGINAL T SIZE <br /> v <br /> — -- ' x 36' <br /> 7D o <br />