Laserfiche WebLink
GENERAL NOTES <br /> A <br /> ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF THE 2016 CBC, <br /> 2016 CMC,2016 CPC,2016 CEC,2016 CFC,2016 CAL GREEN CADE,2016 ENERGY STANDARDS, <br /> CITY OF RIPON MUNICIPLE CODE. <br /> NALLI NG SHALL CONFORM WITH THE REQUIREMENTS OF CHAPTER 23 OF THE 2001 IRC UNLESS <br /> NOTED OTHERWISE. THE NAILING REQUIREMENTS IN CHAPTER 23 SHALL BE CONSIDERED AS <br /> MVVWUM REQUIREMENTS. OTHER NOTES AND DETAILS WITHIN THE PLANS MAYREQVIRE MORE <br /> STRANGENT REQUIREMENTS. <br /> THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF ALL TRADES A <br /> AND SHALL CHECK ALL DIMENSIONS ANY DISCREPANCIES SHALL BE CALLED TO THE <br /> ATTENTION OF THE DESIGNER AND SHALL BE RESOLVED BEFORE PROCEEDING WITH THE WORK 00 <br /> THE BUILDING OFFICIAL SHALL APPROVE ANY CHANGES TO THE APPROVED PLANS BEFORE <br /> PROCEEDING WITH THE NEXT PHASE OF WORD <br /> ALL NOTES THROUGHOUT THIS PLAN SET APPLY TO ALL SHEETS WHERE APPLICABLE- 336 EAST MAIN, <br /> ST . <br /> DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS <br /> ARE NOT SPECIFICALLYINDICATED BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, rNI <br /> SASHAR DETAILS OF CONSTRUCTION SHALL BE USED. <br /> CALIFORNIA *RIPON <br /> DRAWING MAY NOT ALWAYS BE TO SCALE. NOTED DIMENSIONS SHALL TAKE PRECEDENCE. <br /> - AP <br /> NO CONSTRUCTION MATERIALS SIF APPLIES/ � - <br /> A <br /> CONCRETE AT 28 DAYS:FOOTINGS AND FOUNDA77ON WALLS ARE DESIGNED FOR 2500 PSI <br /> PROVIDE 3000 PSI CONCRETEFOR QUALITY CONTROL.NO SPECIAL INSPECTIONS OR TESTING REQUIRED. <br /> REINFORC.IINGGRADE: 60KS[ BUILDING DRAWING INDEX BUILDING CODES <br /> MASONRY: Fc MIN. = 1900 PSI PLANS PREPARED FOR <br /> STRUCTURAL STEEL: REGULAR SECTIONS ARE FY=50 KSI; TUBE STEEL IS FY=46 KSI <br /> A00 IND and I <br /> BOLTS FOR STEEL USE A325 <br /> CN-1 CITY NOTES AND CONDITIONS OF APPROVAL <br /> BOLTS FOR LUMBER USE A307(GRADE 2) <br /> #2 DOUG FIR FB= 875 PSI,FC= 1300 PSI,FV=95PSI,E= 1.6E6PSI <br /> Cl CIVIL COVER SHEET <br /> #1 DOUG FIR FB= 1200 PSI,FC= /000 PSI,FY= 85 PSI,E= 1.6E6 PSI , <br /> GBC1 NONRESIDENTIAL MANDATORY MEASURES <br /> PLYWOOD/OSB SW S C_C_D PER PLANS <br /> GBC1.1 NONRESIDENTIAL MANDATORY MEASURES <br /> PLYWOOD ROOF 1 1/4",48124 <br /> PLYWOOD/OSB FLOOR 314"p 48124 C2 GRADING AND DRAINAGE PLAN BUILDING CODE 2016 C B C <br /> GL BEAMS: 24F V4 IN SIMPLE BENDING OR V8 IN DOUBLE BENDING(IF INDICATED) C3 UTILITY PLAN <br /> MICROLAM(LVL) TRUSJOIST MACMILLAN PRODUCTS,E= 1.9E6 PSI DAVINDER JUTLA C4 EROSION CONTROL PLAN <br /> ����,� 3940 N. TRACY CONSTRUCTION TYPE: VB � <br /> C5 HORIZONTAL CONTROL PLAN 1 <br /> 1000 PSF,PER CBC <br /> MIN.BEARING DEPTH: I-0"BELOW FI MSHED GRADE L 1 PLANTING PLAN USE GROUP: M (MERCANTILE) <br /> MIN.FOOTING WIDTH: 18" L2 IRRIGATION PLAN <br /> L3 DETAH S& SPECIFICATIONS <br /> L4 DETAILS USE: FUEL AND C-STORE <br /> ST-1 ARCHITECTURAL SITE PLAN SITE AREA: 19,994 SF <br /> ST-1.1 SITE PLAN DETAILS <br /> A01 FLOOR PLAN AND FINISH SCHEDULES <br /> CONTRACTORS NOTES: Aoz ROOF PLANS and DETAILS <br /> FLOOR AREA: 2,587 SF <br /> PROJECT DIRECTORY A02.1 DETAILS AND SOLAR READY NOTES A <br /> A. IT IS THE <br /> CONTRACTOR S RESPONSIBILITY TO REVIEW ALL PRA WINGS AND A03 EXTERIOR ELEVATIONS TYPE OF CONSTRUCTION: V B = <br /> SPECIFICATIoxs,INCLUDING BUT NOT LIMITED To ARCHITECTURAL, CIVIL, BUILDING DESIGNER. STRUCTURAL ENGINEERING: A04 REFLECTED CEILING PLAN AND DETAILS <br /> STRUCTURAL,MECH"CAL,PLUMBING,AND ELECTRICAL PRIOR To SUBMITTING A DALE CHRISTIAN ENGINEERS A05 BUILDING SECTIONS and INTERIOR ELEVATIONS <br /> BID.REPORT ANY DISCREPANCIES TO ARCHITECT OR ENGINEER PRIOR TO BID AND M/C DESIGN INC FIRE SPRINKLER SYSTEM: N O <br /> DURING CONSTRUCTION,BY SUBMITTING RFT. SANTA ANA, CA 1744 S KATELLA#107 AOS•1 DETAILS <br /> B. BIDDERS ARE TO VISIT THE SITE AND FAMILIARIZE THEMSELVES WITH EXISiTING ANACORTES, WA ORANGE, CA 92867 A07 DETAILS 8 <br /> CONDITIONS AND SATISFY THEMSELVES AS TO THE NATURE AND SCOPE OF THE PH:714,997-1145 A07 FLOOR FINISH PLAN P A R K l N G PROVIDED: A <br /> WORK. TILE SUBMISSION OF A BID WILL BE EVIDENCE THAT SUCH AN EXAMINATION PH:7I4�56 105 A08 RESTROOM PLAN and DETAILS <br /> HAS BEEN MADE. LATER CLAIMS FOR LABOR,EQUIPMENT, OR MATERIALS REQUIRED, ATTN. KA TRINA RIDDLE CONTACT: RICHARD 6 6 <br /> H COULD HAVE BEEN FORESEEN A M CDESIGNINC.COM OCCUPANCY LOAD: � <br /> OR FOR ANYDIFFICULTIES ENCOUNTERED WHICH KATRIN 0 1 <br /> HAD AN EXAII�IINATION BEEN MADE, WILL NOT BE ALLOWED. G 1 ACCESSIBILITY DETAILS ' <br /> C. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ARCHITECT, G2 ACCESSIBILITY DETAILS <br /> LANDLORD, <br /> OR TENANT OF ANY DISCREPANCIES ENCOUNTERED ON THE PLANS OR G3 ACCESSIBILITY DETAH S ► <br /> IN EXISTING SITE CONDITIONS PRIOR TO SUBMISSION OF BID. <br /> D. CONTRACTOR DURING PRE-BID SITE VISIT,SHALL TAKE NOTICE OF ANY VISUALLY Y01 MERCHANDISING and GRAPHICS PLAN <br /> APPARENT CODE VIOLATIONS AND ALLOW IN HIS/HER BID FOR CORRECTING SUCH <br /> Yoe COOLER SPECIFICATIONS <br /> VIOLATIONS. <br /> E. CONTRACTORS ARE CAUTIONED TO COORDINATE ITEMS IN THEIR SCOPE OF WORK y <br /> WITH OTHER TRADES SN-1 <br /> (,-1 STTRRA13 r AJ ETFUCTURAL GENERAL NOTES <br /> F. THESE NOTES APPLY TO ALL SHEETS. <br /> F WORK LISTED IN THE "FACILITIES SN-2 STRUCTURAL GENERAL NOTES <br /> G BIDDERS To INCL UDE ALL WRITTEN SCOPE O <br /> S1.0 FOUNDATION PLAN <br /> INSPECTION REPORT"PROVIDED BY THE OWNER. . <br /> DESIGN STANDARDS S2.0 FRAM1NGPLAN <br /> A SD-1 TYPICAL FRAMING DETAILS clra <br /> SD-2 STRUCTURAL DETAILS <br /> DESIGN PHASE DESIGN REVIEW. CA <br /> LL <br /> REQUIRED SUBMITTALS (UNDER SEPARATE PERMIT) Mol HVAC DETAILS AND NOTES . <br /> 1. DESIGN REVIEWER REQUIREMENTS.FOR BUILDINGS LESS THAN 10,000 SQUARE FEET, M02 HVAC FLOOR PLANIROOF PLAN <br /> DESIGN PHASE DESIGN REVIEW MAYBE COMPLETED BY THE DESIGN ENGINEER. M03 T-24 PLAN <br /> 1. SIGNAGE. BUILDINGS BETWEEN 10,000 AND 5 0,00 0 SQUARE FEET REQUIRE COMPLETION OF THE <br /> M04 T-24 PLAN <br /> 2. FUEL CANOPY DESIGN REVIEW CHECKLIST BY EITHER AN ENGINEER IN471OUSE TO THE DESIGN FIRM M05 GAYLORD HOOD DRAWINGS <br /> BUT NOT ASSOCIATED WITH THE BUILDING PROJECT, OR A THIRD PARTY DESIGN <br /> 3. ENGINEER.FOR BUILDINGS LARGER THAN 50,000 SQUARE FEET OR FOR BUILDINGS Poo PLUMBING DETAILS <br /> 4• WITH COMPLEX MECHANICAL SYSTEMS,ANINDLPENDENT,REVIEW OF THESE <br /> DOCUMENTS BY A THIRD PARTY DESIGN ENGINEER IS REQUIRED. P01 PLUMBING DETAILS AND NOTES <br /> P02 WASTE AND VENT FLOOR PLAN <br /> NOTE: <br /> ALL DEFERRED SUBMITTALS MUST BE FIRST SUBMITTED TO ENGINEER OF 2. DESIGN REVIEW:DURING THE SCHEMATIC DESIGN PHASE OF THE BUILDING PROJECT, P03 PLUMBING SUPPLY PLAN <br /> RECORD FOR REVIEW AND COORDINATION,AND MUST BE FOUND TO BE THE OWNER OR OWNER S REPRESENTATIVE,DESIGN TEAM AND DESIGN REVIEWER <br /> ACCEPTABLE WITH NO EXCEPTIONS,PRIOR TO SUBMITTING THEM TO THE MUST MEET TO DISCUSS THE PROJECT SCOPE, SCHEDULE AND HOW THE DESIGN ESI-1 ELECTRICAL SITE PLAN IS THE CURRENT DRAWING SET REVISION NUMBER <br /> Y. REVIEWER WILL COORDINATE WITH THE PROJECT TEAM. THE BUILDING OWNER OR <br /> OWNER S REPRESENTATIVE SHALL INCL UDE THE DESIGN REVIEW CHECKLIST CJT <br /> ESI-2 SITE PHOTOMETRIC <br /> COMPLIANCE FORM IN THE CERTIFICATE OF COMPLIANCE DOCUMENTATION(SEE ESI-3 CANOPY PLAN <br /> ESI-4 CANOPY DETAILS <br /> SECTION 10-103). <br /> N s-2�-� BLDG <br /> E01 ELECTRICAL LIGHTING PLAMARK DATE .' <br /> REVISIONS SUBMITTALS 3. CONSTRUCTION DOCUMENTS DESIGN REVIEWTHE CONSTRUCTION E02 ELECTRICAL POWER PLAN INITIAL <br /> DESIGN REVIEW COMPLIANCE FORM LISTS THE ITEMS THAT SHALL BE CHECKED BY E02.1 ELECTRICAL EQUIPMENT PLAN 336 MAIN ST. <br /> THE DESIGN REVIEWER DURING THE CONSTRUCTION DOCUMENT REVIEW. THE <br /> 1. TRUSSES COMPLETED FORM SHALL BE RETURNED TO THE OWNER AND DESIGN TEAM FOR E03 PANEL SCHEDULES AND ONE LINE DIAGRAM <br /> REVIEW AND SIGN-OFF. THE BUILDING OWNER OR OWNERS REPRESENTATIVE SHALL E03.1 ELECTRICAL SCHEDULE MOBI <br /> RIPON, CA <br /> INCLUDE THIS CONSTRUCTION DOCUMENTS DESIGN REVIEW COMPLIANCE FORMIN E04 SALES AREA EQUIPMENT ELEVATIONSREVISION 2 <br /> THE CERTIFICATE OF COMPLIANCE DOCUMENTATION(SEE SECTION 10-103). E05 ENERGEY CODE-INDOOR EM 291 - WOOD - PROTOTYPE <br /> COMMISSIONING MEASURES SHOWN IN THE CONSTRUCTION DOCUMENTS INCLUDE EIS•1 ENERGY CODE -INDOOR INDEX AND DESIGN <br /> COMMISSIONING MEASURES OR REQUIREMENTS IN THE CONSTRUCTION DOCUMENTS E05.2 ENERGY CODE -OUTDOOR PAR"ET ERS <br /> (PLANS AND SPECIFICATIONS). COMMISSIONING MEASURES OR REQUIREMENTS SHOULD E05.3 ENERGY CODE-OUTDOOR <br /> BE CLEAR, DETAILED AND COMPLETE TO CLARIFY THE COMMISSIONING PROCESS. THESE <br /> REQUIREMENTS SHOULD INCLUDE THE LIST OF SYSTEMS AND ASSEMBLIES CO FUEL SYSTEM DRAWINGS COVER SHEET MILESTONES <br /> COMMISSIONED, TESTING SCOPE, ROLES AND RESPONSIBILITIES OF CONTRACTORS, TL 1 SITE PLAN AND DISPENSER UNITS <br /> REQUIREMENTS FOR MEETINGS, MANAGEMENT OF ISSUES, THE COMMISSIONING PROJECT PHASE DATE INITIALSSS# # SHEET <br /> SCHEDULE, OPERATIONS AND MAINTENANCE MANUAL DEVELOPMENT AND OF TRAINING TL2 VENT NOTES&DETAILS ISSUED FOR PLANNING <br /> AND CHECKLIST AND TEST FORM DEVELOPMENT,EXECUTION AND DOCUMENTATION. TL3 TANK NOTES &DETAILS ANAL X.1664 ISSUED FOR PERMIT JOB#Project <br /> INCLUDE,FOR INFORMATION ONLY,ROLES OF NONCONTRACTOR PARTIES. A L. 714- 56-11098221 Number ` OO <br /> TL4 TANK NOTES&DETAILS TEL. 714-856-I 105 ISSUED FOR BID x <br /> E1 DISPENSER ELECTRICAL MJCDESIGN1@YAH00.COM ISSUED FOR CONSTRUCTION SCALE: AS NOTED <br /> E2 DISPENSER DETAILS Do not use drawing for <br /> construction unless initialed <br />